N4008518Q2123__SOW.pdf

PDF 168 KB Posted

Attached to
Install Bullet Resistant Laminated Glass and Door
Solicitation number
N4008518Q2123
Issued by

About this file

N4008518Q2123__SOW.pdf

View the file

Other files

File Type Posted
_RFI_Answers.pdf PDF
_Quote_Due_Date.docx DOCX document
_Due_Date_Changes.docx DOCX document
N4008518Q2123__Request_for_Quote_9.21.2017.pdf PDF
N4008518Q2123__wages_3.5.2018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building # (1377) (Provide Bullet Resistant Laminated Glass)

At the

(Naval Station, Newport, RI)

1. General Description

1.1 The Contractor shall provide supervision, labor, material and equipment required to perform all work for the following project: Supply bullet resistant laminated glass at service desk and fiberglass panels at building 1377, and a bullet proof door for additional protection. All work shall be done in a manner to provide a complete, usable and finished end product. See section “11. Work Requirements” for an expanded and detailed scope of work.

1.2 All work shall be performed in accordance with, but not limited to, standard industry practices, applicable local, state and federal codes, laws and regulations, and the Unified Facilities Criteria.

2. Location

The work shall be performed at building 1377 Pass & ID office. This facility built date is 01 July 2005 with a square footage 1,000.

3. Time for Completion

The project Contraction Completion Date (CCD) shall be (120) calendar days from award.

4. Inspection and Approval

All material and workmanship shall be subject to the inspection and approval of the Government.

5. Special Scheduling Requirements/Work Procedures

5.1 Utility outages must be coordinated with the Contracting Officer’s Representative.

5.2 Service shall be performed after working hours. (Standard working hours or as the Contracting Officers

Representative feels fit).

5.3 Existing and adjacent spaces to remain in operation during construction shall be protected from damage, dust, and debris at all times. Damage to any existing spaces, finishes, items, furniture and equipment, as a result of the contractor’s operations, shall be replaced in-kind by the Contractor at no expense to the Government.

5.4 Construction work areas shall have complete and secure separation from adjacent occupied areas.

5.5 The contractor must perform positive identification and locating of existing utilities prior to any concrete chipping, saw cutting, core drilling, or digging of any kind.

5.6 Ensure procedures for scheduling outages are included if appropriate.

6. Passes and Badges

6.1 All Contractor employees shall obtain the required employee and vehicle passes.

6.2 Obtain access to the installation through the Contracting Officer’s Representative.

7. Safety

7.1 All work shall be conducted in a safe manner and shall comply with all requirements of the U.S. Army Corps of

Engineers Safety and Health Requirements Manual EM-385-1-1.

7.2 The Contractor shall submit the Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA) plan for approval by the Contracting Officer. Submit within (10) days from issuance of this Task Order, and obtain approval prior to start of any construction activities.

8. Pre-Performance Conference

Within (5) workdays of issuance of the purchase order, the contractor shall contact the Contracting Officers Representative to schedule a pre-performance conference.

9. Hazardous Materials Disclosure Statements

9.1 Hazardous material must be identified and Material Safety Data must be included for all hazardous material in accordance with EM-385-1-106.B.03e.

9.2 If the contracted work involves the use of hazardous material the contracting officer must receive both a hazardous material inventory report and a daily report including an identification and quantity of the hazardous material used or removed.

9.3 Paint Containing Lead, Cadmium and Chromium (For projects that require disturbance or removal): Work which requires the disturbance or removal of paint that has been determined to contain all or any of the following: lead, cadmium and chromium, shall be performed in accordance with 29 CFR 1926.62, 29 CFR 1926.1126 and 29 CFR 1926.1127.

9.4 Other Hazardous Materials (For projects that require disturbance or removal): Work which requires the disturbance or removal of any of the following: mercury and LLR Components, and PCB’s, shall be performed in accordance with 29 CFR 1910.1000, 10 CFR 20, 40 CFR 273, and 40 CFR 761.

9.5 Contractor shall provide clean certified soil where fill is required, including top soil. Areas to be filled, even though small for this project, shall be cleared, grubbed, and stripped of top soil to remove vegetation, roots, and any other objectionable material. All areas that are disturbed must be capped in accordance with the NAVSTA soil management plan.

10 Submittals

The Contractor shall submit (manufacturers’ product data, shop drawings, testing data, manufacturer warranties, work schedule, equipment checklist, and any additional to suit project) documents required for government approval, prior to the start of any construction activities.

11 Work Requirements.

The contractor shall supply bullet resistant laminated glass, fiberglass panels and a bullet proof door for additional protection at service desk of building 1377.

The following materials shall be used as a minimum requirement.

11.4 Door & Counter Removal

11.5 Preparation

11.6 Parts/Installation

11.7 Door & Counter Removal: Remove door, frame work and all hardware. Dispose of all materials in accordance with Waste Management Plan. Counter frame/structure shall be reinforced to withstand the new bullet resistant frame and teller window.

11.8 Preparation: Frame profile must be free of all foreign materials, including dust, sealers, paint, grease, oils, and solvents, curing and hardening compounds, old adhesive residue, and any other contaminants. Door opening must be plumb, square, level and true before installation.

11.9 Parts/Installation: The following parts described are not a full list but, mentions the key components that must be used for this project. Approximately 10’ X 4’ section that meets UL 752 level 3 rating that is a fixed perimeter bullet-resistant laminated polycarbonate sheet.(See figure 2 location) Sheets shall conform to ASTM D3595. Bullet resistant fiberglass panels with a rating level 3 shall be installed around the perimeter of the counter. The nominal thickness of the panels shall be 7/16”. An optional bullet resistant door shall be installed at the location of figure 1. The door, frame and all assemblies shall be factory fabricated units, designed to be bullet resistant to the threat level 3.

The contractor shall dispose of all existing demolished/removed material off base and will completely clean up job site daily at the end of every work day.

12 Attachments (2 Pictures) Figure 1

Figure 2

The contractor shall dispose of all existing demolished/removed material off base and will completely clean up job site daily at the end of every work day.

File details come from the government source that posted it.