QASP_Matrix_Vacuum_Recovery.docx
DOCX document 17 KB Posted
- Attached to
- Vacuum Recovery Units SSN 781
- Solicitation number
- N3904019Q0182
About this file
QASP Matrix
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined_Synopsis_Sol_Amendment_1.rtf | RTF text file | |
| 19Q0182_-_CAP.doc | DOC document | |
| 2017-02_VRU.doc | DOC document | |
| RFQ_Form_19Q0182_5VRUs.rtf | RTF text file | |
| QASP_Vacuum_Recovery_Units.doc | DOC document | |
| Combined_Synopsis_Sol_Draft.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
SANDBLAST VACUUM RECOVERY UNITS RENTAL
IN SUPPORT OF US NAVY’S SUBMARINE MAINTENANCE PROGRAM
| Deliverable or Service Requirement |
| Measurement/ |
Metric
| Performance Standards |
| Maximum Error Rate |
| Method of Surveillance |
| Procedures to be taken when performance standards are met/not met |
Vacuum Recovery Units
Quality
Timeliness
Responsiveness All equipment provided shall perform in accordance with requirements identified in Table V of Specification.
Delivery of equipment and required technical documentation must be on time per the specifications.
Within twenty-four (24) hours of initial notification of the need for repair, the Contractor shall send a technician to the job-site to repair the equipment. The defective unit(s) shall be repaired within forty-eight (48) hours of initial notification or, if the original defective unit(s) cannot be made operational, replaced within seventy-two (72) hours of initial notification.
0%
0%
0% Customer Feedback
Unannounced inspections by the COR and/or Technical Point of Contact
100% review of all monthly reports
Positive and negative performance by the Contractor will be recorded accordingly in the COR monthly report and included in the contract file for future evaluation of past Performance.
Contracting officer will review all documented performance reports prior to exercising options. Inability of the contractor to meet required standards of PWS and this document may result in options not being exercised.
All positive and negative findings will be reported in the Contractor Performance Appraisal Rating System (CPARS).