20B0091_Amend 0001.pdf

PDF 198 KB Posted

Attached to
IDIQ PAINTING CONTRACT FOR VARIOUS AREAS
Solicitation number
N4008420B0091
Issued by

View the file

Other files

File Type Posted
Amend 0002.pdf PDF
Attach.2.20B00091.Q&A.pdf PDF
SF1442.20B0091.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N40084-20-B-0091, IDIQ PAINTING CONTRACT FOR VARIOUS AREAS

See Page 2 for Amendment 0001 details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008420B0091

X 9B. DATED (SEE ITEM 11)

05-Jun-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jun-2020

CODE

NAVFAC FAR EAST

CORE EXECUTION TEAM

PSC 473 BOX 13

FPO AP 96349-0013

N40084 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008420B0091

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

The purpose of this amendment is thefollowing:

1. Provide responses to the questions received as shown below:

No. Questions (Should include Specification Section or

Drawing Reference) Answers

1 I have sub-contractors with any certs/licenses that might be required. Do you allow flow through for these requirements?

Yes. Refer to Section 00 21 13 - Instructions to Bidders, Item 1.22

2. The Bid opening date is not changed on 15 July 2020 at 10:00 AM Japan Standard Time.

All other terms and conditions remain unchanged.

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRUCTION TO BIDDERS

1. GENERAL INFORMATION

1.1 BIDS: Bidders shall comply with this "Instructions to Bidders" and "Solicitation, Offer and Award (Construction, Alteration, or Repair)(Standard Form 1442)" in the preparation of bids.

1.2 SYSTEM FOR AWARD MANAGEMENT REGISTRATION: Contractors must be registered in the System for Award Management (SAM) prior to the closing date for receipt of proposals. Contractors may obtain information on registration and annual confirmation requirements via the SAM website accessed via https://www.acquisition.gov or by calling 866-606-8220, or 334-206-7828 for international calls. Quotations from a contractor not registered in the SAM or from a contractor whose SAM registration online Representations and Certifications are not current will not be eligible for award.

1.3 PUBLIC OPENING OF BIDS: Bids will be publicly opened at the time set for opening in the invitation for bids. Their content will be made public for the information of bidders and others interested, who may be present either in person or by representative.

1.4 BIDDER'S QUALIFICATIONS: Before a bid is considered for award, the bidder may be requested by the Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources, and such other information as may be required to evaluate the bidders responsibility.

1.5 BID GUARANTEE AND BONDING REQUIREMENTS: See Section 00 60 00 for Bond Forms. The company name and address of Bid Bond (SF24) and Performance Bond (SF25) should match with the company name and address on the bid form.

In addition to those firms appearing on Treasury Circular 570, Japanese corporations executing bid and performance bonds will also be considered acceptable if authorized to act as sureties under Japanese law. Japanese corporate sureties are requested to register with NAVFAC Far East prior to issuing any bond. The point of contact will be specified in each task order.

1.6 AUTHORIZATION TO PERFORM: In accordance with DFARS 252.225-7042, the Offeror must be duly authorized to operate and to do business in Japan.

1.7 CONTRACTOR LICENSING REQUIREMENTS: Any contract resulting from this solicitation will be awarded and performed in its entirety in the country of Japan. Contractors must be duly authorized to operate and conduct business in Japan and must fully comply with all laws, decrees, labor standards, and regulations of Japan during the performance of the contract. Prior to award of any contract, offerors must be registered to do business and possess a construction license (Kensetsu Gyo Kyoka) issued by the Ministry of Land, Infrastructure and Transport, or prefectural government. Offerors will be required to provide verification on such construction license prior to award of any contract to the contracting officer if such information is not already on file with or available to the contracting officer.

Furthermore, the U.S. Government will not offer “United States Official Contractor” status under Article XIV of the U.S.-Japan Status of Forces Agreement (SOFA) to any offeror awarded a contract under this solicitation; nor wo;;

the U.S. Government designating eligible employee(s) as “Members of the Civilian Component” under Article I(b) of the SOFA."

1.8 BID CURRENCY:

Bids shall be priced only in Japanese Yen. Bids not priced in Japanese Yen will be considered non-responsive and will not be evaluated.

1.9. PUBLIC OPENING OF BIDS:

Bids (with all required supporting documentation) shall be emailed, hand-delivered or mailed so as to arrive at CFAY, Building 1828, prior to the time set for bid opening stated in this Invitation for Bids (IFB). Use of Japan Postal Service is not recommended. Any bids delivered by fax will be unacceptable and not considered for award.

Bids will be publicly opened on WEDNESDAY, 15 JULY 2020 AT 10:00 AM JAPAN STANDARD TIME (JST) AT BUILDING 1828 ON YOKOSUKA NAVAL BASE. Their content will be made public for the information of bidders and others interested, who may be present either in person or by teleconference.

Bidders planning to attend the public opening at CFAY or via telephone are required to email the attendees name and company name to Tomoko.Kanzaki.JA@fe.navy.mil at least five (5) working days prior to the bid opening date.

Conference call phone number for will be provided accordingly to bidders who opt to attend via teleconference.

1.10 BIDS SUBMISSION

a. Bids must be received at the Naval Facilities Engineering Command (NAVFAC) Far East, Acquisition Branch, 1st Bldg#1828 or if hand carried, no later than the date and the time specified in this solicitation or emailed at Tomoko.Kanzaki.JA@fe.navy.mil and Wendie.Narvarte@fe.navy.mil

HAND DELIVERED / MAILED BIDS:

b. Bid that are hand delivered or mailed shall be submitted in a sealed package, in one (1) original and one (1) copy, with one (1) electronic copy. Electronic copy of all bids shall be submitted on a CD and/or a DVD in Adobe Portable Document Format (PDF) unless otherwise specified in the solicitation (See ELINs).

c. Sealed envelopes containing bids shall be marked to show the following;

- Bidder’s name and address

- Solicitation number (N4008420B0091)

- Date and time bids are due

d. Any bidders who do not have gate access for CFAY may send their bid via mail, base authorized courier, or base authorized contractor representative, to be delivered prior to the bid due date. Bids shall be sent to:

Naval Facilities Engineering Command (NAVFAC) Far East Attn: Tomoko Kanzaki, Acquisition Department N40084-20-B-0091

BLDG 1828, 1ST FLOOR, BOX 13

TOMARI-CHO, YOKOSUKA-SHI, KANAGAWA-KEN 238-0001

JAPAN

e. Should there be a discrepancy between the paper copies and the CD/DVD versions, the paper copies shall govern.

BIDS SUBMIITED VIA EMAIL:

f. No email sent shall be larger than 4 MB in size. If the proposing company must send multiple emails, then each email must be labeled with the subject as “Email of x of n”, where x is the unique number and n is the total number of emails. The time stamp of when the email is received by the Contracting Officer shall be official, so please provide enough time when sending to allow for possible server delays.

Facsimile responses will not be considered.

1.11 AMENDMENTS: The Governments may amend this solicitation before the closing date. Any such amendments will be posted to the website https://beta.sam.gov/; hard copies of the amendment will not be mailed. It is the bidder’s responsibility to check the website periodically for any amendments. The contractor must acknowledge any and all amendments issued under this solicitation either by annotating it on the SF1442 or signing each SF30 (amendment) and submitting it with the contractor’s bid.

1.12 PRE-BID INQUIRIES:

All questions must be submitted in writing and received by the Contract Specialist 10 calendar days prior to the solicitation closing date in order to permit adequate time to reply to the inquiry. There is no guarantee that questions submitted after the cut-off date will be answered before the solicitation closes. Submit all questions to Ms. Tomoko Kanzakii via e-mail at tomoko.kanzaki.ja@fe.navy.mil. Use of Question and Answer Form, included in Attachment (2),is required.

1.13 JOINT VENTURE (JV), LIMITED LIABILITY COMPANIES (LLC), LIMITED PARTNERSHIPS

(LTD), AND ETC.:

Joint Ventures and Limited Liability Companies and Limited Partnerships shall submit the following additional documentation regarding their business entities with the bid:

a. A copy of the JV, LLC or LTD agreement.

b. A detailed statement outlining the following in terms of percentages where appropriate:

1) The relationship of the team/partners/parties in terms of business ownership, capitalcontribution, profit distribution or loss sharing.

2) The management approach in terms of who will conduct, direct supervise, and control.

3) The structure and decision-making responsibilities of the partners/parties in terms of who willcontrol the manner and method of performance of work.

4) Identify (by name and title) the personnel having the authority to legally bind the partners/parties (including authority to executed the contract documents and bonds).

c. A list of partners/parties, to include company name, DUNS and CAGE numbers, address, point ofcontact, e-mail address, phone number and facsimile number.

NOTE: A bid may be rejected if the company name identified on the bonds is different from the JV, LLC or LTD name identified on the agreement.

1.14 CUSTOMS AND TAX EXEMPTION: In accordance with the Status of Forces Agreement, the U.S.

Government is entitled to an exemption from Japanese customs duties and Japanese commodity and gasoline taxes.

The Contractor warrants that all taxes and customs duties pertinent to the procurement for which the U.S.

Government is exempt have been excluded from the contract price. The Contractor is required to submit a request in writing to the Contracting Officer for issuance of an import or tax exemption certificate, as appropriate, relieving the Contractor from such customs duties or taxes. Invoices submitted in accordance with the terms and conditions of this contract shall be exclusive of all taxes or duties for which relief is available.

1.15 BIDS AND INVOICES EXCLUSIVE OF EXEMPTED TAXES AND DUTIES: Bids and any subsequent invoices submitted during performance of this contract shall not include the cost of any taxes or duties for which the U.S. government is exempt from paying under SOFA agreement with Japan and for which the contractor may obtain relief from Japanese authorities.

1.16 INCURRED EXPENSES: The Government is not responsible for any costs incurred or associated with preparation and submission of a bid in response to this solicitation.

1.17 NO ALTERNATE OR MULTIPLE BIDS: Neither multiple bids, nor bid variations or options, nor alternate or alternative bids will be considered in the evaluation.

1.18 SCHEDULE OF WORK (IDIQ):

a. Offerors shall enter unit prices and amounts for contract line items (CLINs) and exhibit line items (ELINs) as indicated in the schedules and the accompanying exhibits, SCHEDULE OF PRICE, and SCHEDULE OF INDEFINITE QUANTITY WORK - "A", "B", "C", "D" and "E" of the specification.

b. In the event that there is a difference between a unit price and the grand total amount, the unit price will be held to be the intended bid/offer and the total of the CLINs, SLINs or ELINs will be recomputed accordingly. The CLIN, which includes recomputed contract SLINs or ELINs, will also be recomputed to take into account the change in the contract SLIN or ELIN. If the bidder provides a total amount for a CLIN, SLIN or ELIN but fails to enter the unit price, the total amount divided by the CLIN, SLIN or ELIN will be held to be the intended unit price.

c. In the event that there is a difference between the hard copy and Microsoft Excel format version of the price proposal, the hard copy price proposal will be held to be the intended offer and the total of the CLINs, SLINs or ELINs will be recomputed accordingly.

d. Offerors shall provide pricing in Japanese Yen. The contract will be awarded in a U.S. Dollar ($) amount value for the administrative convenience of the U.S. Government. Payment will be made in a Japanese Yen.

1.19 FAR 14.407-2 APPARENT CLERICAL MISTAKES:

(a) Any clerical mistake, apparent on its face in the bid, may be corrected by the contracting officer before award. The contracting officer first shall obtain from the bidder a verification of the bid intended.

Examples of apparent mistakes are –

(1) Obvious misplacement of a decimal point;

(2) Obviously incorrect discounts (for example, 1 percent 10 days, 2 percent 20 days, 5 percent 30 days);

(3) Obvious reversal of the price f.o.b. destination and price f.o.b. origin; and

(4) Obvious mistake in designation of unit.

(b) Correction of the bid shall be effected by attaching the verification to the original bid and a copy of the verification to the duplicate bid. Correction shall not be made on the face of the bid; however, it shall be reflected in the award document.

(c) Correction of bids submitted by electronic data interchange shall be effected by including in the electronic solicitation file the original bid, the verification request, and the bid verification.

1.20 CANCELLATION OF SOLICITATION:

The Government reserves the right to cancel all invitations and/or reject all bids before award if the Procurement Contracting Officer (PCO) later determines it to be necessary. The procedures in FAR 14.404 shall be followed. In addition, if the PCO determines that an invitation for bids should be canceled and that use of negotiations is in the Government’s best interest, the PCO may negotiate and make award without issuing a new solicitation provided the provisions set forth at FAR 14.404-1(f) are met.

1.21 PRE-AWARD SURVEY:

FAR 9.104 requires prospective contractors to demonstrate, among other things, that they have adequate financial resources to perform the contract or ability to obtain them, capability to comply with the required performance schedule, a satisfactory performance record, and be otherwise eligible to receive an award under applicable laws and regulations. The pre-award survey is not a part of the technical evaluation.

The Government may make a pre-award survey of an offeror to determine whether such offeror is qualified and capable of performing the contract. The pre-award survey will involve examination of the bidder's financial and technical status and understanding of the contract requirements.

The followings are examples of the information that, upon request, the offeror shall be required to provide in writing to the pre-award survey team. Requested information shall be forwarded within three days of request.

Failure to provide requested information, or a determination, after review of the information, of the offeror’s non- responsibility, may result in rejection.

a. Identification of the Contractor's personnel and management to be used on this contract.

b. The Contractor's technical and management plans for performing required services.

c. Description of Contractor's facilities and equipment.

d. Summary of the Contractor's experience in performing work of the type required by this specification.

e. Current financial statements and data.

f. Other work presently under contract.

g. Prior contracts for similar work, and the names and addresses of individuals with the organization issuing the contract who may be contacted for information concerning the Contractor's performance.

h. Contractor Quality Control plan for this contract.

1.22 Teaming Agreement (if applicable): (AMENDMENT 0001)

Offerors intending to utilize capabilities and licenses of subcontractors shall submit a copy of Teaming Agreement and a detailed statement outlining the following where appropriate:

a. The relationship of the team in terms of contract execution to include the structure and decision-making responsibilities and method of performance of work

b. The management approach in terms of who will conduct, direct supervise, and control.

Failing to provide a copy of the teaming agreement will be considered to have not met the requirements.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .