N4215819Q0041_-_Amendment_1_-_0003.pdf
PDF 205 KB Posted
- Attached to
- Rental of One HAZMAT Container
- Solicitation number
- N4215819Q0041
About this file
The first Amendment, titled 0003, is now available. No prior Amendments have been issued.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_2_-_Enclosure_2.docx | DOCX document | |
| Attachment_1_-_Enclosure_1.doc | DOC document | |
| Attachment_5_-_Tech_Capability_Cert.docx | DOCX document | |
| Solicitation_-_N4215819Q0041.pdf | ||
| Attachment_4_-_Enclosure_4.docx | DOCX document | |
| Attachment_3_-_Enclosure_3.docx | DOCX document | |
| Solicitation_-_N4215819Q0041.pdf | ||
| Technical_Capabilities_Cert.pdf | ||
| Attachment_4_-_Enclosure_4.docx | DOCX document | |
| Attachment_2_-_Enclosure_2.docx | DOCX document | |
| Attachment_3_-_Enclosure_3.docx | DOCX document | |
| Attachment_1_-_Enclosure_1.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4215819RC90971
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
1. Provide an answ er to a bidder question.
2. Revise the Statement of Work paragraph 5.5 to correct language concerning electrical requirements to match paragraph 8.9.
Please see continutation pages for Summary of Changes.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4215819Q0041
X 9B. DATED (SEE ITEM 11)
02-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Aug-2019
CODE
NORFOLK NAVAL SHIPYARD
ATTN: WILLIAM WEBB
CVN FLEET SUPPORT
C432, BLDG 65, 2ND FLOOR
PORTSMOUTH VA 23709-1022
N42158 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4215819Q0041
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
1. The following Bidder Question and Answer shall be considered when sibmitting quotations for solicitation N42158-19-Q0041:
Question 1 – Will 240 single phase power be accepted?
Answer 1 – No, it has to be 480 single phase, IAW Paragraph 5.5 & 8.9.
2. Paragraph 5.5 of the Statement of Work was changed from “440/240V” to “480/240V” to correct language concerning electrical requirements to match paragraph 8.9.
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
STATEMENT OF WORK
One 20-ft HAZMAT Container
Contractor shall provide one (1) HAZMAT container with minimum dimensions of 8’ width x 9’ height x 20’ length. Contractor shall provide all labor, materials, equipment, tools, transportation and supervision necessary to provide, install, and remove the HAZMAT container in support of the Bush Project at Dry-Dock 8.
This specification covers the design, fabrication, quality assurance, delivery, removal, and onsite assistance of HAZMAT container for use in Norfolk Naval Shipyard in Portsmouth, VA.
The HAZMAT Container shall be leased for one base-year (12-months) and includes the option to extend the period of performance for two (2) one-year option periods.
The HAZMAT container shall provide a space that is suitable for the storage of hazardous material. It shall contain a sump to collect leakage and a dry chemical fire suppression system as described in the following sections.
1. Government Responsibility
1.1 Government shall provide contractor ready access to the job location during contractor’s working hours (i.e., weekdays between the hours of 7:30 AM and 4:00 PM). Emergent services outside these hours will require government approval and will be no cost to the government. The government is responsible for the cost of all additional approved or requested maintenance and repairs not specifically covered under this Agreement or any applicable warranties. The government will prevent anyone other than contractor from maintaining, repairing or modifying its product.
1.2 NNSY is an industrial facility, therefore, wear and tear beyond what is normal wear and tear is typical and should be expected
1.3 The government agrees to, upon satisfactory delivery and installation; connect HAZMAT container to temporary services. The government will also have temporary services disconnected upon completion of the contract in order to allow the contractor to remove the container from the shipyard.
1.4 Technical POC: TBD upon award
1.4.1 Phone Number: TBD upon award
1.4.2 Email Address: TBD upon award
1.5 Certifying POC: TBD upon award
1.5.1 Phone Number: TBD upon award
1.5.2 Email Address: TBD upon award
2. References
2.1. Enclosure 1 (drawing)
2.2. Enclosure 2 (drawing)
2.3. Enclosure 3 (drawing)
2.4. Enclosure 4 (list)
3. Contractor Responsibilities
3.1. Provide all HAZMAT containers to Norfolk Naval Shipyard in Portsmouth, VA, to an agreed upon location with the Shipyard POC.
3.2. Delivery crew security clearance request is required for shipment offload within the Controlled Industrial Area at NNSY. Contractor shall arrange the Security clearance request with the pass office at NNSY.
3.3. The contractor shall dispatch a representative within 24 hr. of notification in order to activate fire suppression system after the Government has connected temporary utilities.
3.4. The contractor shall dispatch a representative in response to a service request to repair and/or replace any equipment within 24 hours of notification by Norfolk Naval Shipyard at no additional charge.
3.5. Provide representative within 24 hours in order to modify units in the event the customer determines the units do not meet contract specifications.
3.6. Before any leased/purchased temporary production facility will be accepted by the government an inspection at NNSY will be performed to ensure that the contractor has provided a product that conforms to the agreed upon specifications. If the inspection is not satisfactory, the contractor has 3 business days to correct the discrepancies (at contractor’s cost) or the temporary production facility will not be accepted by the government.
3.7. Upon completion of the contract, the contractor will provide all labor, materials, equipment, tools, transportation and supervision necessary to breakdown the HAZMAT containers and remove them from the shipyard.
3.8. Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal OSHA requirements for hazardous energy control lAW 29 CFR 1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in NAVSEA's Occupational Safety, Health, and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact (TPOCs) and/or Contracting Officer's Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work require the NNSY TPOCs and/or CORs be informed of the change/deviation. Appendix 250.8-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name labels and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.
3.9. Contractors and NNGA's may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY's public access web site:
http://www.navsea.navy.mil/shipyards/norfolk/default.aspx
3.10. Names and contact information for NNSY LOTCs and/or the Facility Custodian will be provided by NNSY TPOC and/or CORs set forth elsewhere in this award document."
3.11. The contractor shall set the box in the proper location, designated by the technical POC and provide a representative within 24-hours notification of connection to temporary services to activate the automatic fire suppression system.
4. Guiding Documents
3.1 Resulting project shall comply with all governing codes and Naval Standards including the most recent Unified Facilities Criteria, International Building Code 2012, ADA and Requirements for Lifting Equipment. Guiding Documents:
3.2 United Facilities Criteria (UFC) 1-200-01, 3-301-01, 3-600-01
3.3 National Fire Protection Association (NFPA) 1, Fire Code
3.4 National Fire Protection Association (NFPA) 70, National Electrical Code (NEC)
5. General Requirements
5.1. Shall have a minimum sump capacity of 850 gallons
5.2. A/C and heat required to maintain unit at 70 degrees at all times, year round
5.3. Shall have a dry chemical fire suppression system which meets all NFPA, and OSHA requirements.
5.4. Shall have a minimum 120/240V, 100A, 3 wire, single phase UL listed load center (NEMA 3R)
5.5. Shall have exterior camlok connection box feeding a 600V, 40A 2-pole circuit breaker enclosed in a
NEMA 3R enclosure feeding a 15kva, 480/240V primary:240/120V secondary, single-phase transformer.
This transformer to provide power to load center. See enclosure (1) and (2).
5.6. Shall be in compliance with applicable NFPA and NEC requirements
6. Maintenance Requirements
6.1. Equipment replacement/repair for any item, and or, components other than items and or components damaged by negligence.
6.2. Fire suppression system repair and troubleshoot as needed.
6.3. Door repair/replacement as needed based on normal wear.
6.4. Quarterly A/C filter changes and replacements as needed per periodic maintenance plan
7. HAZMAT Enclosure Requirements
7.1. Provide a decal on each unit with the following information: Contractor company name, contract number and a unique number. The unique number must be different on each unit. The decal shall have the following: minimum of 8.5” x 11” in size, white in color with black writing. The decal is to be located on one of the doors of the unit. If the half of the unit does not have a door, an 11/3” x 4” at minimum label shall be placed on the electrical panel on the inside of the unit.
7.2. Hurricane proof to 110 MPH winds also must be water resistant.
7.3. All doors are to swing outward. Cipher locks are not required for the HAZMAT containers; however, the doors must be capable of being locked. Multiple sets of keys shall be provided to the Shipyard POC and key replacements must be provided upon request from the customer.
7.4. Energy efficient heat pump in each HAZMAT enclosure, in all cases, the unit must be able to maintain 70 degrees Fahrenheit in summer or winter. The unit shall be energy star rated.
7.5. Provide (1) one fire extinguisher at each door (dry chemical NIIN: 4210-01-467-3616)
7.6. There shall be no windows in the units.
7.7. Floor covering shall be a steel grate allowing the flow of hazardous material directly into the sump. The steel grating shall be designed to withstand the exposure to hazardous material.
7.8. Identification on the box shall clearly identify the enclosure as a hazardous material storage area and entry into the enclosure includes the risk of direct exposure to hazardous material.
8. Electrical Requirements
8.1. One row of surface mount fluorescent twin tube strip type interior light fixtures with energy efficient electronic ballast and 32 watt fluorescent bulbs. Mount in center of enclosure. Light fixtures shall be blast proof.
8.2. All Wire must be THHN or THWN, 75 degrees Celsius (min), size as indicated. Do not substitute wiring type/temperature rating unless the ampacity of wire and conduit fill requirements are evaluated to ensure NEC compliance.
8.3. Electrical Metallic Tubing (EMT) is specified on drawings. The NEC requires EMT to be supported within 3 ft of each box or conduit body and supported every 10 ft (min).
8.4. Liquid Tight Flexible Metal Conduit (LFMC) may be used on the exterior instead of EMT. The NEC requires LFMC to be supported within 1 ft of each box or conduit body and supported every 4.5 ft (min).
8.5. The NEC requires the following color code:
8.6. Neutral (grounded conductor) = white
8.7. Note: may be phased taped white if larger than #6 AWG
8.8. Ground (Equipment grounding conductor) = green
8.9. Exterior wiring to include a camlok connection box feeding a 600 Volt, 40 amp, 2 pole circuit breaker enclosed in a NEMA 3R circuit breaker enclosure. This is to feed a 15 kva, 480/240 volt primary, 240/120 volt secondary single phase transformer (see enclosure (2)). See enclosure (4) for a list of exterior equipment. Equivalent material may be substituted.
8.10. Contractor may use a fusible disconnect switch, NEMA 3R with current limiting fuses rated the same size as the circuit breaker in the enclosure (2) ( PC-4 and PC-5).
8.11. Receptacles: 120 volt, 20 Amp Quad type receptacle wired on a #12 AWG (min of two Quad Receptacles per circuit). Provide (1) ea 120 volt, 15 amp duplex GFCI test type receptacle wired on a dedicated circuit mounted on the exterior in a weatherproof box beside the HVAC unit.
8.12. A typical transformer wiring diagram is shown in enclosure (3) in the drawing, use the manufacturers wiring schematic to connect transformer (schematic usually located on front panel of transformer).
Transformer size may be adjusted depending on load demand of HAZMAT enclosure.
8.13. Input connections of the HAZMAT container electrical system shall be per NEC requirements and using camlok receptacles (see enclosure (1)).
8.14. Transformer frame shall be bonded to unit frame using appropriate size bonding jumper from NEC table 250.122, per NEC.
8.15. Wiring of units electrical system shall comply NFPA 70 (National Electric Code) where applicable.
9. Relocation
9.1. In the case that Norfolk Naval Shipyard needs to relocate the unit the following must be provided:
9.1.1 Units shall be stiffened as required to eliminate swaying of the upper units.
9.1.2. Units are to be outfitted with suitable attachments for overhead AND forklift lifting.
9.1.2.1 For multiple point lifts, each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength. For single point lifts, the lifting attachment shall be capable of supporting the gross weight of the equipment with a design factor of five to one based on ultimate strength..
9.1.2.2. For multiple point lifts, each lifting attachment shall accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment. For single point lifts, the lifting attachment shall accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting the gross weight of the equipment.
9.1.2.3. Design of the lifting attachments shall be such that the attachments and shackles are not side loaded more than 10° out of the plane of the attachment unless specified by the manufacturer. Lifting attachments shall be located such that the lifting slings do not contact the equipment, or alternatively a spreader beam certified to NAVFAC P-307 shall be provided. Whenever practical, the lifting attachments shall be located above the center of gravity, and such that the lifting slings do not contact the equipment housings.
9.1.2.4. Each lifting attachment shall be conspicuously marked in a contrasting color “lift here”. Letters shall have a minimum height of 1”. Where multiple lifting attachment points and/or tiedown points exist (i.e., forklifts and aerial platforms), each lifting attachment shall be conspicuously marked or identified.
9.1.2.5. Forklift channels shall be 5”x10” inside dimension the full width of the unit and enclosed on all four sides.
9.2. The equipment shall be marked in a prominent location with the gross weight. Sand hopper tubs, or other containers that may contain material shall be marked with the empty and full weight (or alternatively the empty weight and working load limit). Marking shall be in upper case letters of contrasting colors, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”. Etc.).
9.3. The equipment shall be provided with a lifting sketch/rigging diagram that meets the requirements of Section (11).
9.3.1. The lifting sketch shall detail any specific requirements and/or configurations that must be met prior to lifting (i.e., “engage swing lock,” “tilt mast back fully,” “rotate lifting basket over side,” “utilize 10’ minimum length slings,” and “spreader beam required”).
9.3.2.The lifting sketch shall include the location of the equipment center of gravity (full fuel, hydraulic tanks, etc.), equipment model/manufacturer, and gross weight.
9.3.3. A copy of the lifting sketch shall be provided with the equipment and copies shall be forwarded to the government points of contacts and Code 714 (396-3345/3346).
9.4. If specialized handling gear, other than shackles, standard slings, or chain hoists, is required (i.e., spreader beams and special lift rigs), the contractor shall provide it unless NNSY previously agrees to furnish this gear.
9.5. Permanently affixed isometric rigging diagram shall be placed near the gross weight label and shall include:
9.5.1. Show one (1) unit
9.5.2. Show center of gravity location.
9.5.3. List manufacturer and gross weight.
9.5.4. Locate diagram near one of the “gross weight” markings.
9.5.5. Indicate minimum standard anchor shackle size and minimum sling length.
9.6. Provide 3 paper copies of the isometric rigging diagram.
10. Lifting Sketch Requirements
10.1. The HAZMAT container must be capable of being moved by forklift AND crane.
10.2. Lifting sketches, as a minimum, shall identify the following:
10.2.1. The weight of the load.
10.2.2. The location of the center of gravity
10.2.3. The minimum capacity/length of slings
10.2.4. The minimum capacity of other standard rigging gear
10.2.5. The attachment (lifting) points for the load
10.2.5.1. The attachment points for multiple leg lifts shall be sized such that each attachment point can support half the load’s weight at the anticipated lift angle.
10.2.5.2. The attachment point for single leg lifts shall be sized such that the attachment point can support the entire load’s weight.
10.2.6. Limitations on allowable orientations for any parts making up the lifting assembly
10.2.7. For single leg vertical lifts using twisted rope (wire or synthetic), two parallel ropes each capable of supporting the entire load alone shall be required unless a method is used to prevent unraveling the rope.
10.2.8. A minimum D/d ratio of one shall be required where wire rope slings pass over any object, or in the eyes of wire rope slings. A minimum D/d ratio of two shall be required where synthetic rope slings pass over any object, or in the eyes of synthetic rope slings.
10.2.8.1. "D" represents the diameter of the object the sling passes over.
10.2.8.2. "d" represents the diameter of the sling.
10.2.8.3. Table 14-3 of NAVFAC P-307 lists efficiency factors at various D/d ratios.
10.2.9. Components in each handling assembly shall be sized based on the worst case distribution of loads.
Note: When making a two-, three-, or four-point lift, the handling gear shall be sized so that two legs can support the load without exceeding the safe working load (SWL) at the lift angle expected, unless an equalizing method is used
10.2.10. When nonstandard gear is required (i.e., round stock lifting bars) written instructions shall be provided that ensure:
10.2.10.1. The proper material is being used
10.2.10.2. The item is certified
10.2.10.3. Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e., eccentricity of the bearing points).
10.2.11. Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e., eccentricity of the bearing points).
10.2.12. A load indicating device (LID) and a pre-determined stopping point will be in the rigging configuration; applicable to engineering estimated weights and loads not covered by a technical work document (TWD), unless otherwise approved by C-714.
11. DBIDS:
11.1. Any new contractor, vendor or supplier requesting base access AFTER 31 May 2017 will be required to obtain a DBIDS credential. NCACS credentials will no longer be issued.
11.2. Only DBIDS credentials will be issued to ALL contractors, vendors and suppliers seeking base access
AFTER 14 August 2017.
11.3. Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides a continuous vetting anytime the DBIDS card is scanned at an installation entry point.
If you currently have a Navy Commercial Access Control System (NCACS) card, the following is required to get a DBIDS credential:
11.4. Present your NCACS Card and a completed copy of the SECNAV FORM 5512/1 to the base Visitor
Control Center representative.
11.5. The VCC will pull up your information in the computer, ensuring all information is current and correct.
11.6. Once your information is validated, a temporary DBIDS credential is provided.
11.7. Your temporary credential will have an expiration date, prior to which you will need to obtain your permanent DBIDS credential (~90days).
11.8. For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the Visitor Control Center.
11.9. The representative will enter base access authorization and then you may proceed to work.
If you do NOT have an NCACS Card, the following is required to obtain a DBIDS credential:
11.10. Present a letter or official document from my government sponsoring organization that provides the purpose for your access.
11.11. Present valid identification, such as a passport of Real ID Act- compliant state driver’s license.
11.12. Present a completed copy of the SECNAV 5512/1 form to obtain your background check.
11.13. Upon completion of the background check, the Visitor Control Center representative will complete the
DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential.
11.14. You may now proceed to work.
FOR ADDITIONAL QUESTIONS ABOUT OBTAINING A DBIDS CARD, CONTACT YOUR LOCAL
BASE VISITOR CONTROL CENTER. INFORMATION IS ALSO PROVIDED AT:
www.cnic.navy.mil/om/dbids.html One-Day Passes. Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
12. ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA)
12.1 The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Rental of One (1) HAZMAT Container via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
(1) W, Lease/Rental of Equipment;
(2) X, Lease/Rental of Facilities;
(3) Y, Construction of Structures and Facilities;
(4) D, Automatic Data Processing and Telecommunications, IT and Telecom-
Telecommunications Transmission (D304) and Internet (D322) ONLY;
(5) S, Utilities ONLY;
(6) V, Freight and Shipping ONLY.
12.2 The contractor is required to completely fill in all required data fields using the following web address:
https://www.ecmra.mil.
12.3 Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://www.ecmra.mil.
13. PICKUP/REMOVAL OF RENTAL UNITS:
13.1 Unless otherwise notified by NAVSEA Contracting, Norfolk Naval Shipyard, rental/lease unit(s) shall be picked-up (removed) by Contractor on the morning after expiration of the established contract period of performance.
13.1.1 In the event that this date occurs on a Saturday, Sunday, or a recognized Federal Holiday, the contractor may make the appropriate arrangements to pick-up the equipment on the first working day following the expiration of the contract at no additional cost to the Government.
13.1.2 If any difficulty is experienced in picking-up (removing) unit(s), the Contractor MUST immediately request the Contracting Officer’s direction by contacting William Webb, Code 432, via telephone (757) 396-3108, email to william.a.webb2@navy.mil.
13.1.3 A Contractor’s failure to follow the above instructions regarding pick-up/removal of rental units may relieve the Government of any liability for further charges for the equipment.
(End of Summary of Changes)
File details come from the government source that posted it.