N4008020D0009 S. Potomac Grounds Maintenance Services.pdf
PDF 2 MB Posted
- Solicitation number
- N4008020D0009
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 13 Jan 2020
X
A X B X C
D
EX
X G F
X H rachel.olup@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
26-Mar-2020
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
JAMES H. WAITE
DO-C2 1 168
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
DSA, LLC
311 S 5TH ST STE C
GADSDEN AL 35901-4253
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N4008020D0009
N40080 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Building 182 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
RACHEL OLUP 540-653-3363
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 23 24 - 41
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
42 - 95 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
96 - 97 98 - 106
K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 107 - 111
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 112 M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
892F6 FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
james.h.waite@navy.mil
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: 202-685-3141 (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
$2,741,637.05 EST
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE N68732
DEFENSE FINANCE AND ACCOUNTING SERVICE
ATTN: ACCOUNTS PAYABLE
CODE JAQAAA, ROOM 1441
1240 E. 9TH ST.
CLEVELAND OH 44199-2055
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
113 - 129
PART II - CONTRACT CLAUSES
PUBLIC WORKS DEPARTMENT
SOUTH POTOMAC/FEAD
NSWC DAHLGREN
BLDG. 182
DAHLGREN VA 22448-5000
540-653-7451
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
17 Oct 2019
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N4008019R2506
See Item 7
N4008020D0009
Section SF 30 - BLOCK 14 CONTINUATION PAGE
AMENDMENT 1
The site visit scheduled for Thursday 07 November has been rescheduled for Tuesday 05 November. Please see the attachment posted with this amendment for instructions on gaining base access.
The proposal due date is 03 December 2019 by 2:00 PM, emailed to rachael.arguelles@navy.mil or hand carried to 18329 Thompson Rd, Bldg 182, Dahlgren, VA 22448.
AMENDMENT 2
The following response is provided for the following RFI:
Reference: Solicitation, page 59 of 70, section L.5.1.2.1.3 Technical Factor 3: Past Performance.
Question: Would the past performance of major subcontractors be acceptable to the Government for the past performance requirements of this procurement?
Answer: Per FAR 15.305(a)(2)(iii) regarding the evaluation of Past Performance:
“(iii) The evaluation should take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition.”
The Past Performance of major subcontractors is acceptable to the Government for the Past Performance requirements of this procurement.
AMENDMENT 3
The sign-in sheet from the site visit held on 05 November 2019 is attached to this amendment posting on FBO.
The local area set-aside for this procurement has been removed. This solicitation is open to all 8(a) contractors.
There will be an additional site visit held on 14 November 2019 at 9:00 am. Contractors are required to report to the Kendrick Conference Room of Building 182 at Dahlgren to sign-in prior to the 9:00 start time. The site visit will be all day, beginning with Dahlgren and ending with Indian Head. Interested parties are required to contact Noah Brackbill if they will be attending the site visit and submit the required access paperwork that can be found on FBO.
Access paperwork for this additional site visit must be submitted to Noah Brackbill (noah.brackbill@navy.mil) by 2:00 pm Friday 08 November 2019 to be guaranteed access.
The RFI cutoff date is Monday 18 November by 2:00 pm. Any RFI’s submitted after this time will not be answered.
The proposal due date has been extended to Friday 06 December by 2:00 pm.
AMENDMENT 4
The proposal due date has been extended to 16 December 2019. Responses to RFI’s will be provided no later than 10 calendar days prior to receipt of proposals.
AMENDMENT 5
The following responses are provided for RFI’s received in response to the RFP:
1 - Reference: Solicitation, ATTACHMENT J-1503050-09, Installation Inventories. Under the inventories for Dahlgren and “Herbicide- BG Veg Control” the acreage of 81 is shown.
Question: Part A - Would the Government please provide the type of areas that make up the 81 acres, such as 22.7 acres-Parking Lots, 13.5 acres- gravel areas, etc.?
Part B - Would the Government please provide an inventory of the areas that comprise the 81 acres?
Answer Part A: See attachment J-1503050-05, Site Maps. All acreage is grass.
Answer Part B: See attachment J-1503050-09, Installation inventories. Refer to spec item 3.1.7.
2 – Reference: Solicitation, ATTACHMENT J-1503050-09, Installation Inventories. Under the inventories for Indian Head, Customer NSF-IH, on the last inventory for this customer it references “Pest Control (spray vegetation) with a Unit of Measure as Month and a Qty of 12.
Question: Part A - Would the Government please provide clarification as to what the contractor is to be pricing here (i.e., Pre-emergent, Post-emergent, Fence Lines, Bare Ground, etc.)?
Part B - Would the Government please provide an inventory of the clarified areas to be priced?
Answer Part A: See modified Attachment J – 1503050-09 Answer Part B: See map of facility
3 - Reference: SOW, 0200000 – Management and Administration, spec item 2.7.1.4, Environmental/ Energy Manager Question: Would it be acceptable to the Government for the Environmental/ Energy Manager to be the same person as the Project Manager so long as the qualifications for both positions are met?
Answer: No, duel hatting the Environmental/ Energy Manager and the Project Manager is not acceptable to the government.
4 - Reference: Solicitation, page 57 of 70, section L.4.2.3., items a) and b), and relative to the placement of team members’ corporate information and letters of commitment.
Question: For clarification, would it be acceptable to the Government for offerors to place the team members’ corporate information and letters of commitment as specified in items a) and b) in the Price Proposal only?
Answer: No, place this information in the Technical Proposal.
5 - Reference: Solicitation, pages 26 thru 29, section I, Contract Clauses and page 68 of 70, the Contract Clauses.
Comments: There appear to be some of the contract clauses referenced that do not apply to this solicitation. Some examples are:
52.228-14 - Irrevocable Letter of Credit NOV 2006 52.228-16 - Performance and Payment Bonds--Other Than Construction NOV 2006 252.215-7002 Cost Estimating System Requirements DEC 2012 252.215-7009 Proposal Adequacy Checklist JAN 2014 With the FAR and DFARS references often being the only indication that a requirement applies to the solicitation, there is a risk that offerors would assume that a clause would not apply and be determined to be unresponsive in their proposals.
Question: For clarification, would the Government please review all of the Contract Clauses in Section I as well as those on page 68 and remove those that do not apply to this procurement?
Answer: The FAR Clause Matrix was used to determine the appropriate and necessary clauses required for this solicitation and all are applicable to this procurement.
6 - Reference: Attachment J-1503050-09 “Installations Inventories” and Attachment J-0200000-XX “Recurring Work Exhibit Line Item Numbers.
Comment: The inventories are showing a quantity of 110 waste containers to be serviced made up of 7 different customers.
Question: Is the contractor to price the service of all 110 containers under A004 AC “Other Recurring Services- Waste Containers”, and under customer NDW?
Answer: No.
7 - Reference: Attachment J-1503050-09 “Installations Inventories” and Attachment J-0200000-XX “Recurring Work Exhibit Line Item Numbers.
Comment: For Indian Head on the ELIN Schedule for customers such as A007 NDW, AA, Improved Grounds- Lawn Maintenance COL 3 and AB, Improved Grounds- Field Maintenance COL 3, only Improved Grounds are shown. Within Attachment J-1503050- 09, Inventories there are categories of grounds shown for Improved, Semi- Improved, and Unimproved Grounds. This also exists within customers UEM and NRL, Pomonkey site.
Question: Will the Government please clarify either the inventories or the ELIN Schedule so contractors will know how to properly price?
Answer: See updated Section J attachment J-1503050-09
8 - Reference: Solicitation, page 58, “Questions for Pest Control, Specification 1503020,” questions on spec items 2.2, 3.1.2 and 3.1.3.
Comment: The solicitation does not appear to contain a Performance Work Statement for sub-annex 1503020 Pest Control in which to reference the above spec items 2.2, 3.1.2 and 3.1.3.
Question: Would the Government please clarify whether the questions in the section for sub-annex 1503020 Pest Control apply to this solicitation?
Answer: Refer to attachment J-1503050-03 for related pest control issues.
9 - Reference: The site visit held on Nov 5, 2019, the Government’s statement that the leaf removal is an addition to the scope.
Question: Is there a respective location per site where the leaves can be disposed of, or will the contractor be responsible for removing them from the base?
Answer: Leaf removal is not at addition to the scope, it is already part of the scope. Contractor is responsible for meeting the defined performance standards. The government cannot direct the contractor to perform work a specific way as long as the standards are met.
10 - Ref: Attachment J – 1503050-09 Question: Dahlgren – Per attachment J, NSWC requires 61.3 acres of shore mowing. Can the government confirm under which CLIN this pricing should be included?
Answer: Include this pricing under CLIN 1000-1004 for Dahlgren. This falls under ELIN A005AD listed as an amendment to the ELIN sheet.
11. Ref: Attachment J – 1503050-09 Question: Dahlgren – Per attachment J, NSWC requires 81 acres of vegetation control. However, it is unclear under which CLIN this pricing should be included (A005AA, A005AB, A005AC). Can the government please confirm?
There are also 81.79 acres of Herbicide Control on Asphalt and it is unclear under which CLIN this should be included? Are these two separate areas?
Answer: Include this pricing under CLIN 1000-1004 for Dahlgren. This falls under ELIN A005AE listed as an amendment to the ELIN sheet. The 81.79 acres will fall under ELIN A005AA. Yes they are separate areas.
12. Ref: Attachment J – 1503050-09 Question: Dahlgren - Waste containers – Can the government provide total annual frequency for servicing of waste containers?
Answer: No. Government cannot direct contractor how to perform work. Contractor is required to keep waste containers in a clean and slightly appearance.
13. Ref: Attachment J – 1503050-09 Question: Indian Head – Per attachment J, NDW has multiple levels of service to include improved, semi-improved, and unimproved mowing. However, there are only two CLINs (COL 3 lawn maintenance and COL 3 field maintenance). Can the government clarify under which CLINs should each level of service be priced? What CLIN should Unimproved IR 12, 42, 11, and 21 be included under?
Answer: See modified Attachment J – 1503050-09
14. Ref: Attachment J – 1503050-09 Question: Indian Head – Per attachment J, NSWC IHEODTD has two levels of service to include improved and semi-improved (magazine) mowing. However, there are three CLINs (A010AA - COL 3 lawn maintenance, A010AB – COL3 Field, and A010AC - Magazines). Can the government clarify the acreage for CLIN A011 AA Lawn and CLIN A010AB Field Maintenance?
Answer: See modified Attachment J – 1503050-09
15. Ref: Attachment J – 1502000-08 Question: Indian Head - Attachment J states that all COL 3 lawns must be edged. However, there is no edging data listed under Attachment J – 1503050-09 for Indian Head. Can the government confirm edging is a requirement in these areas? If so, can the government provide total linear footage for each area?
Answer: See modified Attachment J – 1503050-09
16. Ref: Attachment J – 1502000-08 Question: Indian Head - Per attachment J, shrub pruning, hedge trimming, bed maintenance, fertilization and pre-emergent are required in all COL 3 areas. However, there is no data listed under Attachment J – 1503050-09 for Indian Head. Can the government confirm this is a requirement? If so, can the government provide total acreage, linear footage, square footage, and shrub count for each area?
Answer: No requirement at NSFIH
17. Ref: Attachment J – 1502000-08 Question: Can the government confirm that herbicide of asphalt, sidewalks, and fence lines (Vegetation Control 3.1.7) should only occur twice per year?
Answer: Refer to Attachment J-1502000-08.
18. Question: Can the government confirm the COL level requirements pertain to all weed species and seed heads or only the dominant grass species?
Answer: All weed species and seed heads
19. Question: During the site visit, there was mention of leaf removal at Dahlgren. However, there is no associated CLIN for this service. Can the government clarify where there will be leaf removal, the acreage, and how often?
Under which CLIN should this pricing be included?
Answer: Refer to section 3.1.1.4 of 1503050 section C. Include under all ELIN for “Improved Grounds- Lawn Maintenance COL 3”.
20. Ref: Attachment J – 0200000-05 A, J – 0200000-05 B, J – 0200000-05 D Question: Can the government clarify the purpose of the referenced forms and when are they scheduled to be submitted?
Answer: Purpose of referenced forms is to fulfill reporting requirements of NAVFAC Environmental Dept. Forms should be totaled and submitted annually in September before end of fiscal year.
21. Ref: Attachment J – 1502000-08 Question: Can the government confirm that Fertilization and Pre-Emergent of turf areas is required annually for all COL 3 Lawns?
Answer: Refer to table J - 1502000 - 08 (Common Output Level Standards)
22. Ref: Attachment J – 1503050-09 Question: Should CDC – NDW, Improved acreage be included in CLIN A0004AA – NDW Dahlgren?
Answer: Yes
23. Ref: Attachment J – 1503050-09 Question: There are 89 waste containers listed for NDW with associated CLIN A004AC. However, there are no associated CLINs for waste containers for BMD, BUMED, CDC NDW, JWAC, NSWC, or the School? What CLIN should these be included under?
Answer: Include them in the amended ELIN sheet under the appropriate Sub ELIN for each customer.
24. Ref: Attachment J – 1503050-09 Question: There are 39,509.66 linear feet of Herbicide – Fence line, Wall listed under NSWC Dahlgren and 81.79 acres of Herbicide – Concrete, Asphalt also listed under NSWC Dahlgren. Which CLIN should these prices be attributed to? CLIN A005AA or CLINA005AB?
Answer: ELIN A005AA
25. Ref: Attachment J – 1503050-09 Question: What is the frequency of service for the 25 acres of leaf removal at Indian Head NSF NDW? How many times per year should this service be provided?
Answer: Government would like leaf removal covered on IQ portion.
26. Ref: Attachment J – 1503050-09 Question: Is Pest Control required for all 281.50 acres of NSF IH NDW and is this for asphalt, parking lots, sidewalks, etc.? Is crack grass weed control included? Additionally, the U/M is listed as 12 Months, however Vegetation Control in Attachment J-1503050-08 COLS is listed as Semi-Annually. Can the government please clarify?
Answer: See modified Attachment J – 1503050-09
27. Question: Can the government confirm the current contract is bound by a Collective Bargaining Agreement (CBA)? If so, can the government please provide a current copy of the CBA?
Answer: Yes, current contract is bound by a CBA. See amendment for clarification.
28. Ref: ELINS – Non-recurring Question: CLIN AT Mulching has a unit of measure of Each. Should this be SF or SY?
Answer: SY
29. Ref: ELINS – Non-recurring Question: Should the total amount for CLINs BM and BN Service Orders simply total $15,000 each?
Answer: Yes
30. Ref: Solicitation B.1, Page 2 and Section C Question: The contract title references Pumpkin Neck Annex however there is no CLIN for this site. Is this location part of this solicitation?
Answer: Yes under ELIN A005AA, A005AC, A005AE. Refer to maps for additional information.
31. Ref: Incumbent Contract
Question: This solicitation seems very different than the previous statement of work on the incumbent contract with increased mowing frequencies as a result of the COLs. Additionally, weed control and fertilization are not on the incumbent contract as well. Is this accurate?
Answer: Yes
32. Ref: Section L, L5.1.2.1.1 Instructions Question: The instructions ask for details and methodology regarding pest control in turf, ornamental beds, and trees, parade fields, prestige areas, athletic fields, NCAA sports field, flowers, and irrigation whereas none of these items are a requirement of the contract. Can the government please clarify this?
Answer: Refer to attachment J-1503050-09 for inventory clarification.
33. Ref: Section C 3.1.1.5 – Weed Control Question: This section states that pre and post emergent weed control is to be applied however the Common Output Levels only state a pre-emergent should be applied annually. Can the government please clarify this?
Answer: Refer to J-1503050-08 for clarification.
34. Ref: Section C 3.1.2 – Artificial Turf / Playground Surfaces Question: This section states that artificial turf / playground surfaces must be maintained however there is no other data or CLIN that explains the frequency or acreage of this requirement. Can the government provide more information on this requirement?
Answer: Refer to attachment J-1503050-05 and J-1503050-09 for clarification regarding acreage. Government cannot direct contractor on how to perform work. Contractor is required to meet the Specs listed in J-1502000-08.
35. Ref: Section C 3.1.3 – Xeriscape Areas Question: This section states that xeriscaped areas must be maintained however there is no other data or CLIN that explains the frequency or acreage of this requirement. Can the government provide more information on this requirement?
Answer: No xeriscaped areas are currently present on Dahlgren NSA
36. Ref: Indian Head Question: According to the inventories, Plant and Bed Maintenance, Shrub and Hedge Pruning, and Mulching are only required at Dahlgren NSA. Can the government confirm this?
Answer: No requirement at NSF IH.
37. Ref: 3.2.1 Ammunition Storage Areas Question: According to this section, trees should not encroach on roads, buildings, ammunition storage areas, and structures. Will these tree pruning services be ordered under IDIQ non-recurring services? There is no CLIN for this tree pruning service on the recurring line items.
Answer: Reference 3.2.1, NAVSEA OP-5 and NTTP 3-07.2.3. Should be maintained as part of firm fixed contract under Sub ELINs for “Improved Grounds- Lawn Maintenance COL 3”.
38. Ref: Section 3.2.1 Anti-Force Protection Question: According to this section, the contractor shall maintain a 30 foot clear zone on the inside of the fencing and a 20 feet clear zone on the outside of the fencing and trees should not encroach on fence line and structures. The current state of numerous fence lines has mature trees growing within these clear zones. There appears to be tens of thousands of trees that would fall in this clear zone. Is the contractor responsible removing these trees or simply maintaining what is already clear? Will any tree removal or pruning needed be ordered under IDIQ non-recurring services? There is no CLIN for this tree pruning service on the recurring line items.
Answer: Refer to Spec 3.2.2. Maintain what is already clear and accomplish necessary pruning IAW NTTP 3- 07.2.3.
39. Ref: Section 3.2.3 Fire Lanes and Breaks Question: According to this section, the contractor is required to maintain fire lanes and breaks free of trees. Is the contractor responsible for removing current mature trees or simply maintaining what is already clear? Will any tree removal or pruning needed be ordered under IDIQ non-recurring services? There is no CLIN for this tree removal service on the recurring line items.
Answer: Maintain what is already clear
40. Ref: Section 3.2.4 Roads and Right of Ways Question: According to this section, the contractor is required to maintain roads and right of way clearances up to 30 feet of either side of the road and right of way free of trees and vegetation. Is the contractor responsible for removing current mature trees or simply maintaining what is already clear? Will any tree removal or pruning needed be ordered under IDIQ non-recurring services? There is no CLIN for this tree removal service on the recurring line items.
Answer: Maintain what is already clear
41. Ref: Attachment J – 1503050-09 Question: Indian Head – Per attachment J, NSWC IHEODTD has two levels of service to include improved and semi-improved (magazine) mowing. However, there are three CLINs (A010AA - COL 3 lawn maintenance, A010AB – COL3 Field, and A010AC - Magazines). Can the government clarify the acreage for CLIN A010 AA Lawn and CLIN A010AB Field Maintenance?
Answer: See modified attachment J – 1503050-09
42. Ref: Attachment J – 1503050-05 Question: Indian Head – The site map of Naval Support Facility Indian Head specifies improved and semi-improved service levels not COL 3 Lawn and COL 3 Fields. Can the government provide a revised map?
Answer: A revised map will be provided in a subsequent amendment.
43. Ref: Attachment J – 1503050-09 Question: Dahlgren – Per attachment J, Shore Mowing references NTTP 3-07.2.3. The statement of work states vegetation height and trees in and around ATFP areas shall be maintained per NTTP 3-07.2.3 requirements. Can the government provide a total annual frequency for shore mowing?
Answer: Government cannot direct contractor on how to perform work. Contractor is required to meet the Specs listed in J-1502000-08.
44. Question: How is fuel handled on site? Will we need to bring in (and are we permitted to bring in) our own fuel tanks to the site, or are we able to use (potentially purchase) fuel from stations on site? Fuel needed would be gas and diesel.
Answer: Yes, the tanks are supplied by the contractor. Fuel storage is subject to Environmental Dept. inspection and regulations.
45. Question: What are the security requirements for employees on this job site. We are unsure on citizen requirements (Green Card, Naturalized, US Born, no felonies, etc...).
Answer: Refer to attachment J – 0200000 – 5H (Form SECNAV 5512)
46. Question: What are work hour restrictions during the week? What time are we able to use equipment such as mowers, leaf blowers, or other potentially noisy equipment?
Answer: Normal range of base access will be Monday through Friday (0600-1800). Other hours may be approved by Contracting Officer and Security as needed. Restrictions to equipment operation is generally within vicinity of specially announced events, or within restricted areas of base operations where access is prohibited by fencing, and range or activity schedules.
47. Question: Are we able to put a trailer on site in the lay down area?
Answer: Yes
48. Question: Where is the "special event" grass cutting and how often is it usually performed?
Answer: Special Event grass cutting is ordered as IDIQ on an as needed basis, unless the event schedule requirements meet with contractor’s schedule, then the cutting may be accomplished during normal grounds operations.
AMENDMENT 6
An updated ELIN spreadsheet is provided with this amendment. Additionally, Section J has been revised as a result of some RFI’s. Offerors are required to email rachael.arguelles@navy.mil to obtain a copy of Section J, as it is too large to post to FBO.
AMENDMENT 7
The following responses are provided for three (3) additional RFI’s:
1 - Reference: Solicitation, Amendment 0005, Question 27 regarding Collective Bargaining Agreement, the answer which states “Yes, current contract is bound by a CBA. See amendment for clarification.”
Comment: The Collective Bargaining Agreement (CBA) is required in order that contractors can provide proper pricing.
Question: Would the Government please provide a copy of the applicable Collective Bargaining Agreement so that we can properly price the proposal?
Answer: The CBA has been included as an attachment with this amendment.
2 – Reference: Solicitation, general.
Question: Would the Government please clarify whether a Bid Guarantee is required for submission of an offer?
Answer: No bid bond is required. FAR Clause 52.228-1 has been removed.
3 - Reference: Solicitation, Amendment 0006, ELINs Excel file, and Amendment 0005, Question 28 which states “CLIN AT Mulching has a unit of measure of Each. Should this be SF or SY?” with the answer being “SY.”
Question: With the ELINs Excel file still showing “Each” for CLIN AT Mulching in Non-recurring Work for the base and all option periods, would the Government please publish a corrected ELINs Excel file?
Answer: A corrected ELINs Excel file has been provided as an attachment to this amendment.
Please look at the posting on SAM.gov for additional documents – CBA agreement, updated ELINs spreadsheet, and updated Indian Head map (all IR sites correctly shown as NDW).
AMENDMENT 8
The following responses are provided for the following additional RFI’s:
1. There is a CLIN A010 AB for Field Maintenance COL 3 – Indian Head NSWC IHEODTD however there is no acreage for Field Maintenance at Indian Head NSWC IHEODTD on Attachment J-1503050-09 on the Amendment posted Friday. The map is also showing NSWC, Field. Can the acreage be provided?
Answer: Disregard NSWC, Field on the map. Indian Head NSWC IHEODTD falls under Lawn COL3 or
OP5.
2. CLIN A009, NSF only shows Improved Grounds – Field Maintenance COL 3 however the Attachment J- 1503050-09 on the Amendment posted Friday shows Lawn and Field acreage for a total of 26 acres. Can the CLIN structure be corrected?
Answer: Structure updated in ELIN excel spreadsheet
3. CLIN A011, NSF-NRL Pomonkey only shows Improved Grounds – Field Maintenance COL 3 however
Attachment J-1503050-09 on the Amendment posted Friday shows Lawn and Field Acreage. Without these issue corrected, it could lead to errors in the proposal process. With the holidays approaching and these questions still looming, we respectfully request a due date past December 26th.
Answer: Structure updated in ELIN excel spreadsheet. The proposal due date remains December 23, 2019 at 2:00 pm.
AMENDMENT 9
The following response is provided for the RFI received in response to Amendment 7:
1 - Reference: Solicitation, Amendment 0007, CBA wage rates relative to period of performance and pricing.
Comment: The Collective Bargaining Agreement (CBA) includes wage rates both for 2019 and 2020, and the period of performance is to be determined at a future date.
Question: In order to ensure that all offerors use the correct rates, should the offerors use wage rates for 2019 or for 2020?
Answer: Offerors should use wage rates for 2020. The period of performance will not begin until after January 2020.
AMENDMENT 10
The proposal due date has been extended to 30 December 2019 by 2:00 PM EST.
AMENDMENT 11
The proposal due date has been extended to 13 January 2020 at 2:00 pm EST.
The following Wage Determination has been updated:
"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-4330 Daniel W. Simms Division of | Revision No.: 12 Director Wage Determinations| Date Of Last Revision: 09/16/2019 Note: Under Executive Order (EO) 13658 an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1 2015. If this contract is covered by the EO the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination if it is higher) for all hours spent performing on the contract in calendar year 2019. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
State: Virginia
Area: Virginia County of King George
**Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 15.08 01012 - Accounting Clerk II 16.92 01013 - Accounting Clerk III 22.30 01020 - Administrative Assistant 31.41 01035 - Court Reporter 21.84 01041 - Customer Service Representative I 12.08 01042 - Customer Service Representative II 13.58 01043 - Customer Service Representative III 14.82 01051 - Data Entry Operator I 14.38 01052 - Data Entry Operator II 15.69 01060 - Dispatcher Motor Vehicle 19.66 01070 - Document Preparation Clerk 14.42 01090 - Duplicating Machine Operator 14.42 01111 - General Clerk I 14.88 01112 - General Clerk II 16.24 01113 - General Clerk III 18.74 01120 - Housing Referral Assistant 25.29 01141 - Messenger Courier 13.67 01191 - Order Clerk I 15.12 01192 - Order Clerk II 16.50 01261 - Personnel Assistant (Employment) I 19.97 01262 - Personnel Assistant (Employment) II 22.35 01263 - Personnel Assistant (Employment) III 24.92 01270 - Production Control Clerk 24.22 01290 - Rental Clerk 16.91 01300 - Scheduler Maintenance 18.07
01311 - Secretary I 18.07 01312 - Secretary II 20.18 01313 - Secretary III 25.29 01320 - Service Order Dispatcher 18.07 01410 - Supply Technician 31.41 01420 - Survey Worker 20.03 01460 - Switchboard Operator/Receptionist 14.43 01531 - Travel Clerk I 13.29 01532 - Travel Clerk II 14.36 01533 - Travel Clerk III 15.49 01611 - Word Processor I 15.63 01612 - Word Processor II 17.67 01613 - Word Processor III 19.95 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer Fiberglass 25.26 05010 - Automotive Electrician 23.51 05040 - Automotive Glass Installer 22.15 05070 - Automotive Worker 22.15 05110 - Mobile Equipment Servicer 19.04 05130 - Motor Equipment Metal Mechanic 24.78 05160 - Motor Equipment Metal Worker 22.15 05190 - Motor Vehicle Mechanic 24.78 05220 - Motor Vehicle Mechanic Helper 18.49 05250 - Motor Vehicle Upholstery Worker 21.63 05280 - Motor Vehicle Wrecker 22.15 05310 - Painter Automotive 23.51 05340 - Radiator Repair Specialist 22.15 05370 - Tire Repairer 16.42 05400 - Transmission Repair Specialist 24.78 07000 - Food Preparation And Service Occupations 07010 - Baker 15.50 07041 - Cook I 12.55 07042 - Cook II 14.60 07070 - Dishwasher 10.11 07130 - Food Service Worker 10.66 07210 - Meat Cutter 18.08 07260 - Waiter/Waitress 9.70 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 21.96 09040 - Furniture Handler 14.69 09080 - Furniture Refinisher 22.25 09090 - Furniture Refinisher Helper 17.07 09110 - Furniture Repairer Minor 19.73 09130 - Upholsterer 21.96 11000 - General Services And Support Occupations 11030 - Cleaner Vehicles 10.54 11060 - Elevator Operator 11.83 11090 - Gardener 17.52 11122 - Housekeeping Aide 11.83 11150 - Janitor 11.83 11210 - Laborer Grounds Maintenance 13.07 11240 - Maid or Houseman 11.26 11260 - Pruner 11.58 11270 - Tractor Operator 16.04 11330 - Trail Maintenance Worker 13.07
11360 - Window Cleaner 12.85 12000 - Health Occupations 12010 - Ambulance Driver 20.41 12011 - Breath Alcohol Technician 20.27 12012 - Certified Occupational Therapist Assistant 24.95 12015 - Certified Physical Therapist Assistant 23.57 12020 - Dental Assistant 17.18 12025 - Dental Hygienist 44.75 12030 - EKG Technician 27.67 12035 - Electroneurodiagnostic Technologist 27.67 12040 - Emergency Medical Technician 20.41 12071 - Licensed Practical Nurse I 19.07 12072 - Licensed Practical Nurse II 21.35 12073 - Licensed Practical Nurse III 24.13 12100 - Medical Assistant 15.01 12130 - Medical Laboratory Technician 19.84 12160 - Medical Record Clerk 17.42 12190 - Medical Record Technician 22.67 12195 - Medical Transcriptionist 18.77 12210 - Nuclear Medicine Technologist 39.97 12221 - Nursing Assistant I 11.74 12222 - Nursing Assistant II 13.20 12223 - Nursing Assistant III 14.41 12224 - Nursing Assistant IV 16.18 12235 - Optical Dispenser 20.17 12236 - Optical Technician 16.26 12250 - Pharmacy Technician 18.12 12280 - Phlebotomist 16.26 12305 - Radiologic Technologist 31.11 12311 - Registered Nurse I 27.64 12312 - Registered Nurse II 33.44 12313 - Registered Nurse II Specialist 33.44 12314 - Registered Nurse III 40.13 12315 - Registered Nurse III Anesthetist 40.13 12316 - Registered Nurse IV 48.10 12317 - Scheduler (Drug and Alcohol Testing) 22.53 12320 - Substance Abuse Treatment Counselor 18.52 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 19.86 13012 - Exhibits Specialist II 24.61 13013 - Exhibits Specialist III 30.09 13041 - Illustrator I 20.48 13042 - Illustrator II 25.38 13043 - Illustrator III 31.03 13047 - Librarian 33.88 13050 - Library Aide/Clerk 14.21 13054 - Library Information Technology Systems 30.60 Administrator 13058 - Library Technician 19.89 13061 - Media Specialist I 18.73 13062 - Media Specialist II 20.95 13063 - Media Specialist III 23.36 13071 - Photographer I 17.73 13072 - Photographer II 19.84 13073 - Photographer III 24.58
13074 - Photographer IV 30.07 13075 - Photographer V 36.38 13090 - Technical Order Library Clerk 16.12 13110 - Video Teleconference Technician 20.39 14000 - Information Technology Occupations 14041 - Computer Operator I 18.92 14042 - Computer Operator II 21.18 14043 - Computer Operator III 23.60 14044 - Computer Operator IV 26.22 14045 - Computer Operator V 29.05 14071 - Computer Programmer I (see 1) 26.36 14072 - Computer Programmer II (see 1) 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 18.92 14160 - Personal Computer Support Technician 26.22 14170 - System Support Specialist 31.74 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 36.47 15020 - Aircrew Training Devices Instructor (Rated) 44.06 15030 - Air Crew Training Devices Instructor (Pilot) 52.81 15050 - Computer Based Training Specialist / Instructor 36.47 15060 - Educational Technologist 35.31 15070 - Flight Instructor (Pilot) 52.81 15080 - Graphic Artist 26.80 15085 - Maintenance Test Pilot Fixed Jet/Prop 43.66 15086 - Maintenance Test Pilot Rotary Wing 43.66 15088 - Non-Maintenance Test/Co-Pilot 43.66 15090 - Technical Instructor 31.32 15095 - Technical Instructor/Course Developer 38.30 15110 - Test Proctor 25.29 15120 - Tutor 25.29 16000 - Laundry Dry-Cleaning Pressing And Related Occupations 16010 - Assembler 9.88 16030 - Counter Attendant 9.88 16040 - Dry Cleaner 12.94 16070 - Finisher Flatwork Machine 9.88 16090 - Presser Hand 9.88 16110 - Presser Machine Drycleaning 9.88 16130 - Presser Machine Shirts 9.88 16160 - Presser Machine Wearing Apparel Laundry 9.88 16190 - Sewing Machine Operator 13.78 16220 - Tailor 14.66 16250 - Washer Machine 10.88 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 22.78 19040 - Tool And Die Maker 26.42 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 18.02 21030 - Material Coordinator 24.22 21040 - Material Expediter 24.22 21050 - Material Handling Laborer 13.83
21071 - Order Filler 15.09 21080 - Production Line Worker (Food Processing) 18.02 21110 - Shipping Packer 15.09 21130 - Shipping/Receiving Clerk 15.09 21140 - Store Worker I 13.34 21150 - Stock Clerk 18.05 21210 - Tools And Parts Attendant 18.02 21410 - Warehouse Specialist 18.02 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 27.21 23019 - Aircraft Logs and Records Technician 20.16 23021 - Aircraft Mechanic I 25.83 23022 - Aircraft Mechanic II 27.21 23023 - Aircraft Mechanic III 28.53 23040 - Aircraft Mechanic Helper 17.54 23050 - Aircraft Painter 24.73 23060 - Aircraft Servicer 20.16 23070 - Aircraft Survival Flight Equipment Technician 24.73 23080 - Aircraft Worker 21.50 23091 - Aircrew Life Support Equipment (ALSE) Mechanic 21.50 I 23092 - Aircrew Life Support Equipment (ALSE) Mechanic 25.83
II
23110 - Appliance Mechanic 22.78 23120 - Bicycle Repairer 18.20 23125 - Cable Splicer 33.30 23130 - Carpenter Maintenance 21.40 23140 - Carpet Layer 21.50 23160 - Electrician Maintenance 30.78 23181 - Electronics Technician Maintenance I 27.43 23182 - Electronics Technician Maintenance II 29.12 23183 - Electronics Technician Maintenance III 30.68 23260 - Fabric Worker 20.16 23290 - Fire Alarm System Mechanic 23.93 23310 - Fire Extinguisher Repairer 18.89 23311 - Fuel Distribution System Mechanic 23.93 23312 - Fuel Distribution System Operator 19.38 23370 - General Maintenance Worker 21.43 23380 - Ground Support Equipment Mechanic 25.83 23381 - Ground Support Equipment Servicer 20.16 23382 - Ground Support Equipment Worker 21.50 23391 - Gunsmith I 18.89 23392 - Gunsmith II 21.50 23393 - Gunsmith III 23.93 23410 - Heating Ventilation And Air-Conditioning 23.89 Mechanic 23411 - Heating Ventilation And Air Contidioning 25.17 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 24.00 23440 - Heavy Equipment Operator 22.91 23460 - Instrument Mechanic 23.93 23465 - Laboratory/Shelter Mechanic 22.78 23470 - Laborer 14.98 23510 - Locksmith 22.78 23530 - Machinery Maintenance Mechanic 24.05
23550 - Machinist Maintenance 23.93 23580 - Maintenance Trades Helper 18.27 23591 - Metrology Technician I 23.93 23592 - Metrology Technician II 25.09 23593 - Metrology Technician III 26.27 23640 - Millwright 28.19 23710 - Office Appliance Repairer 22.96 23760 - Painter Maintenance 23.02 23790 - Pipefitter Maintenance 25.12 23810 - Plumber Maintenance 23.91 23820 - Pneudraulic Systems Mechanic 23.93 23850 - Rigger 23.93 23870 - Scale Mechanic 21.50 23890 - Sheet-Metal Worker Maintenance 23.93 23910 - Small Engine Mechanic 21.50 23931 - Telecommunications Mechanic I 30.40 23932 - Telecommunications Mechanic II 31.88 23950 - Telephone Lineman 27.41 23960 - Welder Combination Maintenance 22.91 23965 - Well Driller 27.80 23970 - Woodcraft Worker 23.93 23980 - Woodworker 18.89 24000 - Personal Needs Occupations 24550 - Case Manager 16.90 24570 - Child Care Attendant 12.79 24580 - Child Care Center Clerk 17.77 24610 - Chore Aide 10.57 24620 - Family Readiness And Support Services 16.90 Coordinator 24630 - Homemaker 18.43 25000 - Plant And System Operations Occupations 25010 - Boiler Tender 27.30 25040 - Sewage Plant Operator 20.84 25070 - Stationary Engineer 27.30 25190 - Ventilation Equipment Tender 19.49 25210 - Water Treatment Plant Operator 20.84 27000 - Protective Service Occupations 27004 - Alarm Monitor 20.57 27007 - Baggage Inspector 13.94 27008 - Corrections Officer 22.80 27010 - Court Security Officer 24.72 27030 - Detection Dog Handler 20.57 27040 - Detention Officer 22.80 27070 - Firefighter 24.63 27101 - Guard I 13.94 27102 - Guard II 20.57 27131 - Police Officer I 26.52 27132 - Police Officer II 29.67 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 13.59 28042 - Carnival Equipment Repairer 14.63 28043 - Carnival Worker 9.24 28210 - Gate Attendant/Gate Tender 13.01 28310 - Lifeguard 11.59 28350 - Park Attendant (Aide) 14.56
28510 - Recreation Aide/Health Facility Attendant 10.62 28515 - Recreation Specialist 18.04 28630 - Sports Official 11.59 28690 - Swimming Pool Operator 18.21 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer 23.13 29020 - Hatch Tender 23.13 29030 - Line Handler 23.13 29041 - Stevedore I 21.31 29042 - Stevedore II 24.24 30000 - Technical Occupations 30010 - Air Traffic Control Specialist Center (HFO) (see 2) 40.03 30011 - Air Traffic Control Specialist Station (HFO) (see 2) 27.60 30012 - Air Traffic Control Specialist Terminal (HFO) (see 2) 30.40 30021 - Archeological Technician I 20.30 30022 - Archeological Technician II 22.72 30023 - Archeological Technician III 28.13 30030 - Cartographic Technician 28.13 30040 - Civil Engineering Technician 28.13 30051 - Cryogenic Technician I 31.15 30052 - Cryogenic Technician II 34.41 30061 - Drafter/CAD Operator I 20.30 30062 - Drafter/CAD Operator II 22.72 30063 - Drafter/CAD Operator III 25.31 30064 - Drafter/CAD Operator IV 31.15 30081 - Engineering Technician I 22.92 30082 - Engineering Technician II 25.72 30083 - Engineering Technician III 28.79 30084 - Engineering Technician IV 35.64 30085 - Engineering Technician V 43.61 30086 - Engineering Technician VI 52.76 30090 - Environmental Technician 28.13 30095 - Evidence Control Specialist 28.13 30210 - Laboratory Technician 25.31 30221 - Latent Fingerprint Technician I 31.15 30222 - Latent Fingerprint Technician II 34.41 30240 - Mathematical Technician 28.94 30361 - Paralegal/Legal Assistant I 21.36 30362 - Paralegal/Legal Assistant II 26.47 30363 - Paralegal/Legal Assistant III 32.36 30364 - Paralegal/Legal Assistant IV 39.16 30375 - Petroleum Supply Specialist 34.41 30390 - Photo-Optics Technician 28.13 30395 - Radiation Control Technician 34.41 30461 - Technical Writer I 24.12 30462 - Technical Writer II 29.52 30463 - Technical Writer III 35.72 30491 - Unexploded Ordnance (UXO) Technician I 25.44 30492 - Unexploded Ordnance (UXO) Technician II 30.78 30493 - Unexploded Ordnance (UXO) Technician III 36.89 30494 - Unexploded (UXO) Safety Escort 25.44 30495 - Unexploded (UXO) Sweep Personnel 25.44 30501 - Weather Forecaster I 31.15 30502 - Weather Forecaster II 37.89 30620 - Weather Observer Combined Upper Air Or (see 2) 25.31
Surface Programs 30621 - Weather Observer Senior (see 2) 28.13 31000 - Transportation/Mobile Equipment Operation Occupations 31010 - Airplane Pilot 30.78 31020 - Bus Aide 14.80 31030 - Bus Driver 20.85 31043 - Driver Courier 14.91 31260 - Parking and Lot Attendant 12.58 31290 - Shuttle Bus Driver 16.05 31310 - Taxi Driver 15.38 31361 - Truckdriver Light 16.05 31362 - Truckdriver Medium 17.90 31363 - Truckdriver Heavy 21.10 31364 - Truckdriver Tractor-Trailer 21.10 99000 - Miscellaneous Occupations 99020 - Cabin Safety Specialist 15.01 99030 - Cashier 10.03 99050 - Desk Clerk 11.58 99095 - Embalmer 31.73 99130 - Flight Follower 25.44 99251 - Laboratory Animal Caretaker I 12.43 99252 - Laboratory Animal Caretaker II 13.59 99260 - Marketing Analyst 26.67 99310 - Mortician 31.73 99410 - Pest Controller 19.46 99510 - Photofinishing Worker 13.37 99710 - Recycling Laborer 18.50 99711 - Recycling Specialist 22.71 99730 - Refuse Collector 16.40 99810 - Sales Clerk 12.09 99820 - School Crossing Guard 14.73 99830 - Survey Party Chief 21.94 99831 - Surveying Aide 13.63 99832 - Surveying Technician 20.85 99840 - Vending Machine Attendant 19.66 99841 - Vending Machine Repairer 24.11 99842 - Vending Machine Repairer Helper 19.66
Note: Executive Order (EO) 13706 Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1 2017. If this contract is covered by the EO the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness injury or other health-related needs including preventive care; to assist a family member (or person who is like family to the employee) who is ill injured or has other health-related needs including preventive care; or for reasons resulting from or to assist a family member (or person who is like family to the employee) who is the victim of domestic violence sexual assault or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:
HEALTH & WELFARE: Life accident and health insurance plans sick leave pension plans civic and personal leave severance pay and savings and thrift plans.
Minimum employer contributions costing an average of $4.54 per hour computed on the basis of all hours worked by service employees employed on the contract.
HEALTH & WELFARE EO 13706: Minimum employer contributions costing an average of $4.
22 per hour computed on the basis of all hours worked by service employees employed on the covered contracts. *
*This rate is to be used only when compensating employees for performance on an SCA-covered contract also covered by EO 13706 Establishing Paid Sick Leave for Federal Contractors. A contractor may not receive credit toward its SCA obligations for any paid sick leave provided pursuant to EO 13706.
VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor 3 weeks after 5 years and 4 weeks after 15 years. Length of service includes the whole span of continuous service with the present contractor or successor wherever employed and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)
HOLIDAYS: A minimum of ten paid holidays per year: New Year's Day Martin Luther King Jr.'s Birthday Washington's Birthday Memorial Day Independence Day Labor Day Columbus Day Veterans' Day Thanksgiving Day and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4.174)
THE OCCUPATIONS WHICH HAVE NUMBERED FOOTNOTES IN PARENTHESES RECEIVE THE
FOLLOWING:
1) COMPUTER EMPLOYEES: Under the SCA at section 8(b) this wage determination does not apply to any employee who individually qualifies as a bona fide executive administrative or professional employee as defined in 29 C.F.R. Part 541. Because most Computer System Analysts and Computer Programmers who are compensated at a rate not less than $27.63 (or on a salary or fee basis at a rate not less than $455 per week) an hour would likely qualify as exempt computer professionals (29 C.F.R. 541.
400) wage rates may not be listed on this wage determination for all occupations within those job families. In addition because this wage determination may not list a wage rate for some or all occupations within those job families if the survey data indicates that the prevailing wage rate for the occupation equals or exceeds $27.63 per hour conformances may be necessary for certain nonexempt employees. For example if an individual employee is nonexempt but nevertheless performs duties within the scope of one of the Computer Systems Analyst or Computer Programmer occupations for which this wage determination does not specify an SCA wage rate then the wage rate for that employee must be conformed in accordance with the conformance procedures described in the conformance note included on this wage determination.
Additionally because job titles vary widely and change quickly in the computer industry job titles are not determinative of the application of the computer professional exemption. Therefore the exemption applies only to computer employees who satisfy the compensation requirements and whose primary duty consists of:
(1) The application of systems analysis techniques and procedures including consulting with users to determine hardware…