Attachment_J-2_Pricing_Sheet_01.29.18.xls

XLS spreadsheet 64 KB Posted

Attached to
Caisson 2 Federal contract opportunity
Solicitation number
N4523A18R1050
Issued by
Department of the Navy Naval Sea Systems Command

About this file

J-2 Attachment Pricing Sheet

View the file

Other files for this federal contract opportunity

Other files attached to Caisson 2, newest first.
File Type Posted
N4523A18R1050_P0005_16FEB2018.pdf PDF
Caisson__2_SOW_Errata_One_POP_Update_16FEB2018.pdf PDF
N4523A18R1050_0004_1FEB2018.pdf PDF
N4523A18R1050_00003.pdf PDF
Pictures.zip ZIP file
N4523A18R1050_00002.pdf PDF
Attachement_J-2_pricing_sheet_23JAN2018.xls XLS spreadsheet
N4523A18R1050_0001.pdf PDF
Caisson__2_SOW_Errata_One.pdf PDF
Photo&drawings.zip ZIP file
Attachment_J-2_Pricing_Sheet.xls XLS spreadsheet
Attachment_J-5_Corporate_Experience_Data_Sheet_17_Nov_17.doc DOC document
Attachment_J-1_Statement_of_Work.docx DOCX document
N4523A18R1050_Solicitation.docx DOCX document
Attachment_J-3_Request_for_Clarifications_7_Dec_17.doc DOC document
Exhibit_A__CDRL_and_DIDs.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price

INSERT CONTRACTOR/COMPANY NAME HERE
Project =Caisson #2DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HLABOR PRICEMATERIAL PRICEM/HLABOR PRICEMATERIAL PRICEOther Direct Cost (ODC)1G&APROFITLine Item Total3
1.4Arrival Conference$0
1.5Required Documents$0
1.6Progress Meetings$0
1.7Availability Requirements$0
1.8Care of Vessel$0
1.11CFR Reports$0
1.16Preservation OQE$0
1.17Environmental/Hazwaste Managemment$0
1.22Gas Free$0
1.23Test Plan$0
3.1Docking & Undocking$0
3.2.1Hull Repairs (Reservation Tasking)2586$2,857$2,857
3.2.2Identify Distinguishing Figures & Markings$0
3.2.3Rubber Fender$0
3.2.4Zinc Anodes$0
3.2.5Boarding Ladder$0
3.2.6Superflood Suction$0
3.2.7Flood Through Cover Plate and Fasteners$0
3.2.8Rubber Seal Inspections$0
3.2.9Joint Filler Repair$0
3.2.10Hull Blasting and Preservation$0
3.2.11Hull and Freeboard Visual Inspection$0
3.2.12Hull and Freeboard Pre-inspection$0
3.2.13Hull and Freeboard Final Inspection$0
3.3.1Vent Fan Modification$0
3.4.1Tank Repairs (Reservation Tasking)24949$8,570$8,570
3.4.2Open, Pump, Clean, Ventilate, & Gas Free Tanks$0
3.4.3Identify Distinguishing Figures & Markings$0
3.4.4Tank & Voids Visual Inspection$0
3.4.5Zinc Anodes$0
3.4.6Tank Blast and Preservation$0
3.4.7Main & Trim Tanks Scuttle Preservation$0
3.4.8Bolted Watertight Hatch Preservation$0
3.4.9Tank Pre-Closeout Inspection$0
3.4.10Tank/Void Closeout Inspection$0
3.5.1Identify Distinguishing Figures & Markings$0
3.5.2Weather Deck Non-Skid Repairs$0
3.5.3Visual Inspections Structual Defects$0
3.5.430" Escape Hatch Repair and Preservation$0
3.5.5Access Enclosure Repairs$0
3.5.6Roller Chock Inspection$0
3.5.7Weather Deck Final Inspection$0
3.6.1Machinery Systems (Reservation Tasking)2701$11,290$11,290
3.6.2Dewatering Pump/Motor Removals$0
3.6.3Repair Dewatering Pump Assembly$0
3.6.4Wear, Fit, and Defect Inspection$0
3.6.5Impeller & Casing Inspection$0
3.6.6Dewatering Pump Assembly and Alignment$0
3.6.7Superflood Pump/Motor Removal$0
3.6.8Repair Superflood Pump Assembly$0
3.6.9Wear, Fit, and Defect Inspection$0
3.6.10Impeller & Casing Inspection$0
3.6.11Pump Assemble/ and Alignment$0
3.6.12Ventilation Fan Repair$0
3.7.1Electrical Systems (Reservation Tasking)242$278$278
3.7.2Dewatering Pump Motor Inspeciton & Repair$0
3.7.3Dewatering Pump Motor Assembly$0
3.7.4Dewatering Pump Motor No-Load Test$0
3.7.5Assemble Dewatering Pump/Motor Assembly$0
3.7.6Install Motor/Pump Assembly$0
3.7.7Operational Testing Dewatering Motor/Pump Assembly$0
3.7.8Superflood Pump/Motor Inspection & Repair$0
3.7.9Superflood Pump/Motor Assembly$0
3.7.10Superflood Pump/Motor No-Load Test$0
3.7.11Assemble Superflood Pump/Motor$0
3.7.12Install Motor/Pump Assembly$0
3.7.13Operational Testing Superflood Motor/Pump Assembly$0
3.7.14Space Heater Repair$0
3.7.15Space Heater Modification$0
3.8.1Piping Repairs (Reservation Tasking)2523$34,585$34,585
3.8.2Remote Valve Operator Extension Shaft Assemblies Inspeciton & Repair$0
3.8.3Valve Actuator Repairs$0
3.8.4Valve Actuator Op Test$0
3.8.5Valve Repairs$0
3.8.7Superflood/Dewater Check Valves Inspection$0
3.10.2Dock Trials$0
Column Totals36801$0$57,5800$0$0$0$0$0$57,580
RCC Rate Price Contribution$150,000
Total Evaluated Price$207,580
Proposed RCC Labor Rate4$ - 0
Proposed RCC Material Burden Rate40%

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* 1ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

2For reservation taskings, G&A and Profit dollars shall be evenly applied to the total hour and material dollars established in the applicable reservation tasking (i.e. 10% of total hour and material dollars consumed equals 10% of G&A and profit consumed).

3Column Totals/Line Item Total (Cell L80) shall match the offeror's total price of the basic contract line item number (CLIN) 0001 found in Section B.

4Proposed RCC Rates for growth or new work.

NOTE: Please fill in within the yellow highlighted boxes, the proposed G&A and proposed Profit rates.

Prime RCC Rates

INSERT CONTRACTOR/COMPANY NAME HERE
Project =Caisson #2Date =0
HoursRate $1Price $
Request for Contract Change (RCC) Labor Rate10,0000
Material$150,000
2Material RCC Burden RateInsert Rate (%)
Total Material PriceMaterial * (1+Material Rate)$150,000
3RCC Rate Price Contribution$150,000
1Rate should include all burdens associated with labor(fringe, overhead, G&A,profit, etc.)
2Rate should include all burdens associated with material (handling, overhead, G&A, profit, etc.)
3Total Evaluated Price Contribution is the weighting factor assigned to the proposed RCC rates. This value is for evaluation purposes only. The proposed RCC rates are the agreed to rates for the negotiation of future growth or new work associated with this contract.

NOTE: Please fill in within the yellow highlighted boxes, the proposed RCC Labor rate and proposed Material RCC Burden rate.

File details come from the government source that posted it.