Wally_Schirra_Urgent__Compelling_For_Lead_Based_Paint_Surveys.docx

DOCX document 27 KB Posted

Attached to
LEAD PAINT SURVEY
Solicitation number
N40442-12-T-7259
Issued by

About this file

SOLE SOUCE DOCUMENT

View the file

Other files

File Type Posted
Wally_Schirra_High_Lead_Content_Paint_Testing_SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 28 December 2011

MEMORANDUM FOR SIMPLIFIED ACQUISITIONS (<$100K)

From: Nikolaos M. Kritikos, PPE USNS WALLY SCHIRRA (T-AKE-8) To: Contracting Officer, Military Sealift Fleet Support Command

Subject: JUSTIFICATION FOR URGENT ACQUISITION Reference: (a) Procurement Request No(s): N2319812_______________________________

(b) Federal Acquisition Regulation 6.302-2/13.106

2. URGENCY: This justification is provided to support contracting without full and open competition for subject requirement as authorized by 10 U.S.C. 2304(c) (2) in that the supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the government.

The determination for urgency for subject requirement is based on the following -

Date on which the requirement was first identified: 28 December 2011___________________________

Date on which the requirement was submitted: 28 December 2011______________________________

If the above two dates are more than one week, in difference, explain the delay in submitting the requirement: ___________________________________________________________________________

Date item needs to be onboard or required period of performance (not the date that the contractor provided when you conducted market research, but your actual REQUIRED date: 09 January 2012

Explanation of why delivery by that date is required:

The impact to the mission (i.e., the specific harm) if the materials or services are not received by the stated delivery date; The USNS WALLY SCHIRRA is requesting assistance for procuring the services for Lead Based Paint Surveys.

· NASSCO Shipbuilders have discovered that some of the Areas/Spaces onboard AKE-8 exceeds the Acceptable Lead Level Requirements. The special circumstances and conditions that exist validating the requirement as “urgent”:

USNS WALLY SCHIRRA cannot continue deployment in the Guam AOR, without having ALL the Areas/Spaces inspected for Lead Paint; this is a ship’s safety issue!

· The rationale for the priority assigned: 1 day schedule procurement to be accomplished – required so ship can certify mission support.

Estimated production lead time for the item, i.e., how long will it take the contractor to produce the item once the contract is awarded: Available for Immediately Delivery

Market Research reveals that the following firms were contacted:

Company Name
Person Contacted
Date of Call
Can or Cannot by RDD

AEI Consultants

December 28 2011
Can

Marine Chemist Atlantic, Inc.

December 28 2011
Can

R&S Marine Services.

December 28 2011
Can

3. I hereby certify that the above information is accurate and complete to the best of my knowledge and belief.

PREPARED BY:

Nikolaos M. Kritikos/Principal Port Engineer, USNS WALLY SCHIRRA Name/Title

REVIEWED BY:

Bill Zagrocki N43C LTD

APPROVED BY:

Name/Contracting Officer image1.png