Attachment_3_QASP_(VACREC)_Matrix_-_719.rtf
RTF text file 44 KB Posted
- Attached to
- Rental - Vacuum Recovery Units (4)
- Solicitation number
- N39040-16-T-0032
About this file
Attachment 2 QASP
Text of this file
QUALITY ASSURANCE SURVEILLANCE PLAN,(MATRIX)
VACUUM RECOVERY UNIT RENTALS (719) – FY16
Deliverable or Service Requirement Measurement/ Metric Performance Standards Maximum Error Rate Method of Surveillance Procedures to be taken when performance standards are met/not met Temporary Ventilation
(TVENT)
Quality
Timeliness
Responsiveness All equipment provided shall perform in accordance with requirements identified in Table V of Specification.
Delivery of equipment and required technical documentation must be on time per the specifications.
Within twenty-four (24) hours of initial notification of the need for repair, the Contractor shall send a technician to the job-site to repair the equipment. The defective unit(s) shall be repaired within forty-eight (48) hours of initial notification or, if the original defective unit(s) cannot be made operational, replaced within seventy-two (72) hours of initial notification.
0%
Inspections conducted by Contracting Officer’s Representative (COR) and/or Surveillance/Technical
POC
Customer feedback Positive and negative performance by the Contractor will be recorded accordingly in the COR monthly report and included in the contract file for future evaluation of past performance.
Other files
| File | Type | Posted |
|---|---|---|
| 16-T-0032_Combined_Synopsis_Sol.doc | DOC document | |
| 16-T-0032_Combined_Synopsis_Sol.doc | DOC document | |
| 16-T-0032_Attachment_1_-_CAP.doc | DOC document | |
| 16-T-0032_RFQ_Request_for_Quote_Sheet_-_Vac_Recov.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .