Attachement_J-2_pricing_sheet_23JAN2018.xls

XLS spreadsheet 47 KB Posted

Attached to
Caisson 2 Federal contract opportunity
Solicitation number
N4523A18R1050
Issued by
Department of the Navy Naval Sea Systems Command

About this file

updated J-2 Attachment

View the file

Other files for this federal contract opportunity

Other files attached to Caisson 2, newest first.
File Type Posted
N4523A18R1050_P0005_16FEB2018.pdf PDF
Caisson__2_SOW_Errata_One_POP_Update_16FEB2018.pdf PDF
N4523A18R1050_0004_1FEB2018.pdf PDF
Attachment_J-2_Pricing_Sheet_01.29.18.xls XLS spreadsheet
N4523A18R1050_00003.pdf PDF
Pictures.zip ZIP file
N4523A18R1050_00002.pdf PDF
Caisson__2_SOW_Errata_One.pdf PDF
N4523A18R1050_0001.pdf PDF
Photo&drawings.zip ZIP file
N4523A18R1050_Solicitation.docx DOCX document
Attachment_J-3_Request_for_Clarifications_7_Dec_17.doc DOC document
Exhibit_A__CDRL_and_DIDs.pdf PDF
Attachment_J-1_Statement_of_Work.docx DOCX document
Attachment_J-2_Pricing_Sheet.xls XLS spreadsheet
Attachment_J-5_Corporate_Experience_Data_Sheet_17_Nov_17.doc DOC document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

INSERT CONTRACTOR/COMPANY NAME HERE
Project =Caisson #2DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HLABOR PRICEMATERIAL PRICEM/HLABOR PRICEMATERIAL PRICEOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0
1.5Required Documents$0
1.6Progress Meetings$0
1.7Availability Requirements$0
1.8Care of Vessel$0
1.11CFR Reports$0
1.16Preservation OQE$0
1.17Environmental/Hazwaste Managemment$0
1.22Gas Free$0
1.23Test Plan$0
3.1Docking & Undocking$0
3.2.2Identify Distinguishing Figures & Markings$0
3.2.3Rubber Fender$0
3.2.4Zinc Anodes$0
3.2.5Boarding Ladder$0
3.2.6Superflood Suction$0
3.2.7Flood Through Cover Plate and Fasteners$0
3.2.8Rubber Seal Inspections$0
3.2.9Joint Filler Repair$0
3.2.10Hull Blasting and Preservation$0
3.2.11Hull and Freeboard Visual Inspection$0
3.2.12Hull and Freeboard Pre-inspection$0
3.2.13Hull and Freeboard Final Inspection$0
3.3.1Vent Fan Modification$0
3.4.2Open, Pump, Clean, Ventilate, & Gas Free Tanks$0
3.4.3Identify Distinguishing Figures & Markings$0
3.4.4Tank & Voids Visual Inspection$0
3.4.5Zinc Anodes$0
3.4.6Tank Blast and Preservation$0
3.4.7Main & Trim Tanks Scuttle Preservation$0
3.4.8Bolted Watertight Hatch Preservation$0
3.4.9Tank Pre-Closeout Inspection$0
3.4.10Tank/Void Closeout Inspection$0
3.5.1Identify Distinguishing Figures & Markings$0
3.5.2Weather Deck Non-Skid Repairs$0
3.5.3Visual Inspections Structual Defects$0
3.5.430" Escape Hatch Repair and Preservation$0
3.5.5Access Enclosure Repairs$0
3.5.6Roller Chock Inspection$0
3.5.7Weather Deck Final Inspection$0
3.6.2Dewatering Pump/Motor Removals$0
3.6.3Repair Dewatering Pump Assembly$0
3.6.4Wear, Fit, and Defect Inspection$0
3.6.5Impeller & Casing Inspection$0
3.6.6Dewatering Pump Assembly and Alignment$0
3.6.7Superflood Pump/Motor Removal$0
3.6.8Repair Superflood Pump Assembly$0
3.6.9Wear, Fit, and Defect Inspection$0
3.6.10Impeller & Casing Inspection$0
3.6.11Pump Assemble/ and Alignment$0
3.6.12Ventilation Fan Repair$0
3.7.2Dewatering Pump Motor Inspeciton & Repair$0
3.7.3Dewatering Pump Motor Assembly$0
3.7.4Dewatering Pump Motor No-Load Test$0
3.7.5Assemble Dewatering Pump/Motor Assembly$0
3.7.6Install Motor/Pump Assembly$0
3.7.7Operational Testing Dewatering Motor/Pump Assembly$0
3.7.8Superflood Pump/Motor Inspection & Repair$0
3.7.9Superflood Pump/Motor Assembly$0
3.7.10Superflood Pump/Motor No-Load Test$0
3.7.11Assemble Superflood Pump/Motor$0
3.7.12Install Motor/Pump Assembly$0
3.7.13Operational Testing Superflood Motor/Pump Assembly$0
3.7.14Space Heater Repair$0
3.7.15Space Heater Modification$0
3.8.2Remote Valve Operator Extension Shaft Assemblies Inspeciton & Repair$0
3.8.3Valve Actuator Repairs$0
3.8.4Valve Actuator Op Test$0
3.8.5Valve Repairs$0
3.8.7Superflood/Dewater Check Valves Inspection$0
3.10.2Dock Trials$0
Column Totals0$0$00$0$0$0$0$0$0

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the proposed G&A and proposed Profit rates.