Quality Assurance Surveillance Plan (QASP)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined_Synopsis_Sol_Amendment_1.rtf | RTF text file | |
| 19Q0182_-_CAP.doc | DOC document | |
| 2017-02_VRU.doc | DOC document | |
| RFQ_Form_19Q0182_5VRUs.rtf | RTF text file | |
| QASP_Matrix_Vacuum_Recovery.docx | DOCX document | |
| Combined_Synopsis_Sol_Draft.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3904019Q0182
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
SANDBLAST VACUUM RECOVERY UNITS RENTAL
IN SUPPORT OF US NAVY’S SUBMARINE MAINTENANCE PROGRAM
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract and in subsequent task orders issued thereunder. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
2. AUTHORITY
Authority for issuance of this QASP is provided under FAR 52.212-4(a), Inspection/Acceptance, and FAR 52.212-4(m), Termination for Cause and documentation called for in the contract to be accomplished by the Contracting Office or their duly authorized representative.
3. SCOPE
The QASP is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract or task order. The QASP is not a part of the contract nor is it intended to duplicate the Contractor’s Management Plan.
4. GOVERNMENT RESOURCES
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the Government.
Contracting Officer’s Representative (COR) - An individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.
5. RESPONSIBILITIES
The Government resources shall have responsibilities for the implementation of this QASP as follows:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer’s Representative (COR) - The COR is responsible for assuring proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action. The COR will serve as the Quality Assurance Evaluator (QAE).
6. METHODS OF QUALITY ASSURANCE SURVEILLANCE
The below listed methods of surveillance shall be used in the administration of this QASP.
Customer Feedback – Customer feedback may be obtained from random customer complaints or a variety of Project Team members to include the Project Material Manager (PMM), or outside services personnel (970), directly assigned to the boat. Naval Supply Systems form 1343 will be made available by the COR for the patrons. The COR shall have sole custody of the suggestion box. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and must be forwarded to the COR.
Inspections – Each phase of the services rendered under the contract is subject to Government inspection during the Contractor’s operations and after completion of a task. Inspections may be routine functions performed by the COR. Government inspections may be conducted in an unannounced manner performed by the COR and/or Surveillance/Technical POC. The COR shall maintain a Contract Discrepancy Report (CDR), a copy of which will be provided to the Contractor. Within three days, the Contractor shall reply in writing to CDR(s) by stating reason(s) for unsatisfactory performance(s) and shall identify the corrective action(s) that will be taken to prevent recurrence(s).
7. IDENTIFIED QUALITY ASSURANCE SURVEILLANCE ITEMS
The following PBSC items are identified within the Solicitation and are to be monitored under this QASP.
Vacuum Recovery Units Performance Standard – Quality – All equipment provided shall perform in accordance with requirements identified in Table V of Specification.
Timeliness – All required tasks shall be completed in accordance with project schedules. Delivery of equipment and required technical documentation must be on time per the specifications Responsiveness – Contractor’s ability to respond to performance/quality and scheduling concerns and approach used to resolve problems. Within twenty-four (24) hours of initial notification of the need for repair, the Contractor shall send a technician to the job-site to repair the equipment. The defective unit(s) shall be required within forty-eight (48) hours of initial notification or, if the original defective unit(s) cannot be made operational, replaced within seventy-two (&@) hours of initial notification.
Maximum Error Rate – Quality – 0%
Timeliness – 0% Responsiveness – 0%
8. DOCUMENTATION
The COR will, in addition to providing documentation to the Contracting Officer, maintain a complete Quality Assurance file. All such records will be retained for the life of this contract. Information in the Quality Assurance file will be considered when completing the annual Contractors Performance Assessment Reporting Systems report (CPARS), if applicable.
9. ATTACHMENTS
Attachment A – QASP Matrix