This document is an amendment to a solicitation for drydocking repair services for the Fast Response Cutter USCGC Robert Goldman (WPC 154). The amendment provides answers to industry questions to clarify the solicitation requirements. Key services required include hull plating inspection and repair, tank cleaning and inspection, machinery systems inspection and repair, electrical systems inspection and thermographic testing, bilge and piping cleaning, ventilation system cleaning, deck covering renewal, and interior and exterior preservation and coating services. Required documentation and drawings will be provided by the Coast Guard as requested. Consumable items and specialty coatings must be contractor-furnished unless otherwise noted. The response date remains unchanged by this amendment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2I RFP 24RF001 A0003.pdf | ||
| 2C RFP N4033924RF001 USCG RONALD GOLDMAN.pdf | ||
| 2I RFP 24RF001 A0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4033924ROBGOLD
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N4033924RF001 Amendment 0002
The purpose of this amendment is to provide answ ers to questions from industry for the USCG Ronald Goldman.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Nov-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4033924RF001
X 9B. DATED (SEE ITEM 11)
16-Oct-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Nov-2023
CODE
NAVSUP FLC BAHRAIN CODE 200
FLEET SUPPORT DIVISION PSC 851 BOX 430
FPO AE 09834-0001
N40339 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4033924RF001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
CLARIFICATIONS - USCGC ROBERT GOLDMAN (WPC 154) - N4033924RF001
CLIN
Work Item No.
Work Item Description
Paragraph CLARIFICATIONS
REQUIRED
Government Response
0001 D-001 Hull Plating Inspect
Para 3.3 The new Sealing and locking compound conforming to ASTM D5363-AN0123 or a flexible joint compound conforming to MIL-S-45180, Type II to be Government-furnished property, as it not available locally and it is very difficult to import these Mil-Spec Compounds from Overseas due to strict Bahrain Environmental Laws. Please confirm.
Contractor Furnished
Para 3.5.1 The growth work specified in this paragraph will be covered under a change order or RCC.
Please confirm.
Work described in Para 3.5.1 is not growth work.
Include in bid price.
0002 D-002 Tanks and Voids, Inspect and Preserve
Para 3.2.2 Please advise the content of each tank in gallons to offload after the vessel's arrival at Contractor's facility.
See tank capacities in Principal
Characteristics
0004 D-004 Louver and Damper Assembly, Inspect and Repair
Para 3.2.3 All the new wearing-components (e.g. seals, gaskets, o-rings, filters and fasteners to be Government-furnished property. Please confirm.
Negative, Contractor furnished
0005 D-005 Propulsion Shafting Sysytem, Inspect and Repair
Reference Coast Guard Drawing 154 WPC 161-301, Rev C, Skegs and Stern Tubes Support Structures. Not Received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 204-301, Rev F, Equipment Removal Plan. Not Received.
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 243-201, Rev D, Main Propulsion Shafting A&D. Not Received. Please provide.
Will Provide
0006 D-006 ASW/Firemain System Components, Renew/Overhaul
Para 1.1.1 The new overhaul Kit for the valves to be Government-furnished property, as these are not available locally. Please confirm.
Contractor furnished
Para 1.1.1 Please provide us the contact details of the Valve manufacturers / Suppliers to procure new overhaul kits, if Contractor Furnished property.
See details in Drawing
Para 1.1.2 The new overhaul Kit for the Strainers to be Government-furnished property, as these are not available locally. Please confirm.
Contractor furnished
Para 1.1.2 Please provide us the contact details of the Strainers manufacturers / Suppliers to procure new overhaul kits, if Contractor Furnished property.
See details in Drawing
Reference Coast Guard Drawing 154 WPC 256-301, Rev D, Main and Auxiliary Cooling System Diagram. Not Received. Please provide.
Will Provide
Para 3.2.3.2 The new hardware and software (e.g. packing, O-rings, gaskets, seal rings, non-metallic seats, pins, washers, inserts, etc.) to be Government-furnished property. Please confirm.
Contractor furnished
Para 3.2.3.3 All the new associated fasteners, seals, and other soft parts to be Government-furnished property. Please confirm.
Contractor furnished
Para 3.2.4 All the new gaskets conform to ASTM D1330, seals, and fasteners (nickel-copper) to be Government-furnished property. Please confirm.
Contractor furnished
0007 D-007 Electrical Power Distribution System, Thermographic Inspection (450 VAC And Below)
Reference Coast Guard Drawing 154 WPC 320-301, Rev E, 450V System Deck Plan. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 330-301, Rev G, 120V System Deck Plan. Not received. Please provide.
0008 D-008 Bilge Surface and Piping, Clean and Inspect
Reference Coast Guard Drawing 154 WPC 521-301, Rev C, Firemain System and Magazine Sprinkler Diagram. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 533-201, Rev C, Potable Water System Arrangement. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 541-201, Rev D, Fuel Oil Transfer System Arrangement.
Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 593-201, Rev F, Sewage System Arrangement. Not received.
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 593-202, Rev C, Oily Bilge System Arrangement. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 593-301, Rev C, Sewage System Diagram. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154B WPC 593-302, Rev -, Oily Bilge System Diagram. Not received.
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 601-302, Rev D, General Arrangement. Not received.
Please provide.
Will Provide
Para 3.3 All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
Contractor furnished
0009 D-009 Machinery Ventilation System, Clean
Reference Coast Guard Drawing 154 WPC 513-201, Rev B, Machinery Ventilation Arrangement. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 513-301, Rev C, Machinery Ventilation Diagram. Not received. Please provide.
Will Provide
0010 D-010 HVAC Duct System, Clean
Reference Coast Guard Drawing 154 WPC 512-201, Rev -, HVAC Arrangement. Not received.
Please provide.
Reference Coast Guard Drawing 154 WPC 512-301, Rev B, HVAC System Diagram. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 512-305, Rev -, HVAC Equipment List. Not received.
Please provide.
Will Provide
0011 D-011 HVAC Demister, Renew
Para 2.2 Please provide the Manufacturer Contact address and email details in order to procure the new Demister.
Reference Coast Guard Drawing
154B WPC 512-301
Para 2.2 All the new associated fittings and mounting hardware to be Government-furnished property. Please confirm.
Contractor furnished
Para 3.3 All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead-time of 8-10 weeks to procure from USA.
Please confirm.
Contractor furnished
0012 D-012 Rudder Assemblies, Inspect and Repair
Reference Coast Guard Drawing 154 WPC 204-301, Rev F, Equipment Removal Plan. Not received.
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 562-201, Rev A, Rudder Details.
Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 562-202, Rev C, Rudder Arrangement & Details. Not received. Please provide.
Will Provide
Para 3.2.4 The new Sealing and locking compound conforming to ASTM D5363-AN0123 or a flexible joint compound conforming to MIL-S-45180, Type II to be provided as Government-furnished property, as it not available locally and it is very difficult to import these Mil- Spec Compounds from Overseas due to strict Bahrain Environmental Laws. Please confirm.
Contractor furnished
0013 D-013 Stabilizing Fins, Inspect and Repair
Reference Coast Guard Drawing 154 WPC 556-202, Rev D, Fin Stabilizer Hydraulic System A&D. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 565-301, Rev A, Fin Stabilizer
Control System. Not received.
Reference Coast Guard Drawing 154 WPC 565-302, Rev C, Fin Stabilizer Control System COED. Not received. Please provide.
Will Provide
Para 3.2.2.4 The new rust preventive compound conforming to MIL- PRF-16173, Class II, Grade 3, to be Government-furnished property, as it not available locally and it is very difficult to import these Mil-Spec Compounds from Overseas due to strict Bahrain Environmental Laws. Please confirm.
Contractor furnished
Para 3.2.2.4 The new Sealing and locking compound conforming to ASTM D5363-AN0123 or a flexible joint compound conforming to MIL-S-45180, Type II to be provided as Government-furnished property, as it not available locally and it is very difficult to import these Mil- Spec Compounds from Overseas due to strict Bahrain Environmental Laws. Please confirm.
Contractor furnished
Para 3.2.2.5 The new upper bearings, lower bearings, and all disturbed seals and soft components (e.g.
gaskets, o-rings, etc.) to be Government-furnished property, as these items are normally supplied by OEM.
Please confirm.
Contractor furnished
Para 3.2.4 All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
Contractor furnished
0014 D-014 Bow Thruster Propeller and Tunnel, Inspect and Repair
Reference Coast Guard Drawing 154 WPC 204-301, Rev F, Equipment Removal Plan. Not received.
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 568-201, Rev B, Bow Thruster System A&D. Not received.
Publication Coast Guard Technical Publication (TP) 8096B, SWBS 252, Aug 2018, Bow thruster – Model 60 LK with Operator Panel and Motor Drive – Installation, Service, and Operation Manual. Not Received. Please provide.
Will Provide
Para 3.2.3 All the new 12 ea. ANODE, TEAR DROP 2"H X 3.78"W X
5.5"L 4.4# BOLT ON ZINC
MFG# CM2000Z "MARTYR"
or EQ and fasteners to be Government-furnished property. Please confirm.
Contractor furnished
Para 3.2.4 All the new bearings that mate with the power input shaft and the propeller shaft to be Government-furnished property. Please confirm.
Contractor furnished
Para 3.2.4 All the new soft components (e.g. gaskets, o-rings, etc.) to be Government-furnished property. Please confirm.
Contractor furnished
Para 3.2.4 All the new all gear case oil to be Government-furnished property. Please confirm.
Contractor furnished
Para 3.2.6 All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
Contractor furnished
0015 D-015 Stern Launch Door, Inspect and Preserve
Reference Coast Guard Drawing 154 WPC 169-201, Rev C, Structural Closure Stern Gate. Not received. Please provide.
Will Provide
Para 3.2.5 All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
Contractor furnished
Para 3.2.6 All the new zinc anodes, piece 14 of Coat Guard Drawing 154 WPC 633-301, to be Government-furnished property. Please confirm.
Contractor furnished
Para 3.2.7 All the new soft-parts (e.g. seals, gaskets, bumpers, etc.), and all soft-parts directly associated with the door, to be
Contractor furnished
Government-furnished property. Please confirm.
Para 3.2.8 The new grease conforming to MIL-PRF-24139, to be Government-furnished property. Please confirm.
Contractor furnished
0016 0016 Sewage and Grey Water System, Clean and Inspect
Reference Coast Guard Drawing 154 WPC 506-201, Rev A, Fills Vents, Sounds, and Overflows. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 593-201, Rev F, Sewage System Arrangement. Not received.
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 593-301, Rev C, Sewage System Diagram. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154B WPC 593-201, Rev A, Sewage System Arrangement. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 601-302, Rev D, General Arrangement. Not received.
Please provide.
Will Provide
Para 3.3.1 We will allow to use Rydlyme Acid Chemical Solution for chemically cleaning piping and component interiors. Please confirm.
Use approved cleaning agents or submit CFR to receive approval for alternatives Para 3.3.2 All the new zinc anodes to be
Government-furnished property. Please confirm.
Contractor furnished
Para 3.3.5 All the new soft components (e.g. seals, gaskets, o-rings, etc.)
to be Government-furnished property. Please confirm.
Contractor furnished
0017 D-017 Superstructure, Preserve
Reference Coast Guard Drawing 154 WPC 131-301, Rev D, Scantlings Main Deck. Not received.
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 171-201, Rev D, Mast A&D.
Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 251-301, Rev D, Combustion Air Diagram. Not received.
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 405-201, Rev D, Antenna A&D.
Not received. Please provide.
Reference Coast Guard Drawing 154 WPC 405-202, Rev A, Antenna Arrangement and Installation.
Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 406-301, Rev G, Schedule of Bonding and Grounding. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154B WPC 406-301, Rev C, Schedule of Bonding and Grounding. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 422-301, Rev F, Electrical Navigational Aids. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 601-302, Rev D, General Arrangement. Not received.
Please provide.
Will Provide
Para 3.2 All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
Contractor furnished
TABLE 2 –
COATINGS SYSTEM
REQUIREMENTS
SSDG plenums- Soft patches new seal assemblies (e.g. rubber gasket, RTV, etc.) and all new associated hardware and fasteners to be Government-furnished property. Please confirm.
Contractor furnished
TABLE 2 –
COATINGS SYSTEM
REQUIREMENTS
New MIL-PRF-24176
CEMENT, EPOXY, METAL
REPAIR & HULL
SMOOTHING compound from SFLC STD SPEC 6310, to be Government-furnished property. Please confirm.
Contractor furnished
TABLE 2 –
COATINGS SYSTEM
REQUIREMENTS
MPDE plenums- New seal assemblies, filters, and fasteners in accordance with Coast Guard Drawing 251-301, to be Government-furnished property. Please confirm.
Contractor furnished
TABLE 3 - COLORS
FOR
MISCELLANEOUS
DETAILS
All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
TABLE 4 –
SPECIFICATIONS
FOR
WEATHERPROOFING
AND ISOLATING
PILOT HOUSE
TOP MOUNTED
COMPONENTS
New Ultra Tef-Gel, P/N TG-01 or EQ. to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
New Red (11105) color to be Government-furnished property. Please confirm.
Contractor should be prepared to provide The new Electrical insulation tape (i.e., self vulcanizing or self-fusing tape), Electrical tape and an Electrical coating. (e.g.
3M™ Scotchkote™ Electrical Coating or equivalent) to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Isolation Gasket, Rubber Cloth Inserted, HH-P- 151, Class 4 1/8" THK or EQ to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new 3M Pre-cut Thick Walls Adhesive Lined Heat Shrink (6"), P/N ITCSN-800-6 Covering RF to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new 3M Pre-cut Thick Walls Adhesive Lined Heat Shrink (9"), P/N ITCSN-1100-9 or EQ to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Foam Doughnut MFG
– KVH, Part# 24-0142, NSN 5330-01-617-5561 to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new gasket Mfg-AvDec, Part#BL171050-0, NSN 5999- 01-492-5863 to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Thixoflex Black Mfg- AvDec, Part# TG3212-50, NSN 8030-01-661-4927 to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Plunger Dispenser for thixoflex Mfg AvDec, Part#
UG981108-01, NSN 5120-01-
Contractor should be prepared to provide
494-7678. to be Government-furnished property. Please confirm.
The new Thixoflex black sealing Compound to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new transit parts to be Government-furnished property. Please confirm.
Contractor should be prepared to provide The new Blue Molly or equivalent to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Foam Doughnut MFG
– KVH, Part# 24-0142, NSN 5330-01-617-5561 to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
TABLE 5 –
SPECIFICATIONS
FOR
WEATHERPROOFING
AND ISOLATING 01
DECK
MOUNTED
COMPONENTS
The new Ultra Tef-Gel, P/N TG- 01 or EQ. to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Isolation Gasket, Rubber Cloth Inserted, HH-P- 151, Class 4 1/8" THK or EQ to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new 3M Pre-cut Thick Walls Adhesive Lined Heat Shrink (6"), P/N ITCSN-800-6 Covering RF to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Av-Dec (Aviation Devices & Electronics Components LLC) Thixoflex Black P/N TG3212-50 (50CC Cartridge) or EQ to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Applicator: Av-Dec (Aviation Devices & Electronics Components LLC) Injectable Sealant Applicator P/N UG981108-01 or EQ to be Government-furnished property. Please confirm.
Contractor should
The new Thixoflex black sealing to be Government-furnished property. Please confirm.
Contractor should be prepared to provide The new antenna to be
Government-furnished property. Please confirm.
Government furnished property
Para 4.2 All the new Coast Guard Emblem decals and vinyl adhesive letters and numbers to be Government-furnished property. Please confirm.
Government furnished property
0018 D-018 Freeboard, Preserve
Reference Coast Guard Drawing 154 WPC 131-301, Rev D, Scantlings Main Deck. Not received.
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 171-201, Rev D, Mast A&D.
Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 251-301, Rev D, Combustion Air Diagram. Not received.
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 405-201, Rev D, Antenna A&D.
Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 405-202, Rev A, Antenna Arrangement and Installation.
Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 406-301, Rev G, Schedule of Bonding and Grounding. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154B WPC 406-301, Rev C, Schedule of Bonding and Grounding. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 422-301, Rev F, Electrical Navigational Aids. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 601-302, Rev D, General Arrangement. Not received.
Please provide.
Will Provide
Para 3.2 All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
TABLE 2 –
COATINGS SYSTEM
REQUIREMENTS
All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
Contractor furnished
TABLE 3 - COLORS
FOR
MISCELLANEOUS
DETAILS
All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
Contractor furnished
Para 4.2 All the new Coast Guard Emblem decals and vinyl adhesive letters and numbers to be Government-furnished property. Please confirm.
Government furnished property
Para 4.3 All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
Contractor furnished
0019 D-019 Mast, Preserve Reference Coast Guard Drawing 154 WPC 131-301, Rev D, Scantlings Main Deck. Not received.
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 171-201, Rev D, Mast A&D.
Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 251-301, Rev D, Combustion Air Diagram. Not received.
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 405-201, Rev D, Antenna A&D.
Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 405-202, Rev A, Antenna Arrangement and Installation.
Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 406-301, Rev G, Schedule of Bonding and Grounding. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154B WPC 406-301, Rev C, Schedule of Bonding and Grounding. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 422-301, Rev F, Electrical
Navigational Aids. Not received. Please provide.
Reference Coast Guard Drawing 154 WPC 601-302, Rev D, General Arrangement. Not received.
Please provide.
Will Provide
Para 3.2 All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
Contractor furnished
TABLE 2 –
COATINGS SYSTEM
REQUIREMENTS
All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
Contractor furnished
Para 3.3.1.2.2.1 Ship Force to remove and reinstall all the electronic and electrical item from the mast.
Please confirm.
Contractor should be prepared to remove and reinstall any equipment listed for removal in the specification.
Para 3.3.1.4.1 The new 316 SS 5/8” bandwidth banding straps lined with 5/8” rubber channel to be Government-furnished property. Please confirm.
Contractor furnished
Para 3.3.1.4.2 The new 316 SS (passive material) fasteners, new nylon insert lock nuts on all bolts, non-metallic washers (phenolic) and PTFE thread compound to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
TABLE 6 –
SPECIFICATIONS
FOR
WEATHERPROOFING
AND ISOLATING
MAST
MOUNTED
COMPONENTS
The new Ultra Tef-Gel, P/N TG- 01 or EQ. to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Isolation Gasket, Rubber Cloth Inserted, HH-P- 151, Class 4 1/8" THK or EQ. to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new 3M Pre-cut Thick Walls Adhesive Lined Heat Shrink (9"), P/N ITCSN-1100-9
Contractor should or EQ to be Government-confirm.
The new 3M Pre-cut Thick Walls Adhesive Lined Heat Shrink (6"), P/N ITCSN-800-6 Covering RF to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Av-Dec (Aviation Devices & Electronics Components LLC) Thixoflex Black P/N TG3212-50 (50CC Cartridge) or EQ. to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Applicator: Av-Dec (Aviation Devices & Electronics Components LLC) Injectable Sealant Applicator P/N UG981108-01 or EQ. to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Thixoflex black sealing to be Government-furnished property. Please confirm.
Contractor should be prepared to provide The new Electrical insulation tape (i.e., self vulcanizing or self-fusing tape), Electrical tape and an Electrical coating. (e.g.
3M™ Scotchkote™ Electrical Coating or equivalent) to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Vucanizing tape to be Government-furnished property. Please confirm.
Contractor should be prepared to provide The new Scotchkote™ Electrical
Coating or equivalent to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new conductive gasket Mfg- AvDec, Part#BL171050-0, NSN 5999-01-492-5863 to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Thixoflex Black Mfg- AvDec, Part# TG3212-50, NSN 8030-01-661-4927 to be Government-furnished property. Please confirm.
Contractor should be prepared to provide
The new Plunger Dispenser for thixoflex Mfg AvDec, Part#
UG981108-01, NSN 5120-01-
Contractor should
494-7678 to be Government-confirm.
Para 4.3 All the new Coast Guard Emblem decals and vinyl adhesive letters and numbers to be Government-furnished property. Please confirm.
Government furnished property
0020 0021 Weatherdecks, Preserve
Reference Coast Guard Drawing 154 WPC 131-301, Rev D, Scantlings Main Deck. Not received .
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 171-201, Rev D, Mast A&D.
Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 251-301, Rev D, Combustion Air Diagram. Not received.
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 405-201, Rev D, Antenna A&D.
Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 405-202, Rev A, Antenna Arrangement and Installation.
Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 406-301, Rev G, Schedule of Bonding and Grounding. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154B WPC 406-301, Rev C, Schedule of Bonding and Grounding. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 422-301, Rev F, Electrical Navigational Aids. Not received. Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 601-302, Rev D, General Arrangement. Not received.
Please provide.
Will Provide
Para 3.2 All the new paints, non-skid coatings etc to be Government-furnished property, as the Mil- Spec paints / Coatings are not available locally and have a long lead time of 8-10 weeks to procure from USA. Please confirm.
TABLE 2 –
COATINGS SYSTEM
REQUIREMENTS
All the new paints, non-skid coatings etc to be Government-furnished property, as the Mil- Spec paints / Coatings are not available locally and have a long lead time of 8-10 weeks to procure from USA. Please confirm.
Contractor furnished
TABLE 3 - COLORS
FOR
MISCELLANEOUS
DETAILS
All the new paints, non-skid coatings etc to be Government-furnished property, as the Mil- Spec paints / Coatings are not available locally and have a long lead time of 8-10 weeks to procure from USA. Please confirm.
Contractor furnished
Para 3.4 The new 1 foot of fuel oil vent piping and deck transition sleeve up to the first flange to be Government-furnished property. Please confirm.
Contractor furnished
Para 4.3 All the new Coast Guard Emblem decals and vinyl adhesive letters and numbers to be Government-furnished property. Please confirm.
Government furnished property
0021 D-021 U/W Body, Preserve
Reference Coast Guard Drawing 154 WPC 601-302, Rev D, General Arrangement. Not received.
Please provide.
Will Provide
Reference Coast Guard Drawing 154 WPC 602-305, Rev D, Visual Identification and Draft Marks Plan. Not received. Please provide.
Will Provide
Para 3.2.2.1 Ref MPC F14010.D. Not received. Please provide.
Will Provide
Para 3.2.4 All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
Contractor furnished
Para 3.2.4.2 All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
Contractor furnished
Para 3.2.4.3 All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
0022 D-022 Impressed Current Cathodic Protection (ICCP) and Anti- Fouling System, Inspect and Maintain
Para 3.2.2 Renew Anti-Fouling Anodes - The new O-rings and gland grommets to be Government-furnished property. Please confirm.
Contractor furnished
Para 3.2.2 Propeller Shaft Earthing System Maintenance - The new brush to be Government-furnished property. Please confirm.
Contractor furnished
Para 3.2.2 Rudder Stock and Fin Stabilizer Inspections and Maintenance - The new conductive grease to be Government-furnished property. Please confirm.
Contractor furnished
Para 3.3. The growth work specificed in paragraph 3.3.1 and 3.3.2 will be covered under a change order or RCC. Please confirm.
If required, this work will be covered under a Change Request
Para 3.3.1 The new anti corrosive compound to be Government-furnished property. Please confirm.
Contractor furnished
Para 3.3.2 The new dielectric shield layer fairing compound to be Government-furnished property. Please confirm.
Contractor furnished
0023 D-023 Drydocking Para 1.1 Please advise whether the vessel to be docked onto the Government-furnished steel docking block IAW Coast Guard Drawing 154 WPC 997-004.
Correct
0024 D-024 Temporary Services, Provide
- Cutter
TABLE 1 - SERVICE
SELECTION
Para 3.3.5 - Please advise the required Electrical Power Supply rating (Voltage, Ampere, Cycle etc).
Reference SFLC Standard Spec 8635
Para 3.2.2 Office Space - Please advise the total number of double pedestal desks required.
Four (04)
0027 D-027 Stern Tube Interiors, Preserve
Reference Coast Guard Drawing 154 WPC 243-201, Rev D, Main Propulsion Shafting A&D. Not received. Please provide.
Will Provide
Para 3.2 All the new paints to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 8-10 weeks to procure from USA.
Please confirm.
Para 3.2.2 The new epoxy cement conforming to “MIL-PRF-24176
CEMENT, EPOXY, METAL
REPAIR & HULL
SMOOTHING” to be Government-furnished property, as the Mil-Spec paints are not available locally and have a long lead time of 6-8 weeks to procure from USA.
Please confirm.
Contractor furnished
0028 D-028 Interior Wet Deck Coverings, Renew
Para 1.1 The scope of work is for renewing the deck covering or resealing the existing deck covering. Please confirm.
This work item is for resealing the existing deck
Para 3.3 The new non-skid slip resistant tread stickers to be Government-furnished property. Please confirm.
Contractor furnished
0035 D-00A Laydays We did not received the work item specification for this work item. Please advise.
This item is a D37:F181per day cost of in dry dock extension.