This document is a Statement of Work (SOW) for a federal contract opportunity to replace scoreboards at Lejeune High School and Brewster Middle School located in Camp Lejeune, North Carolina.

The SOW requires the contractor to provide all labor, materials, equipment, and supervision to disconnect and remove the existing baseball, softball, and football scoreboards and install new video scoreboards. The work must be completed within 90 calendar days and is limited to straight time hours Monday through Thursday from 7:00 am to 5:30 pm. Weekend, recess period, and after-hours work may be authorized. The contractor must obtain local and thorough background checks for all personnel working at the school facilities. The contract has a 1-year warranty on installation workmanship, materials, and labor.

The related federal contract opportunity, Solicitation Number N4008524R2684, is limited to M&R MACC Contractors listed on the General Requirements cover page. The Department of the Navy Naval Facilities Engineering Command is the procuring agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DoDEA Americas Mid-Atlantic District-Lejeune (Camp Lejeune Community Schools)

Replace Scoreboards for LeJeune High School

STATEMENT OF WORK

Project Locations: LeJeune High School, 835 Stone Street, NC 28547, Brewster Middle School, 883 Stone St, Camp Lejeune, NC 28547

Scope: The Contractor shall provide all labor, materials, equipment, and supervision required to complete the work contained herein. The contractor is responsible for the purchase, transportation, and storage of all equipment and supplies. Upon receipt at the job site, all materials shall be checked to ensure that no damages occurred during shipping or handling. Existing areas that are damaged by the contractor shall be repaired at the Contractor’s expense. Contractor is responsible for verifying existing conditions and measurements prior to submission of bid.

LeJeune High School has old, degraded scoreboards that require constant repairs and are antiquated and difficult to find parts for. Three scoreboards must be replaced. (1) Baseball, (1) Softball, and (1) Football. LeJeune High School football field is located behind Brewster Middle School. Contractor will:

• Disconnect existing scoreboard and all associated circuit wiring back to source.

• Demolish and remove existing scoreboard. (2) 10’x5’x8" baseball/softball and (1) 24'x8'x8" football scoreboards.

• Cut exiting foundations off below, patch and repair turf as required.

• Install new video scoreboard.

• Install associated power and data connections, route new conduit from video control rack to new scoreboard.

Imprinted Logos on face of baseball and softball scoreboards Aluminum Decorative Truss Arch with lolo 4' Tall x 24' Widen football scoreboard.

Caption In Place of Standard football scoreboard.

Project Schedule & Hours of Work: The Contractor shall submit a milestone project schedule with the proposal indicating overall complete duration and major milestones such as submittals, installation, training, etc. for approval. Performance of work shall last no longer than 90 calendar days. All work is based on straight time hours: Monday through Thursday from 07:00 am to 17:30. All on site work, punchlist items, administrative procedures, and task order closeout shall be completed within 120 days from NTP. Weekend, recess period, and after-hours work will be authorized to accomplish the work within required timeframe. Work should be scheduled such that work does not interfere with school operations. The contractor is required to complete this project, ready for use, within the time period specified in the contract. Contractor shall staff project adequately to accomplish the work within the state timeframe.

Conditions of Work:

1. All areas will be clean and have debris removed at the end of each workday. When public traffic is present, all areas will be kept clean and free of obstruction at all times.

2. All work will be coordinated in advance with the DoDEA Americas Mid-Atlantic District-Lejeune Facilities Specialist or designee.

3. All materials and equipment shall be stored in a place that can be secured, to be provided by the Contractor.

4. A representative from the contractor must sign in at the School Reception Office at the beginning of each workday.

thomas.clark Cross-Out

5. All personal protective equipment is the responsibility of the contractor and shall be worn as required by OSHA regulation. Failure to comply will be grounds for immediate STOP WORK at no additional cost to the Government.

6. All work SHALL comply with OSHA, NFPA, AHERA and Federal regulations as required.

Warranty: Installation workmanship materials and labor shall be warranted for a period of 1 year and repair of all defects shall be at no cost to the government.

Personnel Escort/Security Clearance: All employees proposed to work at these school facilities will be required to pass wants and warrants requirement of the police. This includes employees of any Subcontractors which may be hired. Background checks will be the responsibility of the Contractor and may be obtained through Rapid Gate (local only, if available) or from a company who does background checks as a business, is National Association of Professional Background Screeners (NAPBS) accredited, and is approved by the COR. Two levels of background checks are required. An initial local background check to determine if existing warrants are outstanding and a thorough background check with at least 10 years of history in all locations in which the potential employee has lived. The Contractor will keep records of background checks for all employees. The Contractor shall submit a copy of that Record for each employee to the Contracting Officer or COR before any access will be granted to DoDEA Americas MidAtlantic District-Lejeune school facilities and prior to the Notice to Proceed. Convicted felons will not be allowed to render any services defined in this Contract. The initial background check is to be completed within a maximum of 30 days. Any Contractor employee or sub-Contractor employee who has not had at least the local background check completed will only be allowed to work at DDESS facilities if accompanied by a person with background checks completed and acceptable. In addition, the Contractor shall be responsible for obtaining contractor badges via the MCIEAST/MCBCL Contractor Vetting Office, required for routine access to the installation.

Points of Contact: School District POC is Supervisory Facility Operations Specialist Thomas Clark, thomas.clark@dodea.edu, (910) 451-5361 or Maintenance Mechanic Supervisor ,Thomas Willox, thomas.willox@dodea.edu, (910)451-5361

Softball Field

Baseball Field

Replace Score Boards LeJeune High School -SOW
Replace Scoreboards for LeJeune High School
Tarawa Terrace Elementary School
Replace Score Boards LeJeune High School - MAP
LHS Baseball and Softball Fields
LHS Football Field
Example of desired product for Football Scoreboard

File details come from the government source that posted it. Updated .