Text version

Bldg 465 Replace Heatpump eProject # 1633010 Page 1 of 14

Europe, Africa and Southwest Asia – NAS Sigonella PWD

Building 465 Replace Heatpump eProject # 1633010

NAS Sigonella, Sicily, Italy Date: 25 January 2019

STATEMENT OF WORK

1. GENERAL INTENTION/GENERAL DESCRIPTION:

It is the declared and acknowledged intention and meaning to replace one existing heatpump at Building 465 Base Communication Office by means of a firm fixed price construction contract complete and ready for use. The following paragraphs are intended to provide amplifying or additional information with respect to specific details of the project and are not intended to subordinate any regulatory or statutory requirements contained in the contract. All work shall be performed in accordance with the Corps of Engineers Safety Manual, EM-385-1-1, the most current version, in accordance with Italian Laws, Norms and Regulations regarding Safety at Temporary Work Site (Norme per la Sicurezza nei Cantieri Temporanei e Mobili), and with all NFPA applicable codes (NFPA 101 & NFPA 99).

The contractor shall perform the following work:

2. LOCATION: The work to be performed is located at, NAS II, facility# 465

3. PERIOD OF PERFORMANCE: Ninety (90) calendar days.

4. DESCRIPTION OF WORK:

4.1 Secure power and hydronic lines connected to one AERMEC, damaged and beyond repair, heatpump unit at BLDG 465 Base Communication Office.

4.2 Provide for removal and disposal of the AERMEC heatpump unit.

4.3 Provide one new heatpump unit matching the same characteristics and accessories of the existing unit. See attached mechanical schedule of existing heatpump unit on sheet 465/M-606.

This task involves the replacement of the 2ea main interception valves, minor modifications to the hydronic connections and power supply circuitry. After installation restore connection to existing Direct Digital Control (DDC) system in order to operate as per its original design intent and sequence of operation.

4.4 Perform Test and Balance and commission new heatpump unit to ensure it meets the design performance and is seamlessly integrated into existing DDC system.

Bldg 465 Replace Heatpump eProject # 1633010 Page 2 of 14

5. SPECIAL SCHEDULING:

a. The Contractor shall have all materials approved and available before work begins.

b. The area of work will remain in operation during the entire performance period, and the

Contractor shall conduct his operations so as to cause the least possible interference with the normal operations of the activity. The work under this contract requires special attention to scheduling interruptions of utility systems and Activity operations.

Interruptions of utility services will be permitted only when they will cause no interference with the operations of the activity. All utility cutovers shall be made after the Government's regular working hours or on weekends. Anticipated costs of utility cutovers shall be included in the bid.

c. Outages/Road closures: Permission to interrupt and Station roads or utility service shall be requested in writing a minimum of 21 working days prior to the desired date of interruption. Make utility cutovers and interruptions after normal working hours or on weekends or Government holidays. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and gas shall be subject to the restrictions above.

6. CONTRACT DRAWINGS AND SPECIFICATIONS:

The work shall conform to the specifications and the contract sketches identified in the list below:

LIST OF SKETCHES

LIST OF DRAWINGS DESCRIPTION

1 of 3 Photos of Existing Heatpump 2 of 3 Existing Heatpump Cutsheets 3 of 3 As-Built Drawings

7. SUBMITTALS:

Pre-Construction Submittals

SUBMITTAL/BENCHMARK DURATION BENCHMARK RECEIVED STATUS

1 Quality Control Plan 15 Days After Award

2 Specific Safety Data Sheets 15 Days After Award

3 Construction Schedule 15 Days After Award

Bldg 465 Replace Heatpump eProject # 1633010 Page 3 of 14

4 Safety and Health Plan 15 Days After Award

5 Schedule of Prices 15 Days After Award

6 Operation and Maintenance

Information

15 Days After BOD

7 Licenses, Permits, and

Declarations

15 Days After Award

8 Badge Requests 10 Days After Award

9 Submittal Register 15 Days After Award

10 Performance/Payment Bonds 15 Days After Award

11 Environmental Protection Plan 15 Days After Award

12 Certificates of Insurance 15 Days After Award

13 DD1354 (if applicable) 45 Days Prior to BOD

Note:

Quality Control Plan - Attached Contractor QC Plan Assessment Checklist must be filled out and attached with Quality Control Plan Accident Prevention Plan - Attached Accident Prevention Plan NAVFAC Reviewer Checklist must be filled out and attached with Accident Prevention Plan

Construction Submittals The contractor may submit material and product cut-sheets, certifications, warranty info, etc.

from the intended manufacturer with the specification section in which submittal of that material or product is required during design submittals.

Material submitted for approval shall be accompanied by complete information concerning the material, articles, and/or design proposed for use in sufficient detail to show compliance with the intent of the contract prior to incorporation into the work, Approval thereof will not be construed as relieving the contractor of compliance with the specification even if such approval is made in writing, unless the attention of the Contracting Office is called to the non-complying features by letter accompanying the submitted matter.

Partial submittals of less than the whole of any system made up of interdependent components will not be considered. Approval of drawings, cuts, and samples by the Contracting Officer shall not be construed as a complete check or approval of the detailed dimensions, weights, gauges, and similar details of the proposed articles. The conformance of such details with the contract requirement, together with the necessary coordination of dimensions and details with the contract requirement, together with the necessary coordination of dimensions and details between the various elements of the work and between the various subcontractors and suppliers shall be solely the responsibility of the contractor, approval of submitted matter notwithstanding.

Bldg 465 Replace Heatpump eProject # 1633010 Page 4 of 14

- The Contractor shall submit at least one original manufacturer literature with each submittal, including an English translation.

1. Heatpump Cutsheet

8. APPROVAL OF SAMPLES, CUTS AND DRAWINGS: For this project, all submittals of an administrative nature shall be submitted to the FEAD Office. Technical submittals shall be addressed via the Contracting Officer to the Public Works Department to the attention of FEAD

9. TESTING:

The Contractor shall perform:

1. Test and Balance

2. Commission DDC System

10. TRAINING: N/A

11. NOTES: N/A

Bldg 465 Replace Heatpump eProject # 1633010 Page 5 of 14

CONTRACTOR QUALITY CONTROL (QC) PROGRAM & PLAN

ASSESSMENT CHECKLIST

ROICC Office: Date:

Contract No.:

Project Title:

Contractor:

Superintendent: Individual Responsible for Jobsite Safety:

QC Manager: Alternate QC Manager:

Note: Items with the word PLAN and in bold are required in the QC Plan. This checklist serves two functions. For the ROICC office, to aid in reviewing a Contractor’s QC Plan, identifies what is contractually required by specification and checks completeness of your QC specification; can also be used for constructibility reviews. For the CAV Team, as a tool for doing project reviews to check a Contractor’s QC Program and Plan.

Item No.

ITEM Yes No N/A Comments

ROICC CAV

Quality Control Specification Section (01450N/01451N/01455N):

1. PLAN. Was the QC Plan submitted in accordance with QC

Specification?

a.

In a three-ring binder b.

Includes a table of contents c.

Major sections identified with tabs d.

Pages numbered sequentially

QC Organization:

2. PLAN. Is there a chart showing the Contractor’s

QC organization structure?

3. PLAN. Does the chart show the relationship of the QC organization to other elements of the Prime Contractor’s company? The chart needs to show the relationship of the QC Manager to company officer(s), to the QC staff, to outside organizations, to the project superintendent.

4. PLAN. Does the chart show the relationship of the QC organization to subcontractors, suppliers, outside organizations?

5. Is the QC Manager responsible for safety, i.e., designated as the safety competent person?

NOTE: The QC Manager is not to be designated as the safety competent person.

Names and Qualifications:

6. PLAN. Contains the names and qualifications for each person in the QC organization, in resume format?

7. PLAN. Does the QC Manager have a current CQM for Contractors training certificate?

8. PLAN. Does the Alternate QC Manager have a current CQM for Contractors training certificate?

Bldg 465 Replace Heatpump eProject # 1633010 Page 6 of 14

9. PLAN. Are the current CQM for Contractor training certificates in the QC Plan?

10. PLAN. Do the qualifications and past experiences of the following QC staff meet the Contract specification requirements:

QC Manager

Alternate QC Manager

QC Specialist(s) d.

Submittal Reviewer(s) e.

Registered Fire Protection Engineer

Duties, Responsibility and Authority of QC Personnel:

11. PLAN. Are the duties, area of responsibilities and authority of each person in the QC organization stated in detail in the QC Plan, in particular the QC Manager and the Alternate QC Manager?

12. Per Specification, is the QC Manager allowed to be the project superintendent?

13. Does the QC Manager understand the responsibility for managing and coordinating the Three Phases of Control and documentation performed by any QC specialists, testing laboratory personnel, and any other inspection and testing personnel required by this Contract?

Outside Organizations:

14. PLAN. Is there a listing of outside organizations, such as architectural and consulting engineering firms, that will be used by the Prime Contractor?

15. PLAN. Does this listing contain a description of the work and services to be performed?

Appointment Letters:

16. PLAN. Are there appointment letters, signed by an officer of the firm, appointing the QC Manager and the Alternate QC Manager and include the following:

Outlining their duties, responsibilities and authority for implementing and managing the QC Program?

Responsibility to manage and implement the Three Phases of Control?

The authority to stop any work not complying with the Contract, and the removal and replacement of any defective work?

17. PLAN. Are there letters of direction to the Assistant QC Manager and all QC specialists outlining their duties, authorities, and responsibilities?

Submittal Procedures and Initial Submittal Register:

18. PLAN. Are there procedures for reviewing, Bldg 465 Replace Heatpump eProject # 1633010 Page 7 of 14 approving, and managing submittals?

19. PLAN. Is there a list of name(s) of people in the QC organization authorized to review and certify submittals?

20. PLAN. Is the initial Submittal Register as specified included in the QC Plan?

Testing Laboratory Information:

21. PLAN. Is there a list of construction material testing laboratories to be used for this Contract?

22. PLAN. Is there a description of the service(s) these testing laboratories will provide?

23. PLAN. Is the Contractor using accredited testing laboratories and are there current copies of the Certificate of Accreditation and Scope of Accreditation for the testing laboratories listed?

24. PLAN. Do the testing laboratory’s scope of accreditation include the appropriate ASTM standards listed in the technical specification sections?

Testing Plan and Log:

25. PLAN. Is there a Testing Plan and Log that includes the tests required, referenced by the specification paragraph number requiring the test, the frequency, and the person responsible for each test.

Procedures to Complete Rework Items:

26. PLAN. Are there procedures to identify, record, track, and complete rework items?

Document Procedures:

27. PLAN. Are there procedures for documentation, e.g. daily reports, inspection and testing, including copies of all forms?

List of Definable Features:

28. PLAN. Is there a list of DFOWs in the QC Plan? A

Definable Feature of Work (DFOW) is a task that is separate and distinct from other tasks and has control requirements and work crews unique to that task.

29. PLAN. As a minimum, is the list of DFOWs cross referenced to the Contractor’s contract schedule and the specification sections?

30. PLAN. Does the list include, but not limited to, all critical path activities?

31. PLAN. Does this list include all activities which require QC specialists or specialty inspection personnel?

32. PLAN. (DB) Does each design development stage and submittal package have separate DFOWs?

Procedures for Performing the Three Phases of Control:

Bldg 465 Replace Heatpump eProject # 1633010 Page 8 of 14

33. PLAN. Does the Plan contain procedures to use to ensure the three phases of control are used to manage the quality on this Contract?

Personnel Matrix:

34. Does the Specification require the QC Plan to have a

Personnel Matrix?

35. PLAN. If required, does the matrix show for each specification section:

Who will review and approve submittals?

Who will perform and document the three phases of control?

Who will perform and document the testing?

Procedures for Completion Inspection:

36. Does the Specification require the QC Plan to have procedures for completion inspections?

37. PLAN. If required, does the procedure identify the responsible party for punch out inspection, pre-final inspection, and final acceptance inspection?

Training Procedures and Training Log:

38. Does the Specification require the QC Plan to have training procedures?

39. PLAN. If required, are there procedures for coordinating and documenting the training of personnel as required by the Contract?

40. PLAN. If required, has a sample record of training been included in the QC Plan which reports what systems, who provides the training, when and where the training is to be performed and who attended?

Bldg 465 Replace Heatpump eProject # 1633010 Page 9 of 14

ACCIDENT PREVENTION PLAN NAVFAC REVIEWER CHECKLIST

CONTRACTOR: DATE:

CONTRACT: SIGNATURE:

A qualified reviewer shall check to assure submitted coies of the following items applicable from EM 385-1-1 Appendix A are included in the APP

YES NO N/A

REMARKS

1. SIGNATURE SHEET: Plan Preparer, Approval, Concurrence

2. BACKGROUDN INFO: Contractor, Contract #, Project Name, Brief Project Description, Contractor Accident Experience (EMR, OSHA) Corp. Trend Analysis, list of activities requiring

AHA.

3. STATEMENT OF SAFETY & HEALTH POLICY

4. RESPONSIBILITIES & LINES OF AUTHORITY:

Identification of personnel responsible for safety (Corp. & Project Level)

5. SUBCONTRACTOR & SUPPLIERS: Identification of Subs and Suppliers; means for controlling & controlling; safety responsibilities

6. TRAINING: List subjects in safety indoctrination; mandatory training & certification, emergency response, outline requirements for supv and employee safety meetings

7. SAFETY & HEALTH INSPECTIONS: Identify who will conduct inspections, when & how it will be conducted & recorded, deficiency tracking system and follow-up procedures.

Any external inspections/certifications (e.g. Coast Guard, etc.)

8. SAFETY & HEALTH EXPECTATIONS, INCENTIVE

PROGRAMS AND COMPLIANCE: Company’s written safety program goals, objectives, and accident experience goals;

description of company’s safety incentive program;

policy/procedures for non-compliance with safety requirements;

written company procedures for holding mgr./supvs accountable for safety

9. ACCIDENT REPORTING: Identify person who completes the following: how and when; exposure data (m/hrs worked);

accident investigations, reports a7 logs; immediate notification of major accidents

10. MEDICAL SUPPORT: Outline on-site medical support and off-site medical arrangements

11. PERSONAL PROTECTIVE EQUIPMENT: Outline procedures (who, when, how) for conducting hazard assessments & written certifications for use of personal protective equipment

12. PLANS (PROGRAMS, PROCEDURES) REQUIRED BY THE

SAFETY MANUAL:

A. Hazard Communication B. Emergency Response Plans C. Layout Plans D. Respiratory Protection Plan E. Health hazard Control Program F. Lead/Asbestos Abatement Plan G. Abrasive Blasting H. Confined Space I. Hazardous Energy Control plan J. Critical Lift Procedures K. Contingency Plan For Severe Weather L. Access/haul Road Plan M. Demolition Plan (Engineering and Asbestos Surveys) N. Compressed Air Plan O. Formwork and Shoring Erection and Removal Plans P. Lift Slab Plans Q. SHP/SSHP (for HTRW work) R. Driving Plan S. Alcohol Drug Abuse Prevention Plan T. Fall Protection Plan

Bldg 465 Replace Heatpump eProject # 1633010 Page 10 of 14

13. Information on how the contractor will meet the requirements of the major sections of EM 385-1-1 in the accident prevention plan.

Particular attention shall be paid to:

A. Excavations B. Scaffolding C. Medical/First Aid Requirements D. Sanitation

E. PPE

F. Fire Prevention G. Machinery and Mechanized Equipment H. Electrical Safety I. Chemical, physical agent and biological occupational exposure prevention requirements

J. Detailed site specific hazards and controls shall be provided in the activity hazard analysis for each phase of the operation

K. A list of the anticipated AHAs should be submitted with the

APP

14. Plans for maintaining job cleanup and safe access

15. Public safety requirements (e.g. fencing, signs)

LANT Form 385-APP

Drawing 1 of 3 Photos of Existing Heatpump

Photo 1: Existing Heatpump (HP-2)

Photo 2: Existing Mechanical Yard

Drawing 2 of 3 Existing Heatpump Cutsheets

SCatanzaro Text Box

HEAT PUMP MULTIPURPOSE

Line

Rectangle

Magellano - Aermec S.p.A. 1

Model: NRP1250A2°°°P2R2

Description: SEZIONE EDIFICIO BDLG 465

Cooling Capacity kW 312,9

Input power kW 114,2

Input current A 211

E.E.R. W/W 2,74

Height above sea level m 0

Dry bulb air inlet temperature °C 37,2

Inlet water temperature °C 12,0

Temperature difference °C 5,0

Outlet water temperature °C 7,0

Ethylene glycol % 0

Water flow rate l/s 14,8381

Available pressure kPa 77

Fouling factor (m² K)/W 0,00005

Heating - System side Capacity kW 258,3

Input power kW 124,1

Input current A 217

C.O.P. W/W 2,08

Dry bulb ambient air temperature °C 3,0

Inlet water temperature °C 45,0

Temperature difference °C 5,0

Outlet water temperature °C 50,0

Ethylene glycol % 0

Water flow rate l/s 12,6256

Available pressure kPa 138

Heating (DHW side) Capacity kW 269,1

Input power kW 112,8

Input current A 198

C.O.P. W/W 2,39

Dry bulb ambient air temperature °C 3,0

Inlet water temperature °C 40,0

Temperature difference °C 5,0

Magellano - Aermec S.p.A. 2

Outlet water temperature °C 45,0

Ethylene glycol % 0

Water flow rate l/s 13,1372

Available pressure kPa 148

Fouling factor (m² K)/W 0,00005

Cooling + Heating (DHW side) Cooling capacity kW 340,8

Heating capacity kW 434,0

Input power kW 99,8

T.E.R. W/W 7,76

Users circuit (Cooling)

Outlet water temperature °C 7,0

Temperature difference °C 5,0

Ethylene glycol % 0

Water flow rate l/s 14,8381

Available pressure kPa 77

Users circuit (Heating)

Outlet water temperature °C 45,0

Temperature difference °C 7,9

Ethylene glycol % 0

Water flow rate l/s 13,4203

Available pressure kPa 153

Fouling factor (m² K)/W 0,00005

Data declared according to EN 14511:2013

Magellano - Aermec S.p.A. 3

Magellano - Aermec S.p.A. 4

Performances in average climatic conditions Pdesignh 55 °C 323,00

SCOP 55 °C 3,40

ƞs 55 °C 133,00

Electric data

Power supply 400V/3/50Hz with thermal-magnetic cut-outs

Magellano - Aermec S.p.A. 5

Multipurpose units for 2-pipe systems

NRP RANGE

Range The multipurpose 2-pipe units have been made to meet the needs of a two pipe air-conditioning system and DHW throughout the year.

This occurs thanks to the two braze-welded plate heat exchangers; one is entirely dedicated to the production of cold/hot water for the system depending on the climatic season, while the other is responsible for producing DHW.

· PRODUCTION OF CHILLED WATER ONLY: the multipurpose unit acts as a classical chiller: cool water to the system, and condensation heat disposal outside, through finned coils.

· PRODUCTION OF HOT WATER ONLY: the multipurpose unit acts as a heat pump. Exploiting the heat of outside air through the finned coil (evaporator), it raises the temperature of the water for the system through a plate heat exchanger (condenser).

· PRODUCTION OF DOMESTIC HOT WATER ONLY: the multipurpose unit acts as a heat pump.

Exploiting the heat of outside air through the finned coil (evaporator), it raises the temperature of DHW through a plate heat exchanger (condenser).

· COMBINED PRODUCTION: if the utility requires at the same time DHW and cold water, the unit acts as a water heating unit, controlling condensation and evaporation on two separate plate heat exchangers associated to the circulation of cold and hot water in the system for DHW production. The transition from one configuration to another takes place automatically (managed by an on-board microprocessor) trying to optimise the spent energy depending on the utility demand.

Size Cooling capacity from 43 to 477 kW.

Heating capacity from 46 to 544 kW.

Cooling circuit Two independent cooling circuits allowing the production of hot and chilled water simultaneously or not simultaneously.

Operational fields

· PRODUCTION OF CHILLED WATER ONLY: chilled water temperature producible from 4 °C to 18 °C, with outdoor air from -10 °C to 46 °C.

· PRODUCTION OF HOT WATER ONLY: hot water temperature producible from 25 °C to 55 °C, with outdoor air from -15 °C to 42 °C.

· COMBINED PRODUCTION: hot water temperature from 30 °C to 55 °C, and chilled water producible from 4 °C to 18 °C.

Refrigerant NRP range chillers use HFC R410A near-azeotropic mixture as a refrigerant; it is characterised by nil ODP (Ozone Depletion Potential), and classified within the safety group A1 according to the ASHRAE 34-1997 Standard.

Version High efficiency version. The unit uses increased finned core coils with a wide exchange surface.

Supporting frame Made of hot galvanised sheet steel with suitable thickness, and painted with polyester powders able to withstand weathering over time. The supporting structure is made so as to ensure maximum accessibility for service and/or maintenance operations.

Composition The unit consists of a frame with a single module.

Number of compressors 4 scroll compressors and 2 circuits (each circuit is equipped with two compressors).

Description of the compressors The scroll-type hermetic compressors mounted on NRPs are optimised to work with R410A refrigerant and feature high efficiency and low power consumption. They are provided as standard with a sump anti-freeze electrical resistance. This is powered automatically at each stop to keep the unit under tension. They are driven by 2-pole electric motors with internal circuit breaker protection, chilled by intake gas. They are assembled on rubber shock absorbers placed at the base. To minimize noise, the compressors are enclosed in a sound proof compartment.

Thermostatic valve Standard mechanical thermostatic valve with outdoor equaliser placed at the exit of the evaporator, and bulb sensitive to the intake temperature. Depending on the heat load, it modulates the gas flow, while maintaining the correct degree of superheat of the intake gas to the compressor. This makes it possible to work with a minimum temperature of the produced water at 4 °C.

Magellano - Aermec S.p.A. 6

Plate heat exchanger Plate type, high efficiency, dry expansion water-refrigerant exchanger, made of braze welded AISI 316 stainless steel.

Externally isolated with closed cell material to prevent the formation of condensation and reduce heat loss. An anti-freeze electrical resistance to protect the exchanger when the unit is not operating is fitted as standard.

Source side heat exchanger (coils) Air-refrigerant exchangers, made up of fin coils with copper pipes and hydrophilic aluminium louvered fins, blocked by pipes mechanical expansion. Source side exchangers can operate as condensers or evaporators or be excluded from the circuit (depending on the operation mode of the multipurpose unit).

Description of the cooling circuit Made of copper pipes with welded joints in silver alloy including the following components in addition to the compressors and exchangers:

· thermostatic valve modulating the gas flow depending on the refrigerant load;

· mechanical dehydrator filter made of ceramics and hygroscopic material, capable of retaining impurities and any traces of humidity in the cooling circuit;

· liquid indicator to check the presence of humidity in the cooling circuit;

· solenoid valve on the liquid line closing when the compressor switches off, blocking the refrigerant gas flow to the evaporator;

· cooling cycle reversing valve that reverses the refrigerant flow when operation modes change during defrosting cycles;

· one-way valves to direct the refrigerant in the correct flow direction;

· accumulation of the liquid to retain the refrigerant gas in its liquid state, whenever the machine has a surplus at that particular point of operation;

· compressor intake liquid separator: used to prevent the flow of liquid into the compressor inlet.

Ventilation Unit Standard fan unit consisting of helical fans (with an IP 54 degree of protection). The rotors are balanced statically and dynamically, driven directly by 6-pole electric motors. Electrically protected by incorporated magnet circuit breakers, and mechanically with accident-prevention protection nets fixed on the upper part of the timber framework.

Number of fans The ventilation unit for the disposal of the heat produced by the condensers is composed of 6 fans with rotor of 800 mm.

Electric Control Board Contains the power section and the controls and safety devices management unit. It is in compliance with the LVD 2006/95/EC Directive, and the EMC 2004/108/EC, regarding electromagnetic compatibility. Moreover, all cables are numbered allowing quick recognition of all electrical components.

It is always equipped with a door-lock isolating switch: the electric control board can be accessed disconnecting power supply and acting on the opening lever of the control board. This lever can be locked using one or more padlocks during maintenance work to prevent an unwanted power-up of the unit. Inside the control board is a control keyboard allowing complete control of the unit.

Power supply Power supply 400V/3N/50Hz with magnetic circuit breakers.

Safety and protection devices The chiller is always provided with the following devices:

· fixed calibration high pressure gauge (40 bar) with manual reset: it is located on the pressing line side of the compressor and has the task to stop the compressor operation in the event of abnormal operating pressure;

· high pressure transducer: it is placed on the low pressing line side of the compressor and signals the work pressure to the control board, generating a pre-warning and alarm in case of abnormal pressure;

· low pressure transducer operating as a low pressure gauge: it is placed on the intake pipe of the compressor and signals the work pressure to the control board, generating a pre-warning and alarm in the event of abnormal operating pressure;

· cooling circuit safety valves, the one on the low pressure side is calibrated at 30 bar, the one on the high pressure side at 45 bar: they operate discharging the overpressure in the event of abnormal pressure;

· DCPX condensation pressure controller: it allows successful operation with outdoor temperatures below 10 °C, and up to – 10 °C. It is an adjustment circuit board which varies the number of fan revs according to the condensation pressure read by the high pressure transducer, in order to keep it

Magellano - Aermec S.p.A. 7 sufficiently high for a correct operation of the unit. It also allows a proper operation in heating mode with outdoor temperatures above 30 °C and up to 42 °C;

· the electric control board is protected by an interlock system of the access door: this lever can be locked using one or more padlocks during maintenance work to prevent the unit from being powered up accidentally.

· The electric board comes complete with: a transformer for the control circuit, a door-lock isolating switch, fuses for compressors and fans, clamps for the remote panel, spring type control circuit terminals, electrical board to be mounted outside with double door and gaskets, electronic controller, control consent relay for evaporator and recovery pumps (only for models without pump units);

· also available: magnetic circuit-breaker protection devices for compressors, magnetic circuit-breaker protection devices for fans, magnetic circuit-breaker protection device for the auxiliary circuit, thermostat controlling the temperature of the exhaust gas of each circuit, phase sequence research (RCS) to control sequence and phases.

Probes and transducers The unit comes complete with: input and output water temperature probes. This way it is possible to operate the compressors in order to keep the temperature of the water produced, or the temperature of the water returning from the system, constant. The unit also has high pressure transducers (one per circuit), and low pressure transducers (one per circuit): these make it possible to view on the microprocessor board the values of the working pressure in the pipe in which they have been installed, and stop the operation of the compressor in the event of abnormal working pressure.

Electronic adjustment The microprocessor has the following functions:

· complete management of the unit by means of a multilingual interface;

· complete management of the compressors according to compressor time periods (stand-by between peaks, minimum operating time, minimum switch-off time, etc.) and rotation of the compressors according to working hours and minimum stand-by times (giving priority to the unit efficiency and accuracy in determining water temperature);

· display of all main variables affecting the chiller operation;

· possibility to modify the main operation parameters;

· pumping unit management;

· antifreeze management on the evaporator by means of resistors and circulation pump contacts;

· remote control by: remote control panel (PGD1 accessory), potential-free contacts, RS485 serial and compatible with Modbus protocol (AER485P1 accessory);

· a multipurpose contact that can be used for power and setpoint requirements, and power limitation;

· temperature controlled by means of a step thermostat at the chiller water inlet (proportional control) or outlet (proportional + integral control);

· daily/weekly timer with 4 time periods per day;

· operation differential and low load (water flow low) automatic calculation);

· operating mode automatic calculation according to the outdoor temperature;

· intelligent control of the system inertia (PULL DOWN and PULL UP functions);

· management of any anomalies of the chiller by means of automatic reset warnings, alarms, and chronological history of the anomalies to help diagnosis the fault;

· unit and black box alarm history feature (alarm history transferable to PC);

· possibility to adjust the flow temperature of the unit based on the outdoor temperature;

· intelligent defrosting; evaporation control by reducing the tan speed;

· the board also allows to display all operation parameters read by probes, such as water temperature, delivery pressure, etc.

System side hydronic unit P2. Only low head pump, and reserve pump DHW preparation side hydronic unit R2. With low head pump, and reserve pump Description of the standard components of the hydraulic circuit The unit is supplied with a Y type water filter. This allows to block and remove any impurities in the hydraulic circuits. It contains a filtering mesh with holes that do not exceed one millimetre in diameter. There is also a flow switch (which blocks the unit in case water is not circulating in the pipes) and a bleed valve.

System side hydronic unit management

Magellano - Aermec S.p.A. 8

One pump plus a reserve pump with rotation managed by the circuit board. Pump rotation takes place cyclically every 2 hours, so as to optimise working hours; during exchange there is always an overlapping by a few seconds so as to ensure the flow switch closing. Exchange takes place automatically in case the operation pump should break.

DHW preparation side pumping unit management One pump plus a reserve pump with rotation managed by the circuit board. Pump rotation takes place cyclically every 2 hours, so as to optimise working hours; during exchange there is always an overlapping by a few seconds so as to ensure the flow switch closing. Exchange takes place automatically in case the operation pump should break.

Available accessories

· AER485P1: RS-485 interface for supervision systems with MODBUS protocol.

· AERWEB300. The AERWEB300 device allows the remote control of the chiller from a common PC via a serial link, by means of a standard PC via Ethernet using a standard browser. Four models are available:

· AERWEB300-6: Web server for monitoring and controlling a maximum of 6 devices in RS485 network;

· AERWEB300-18: Web server for monitoring and controlling a maximum of 18 devices in RS485 network;

· AERWEB300-6G: Web server for the monitoring and control of a maximum of 6 devices in an RS485 network with inbuilt GPRS modem;

· AERWEB300-18G: Web server for the monitoring and control of a maximum of 18 devices in an RS485 network with inbuilt GPRS modem;

· DRE: Electronic device to reduce peak current. It can only be applied in the factory.

· GP: Protection grid protecting the outdoor coil from accidental impacts, and preventing access to the underlying area where the compressors and the chiller circuit are located (each kit includes 2 grids).

· PGD1: Simplified remote panel. It allows performing basic controls of the unit with alarm signals.

Remote controllable to 500 m with a 2 pair shielded twisted pair cable, and TCONN6J000.

· RIF: Current rephaser. Connected in parallel to the motor, it allows a reduction of the input current

(approx. 10%). Only applicable in the manufacturing phase, it should be requested at time of order.

· TRX1: Metal cap replacing the plastic cap mounted for protection in storage tanks with holes and integrative resistances.

· VT and AVX: Anti-vibration mounts to be installed under the base. They help reduce vibrations transmitted to the structure.

Compliance The installation and user manual will be provided with each unit, together with a declaration of conformity pursuant to the unit serial number. The data plate must bear the EC mark.

The NRP range AERMEC chiller unit complies with the following harmonised standards:

· IEC EN 60335-2-40 (Safety standard regarding electrical heat pumps, air conditioners, and dehumidifiers);

· IEC EN 61000-6-1 and IEC EN 61000-6-3 (Electromagnetic emissions and immunity levels for residential environments);

· IEC EN 61000-6-2 and IEC EN 61000-6-4 (Electromagnetic emissions and immunity levels for industrial environments);

· EN378 (Refrigerating system and heat pumps - safety and environmental requirements);

· UNI EN 12735 (Seamless, round copper tubes for air conditioning and refrigeration);

· UNI EN 14276 (Pressure equipment for cooling systems and heat pumps).

It thus complies with the essential requirements of the following directives:

· LVD Directive: 2006/95/EC

· Electromagnetic Compatibility Directive 2004/108/EC

· Machinery Directive 2006/42/EC

· Pressure Equipment Directive 97/23/EC

The product, in accordance with Directive 97/23/EC, meets the Quality Assurance Procedure (form H) with certificate no.06/270-QT3664 Rev.5 issued by notified body n.1131: CEC, via Pisacane 46, Legnano (Milano), Italy.

Drawing 3 of 3 As-Built Drawings

Ramp-2

427A

427B

T-648

Taxiway

Delta

Taxiway

Charlie

E-28 Arresting Gear #3

L

PAR

ITAF

Taxiway

Echo

Ramp-5

Ramp-4

Secondary Red Label

Ramp-3

Taxiway Foxtrot

Taxiway

Bravo

Temp.

Air Force

Pad

419417

E-28 Arresting Gear #1

Inboard

T

T

T

P

T

CP

P

CP

CP

CP

CP

PARKING

LOT

Sentry

House

P

T

P

T

T

T

P

CP

1-D

4-R

2-D

1-D

1-D

4-R

2-D

1-R

1-D

1-D

2-D

4-R

2-R

T

CB

P

1-R

2-D

2-D

2-R

3-R

2-D

4-R

3-D

FIELD

SOCCER

545 547

P

P

P

P

P

VOLLEY

BALL

COURT

CP

P

P

CP

CP

B

A

A

B

VOLLEY

BALL

COURT

S

C P

P

P

CP

P

P

P

P

P

1-R

1-D

EARTH

MOUND

4-R

1-D

F

F

F

T

T

F

F

F

F

F

F

F

S

F

F

F

F

FUEL

CHILL

CHILL

GEN

2-D

1-R

3-D

S

F

1-D

F

P

T

F

CP

CP

PARKING

AREA

EXTERNAL

HELO LIFT

PAD

PRIMARY RED LABEL

Taxiway

Delta

Taxiway

Charlie

Taxiway

Bravo

Taxiway Foxtrot

Inboard

Outboard Outboard

R

Delta

Hammer

Head

E-28 Arresting Gear #2

ITAF

ITAF Crash

Truck

Staging Area

US

TACAN

ITAF

TACAN

Taxiway

Echo

Compass

Rose

ITAF

ITAF

ITAF

ITAF

ITAF

ITAF

ITAF

ITAF

OPS Access

MAFFS

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

YARD

PARKING

It

CP

PARKING

It

A/C

Washrack

CP

T

WATER

TANK

COMM

TOWER

T

T

T

T

T

T

T

F

F

F

F

F

F

F

F

F

F F

F

F

F

F

F F

CRANE

TEST

CELL

ITAF

It 66

It 98

It 195

It //29

It 143

It //31

It 158

It 139

It 179

It 180

It 140

It 160

It 204

It 146

It 211

It 178

It 153

It 200

It 171

It 172

It 173

It 208

It 210

It 174

It //18

It //10

SF1

It //25

It 217 It 165 It 164 It 157

It 176

It 193

It 177

It //07

It //30

It 50

It 49

It 201

It 48

It 45

It 133

It 46

It 212

It 114

It 156

It //03

It //34

It //22

It //51

It //21

It 181

It 44

It 39

It 41

It 40

It 162

It //40

It 39

It 135

It 1152

It 141

It 10

It 12

It 101

It 8

It 102

It 125

It 166

It 168

It 159

It 159

It 16

It 17

It 167

It 169

It 215

It 216

It 183

It //02

It 184

It 187

It 205

It //26

It //59

It //53

It 21

It 56

It 129

It 124

//42

//06It 145

It

C.A. //09

It 214

It 42

It 103

It 65

It //65

It 37

It 35

It 33

It 29

It 137

It 151

It 151

It 147

It 161

It 57 It 207

It //62

It 202

It 203

It //35

It //32

It //67

It 209

It 121

It //04 It 122 It 105

It //05

It //41

It 149

It 111

SVASS

It 213

It 128

It 43

It 107

It // 37

It //37

It // 37

It // 37

It // 27

It 127

It //04

It 99

It //44

It //48

It 38

It 31

It 31

It 147

It 120 It //23

It 28

It 195

It 24

It 7

It 36

It //24

It 109

It 19

It //49

It 106

It 97

It //16

It 199

It //14

It 25

AREA ESPROPRIO ITAF

F

7.00 m

17.00 m

BL

DG

CO

VE

R

SH

EE

T

465/G-00

BLDG 465

D/ B

EN

ER

G Y

CO

NS

ER

VA

TI

O

N M

EA

SU

RE

S

(E

CM

s) , V

AR

IO

US

BU

IL

DI

NG

S at N

AS

I&

II,

S ig on el la

Ita ly

1 2 3 4 5

3 4 5

A

B

C

D

1 2

A

B

C

D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

DRAWFORM REVISION: 9 MAY 2017

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

LANT CAPITAL IMPROVEMENTS

AutoCAD SHX Text

NAPLES, ITALY

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND ~ EURAFSWA

AutoCAD SHX Text

CONCEPT DESIGN

AutoCAD SHX Text

NOV 2016

AutoCAD SHX Text

NAVAL AIR STATION II

AutoCAD SHX Text

SIGONELLA, SICILY, ITALY

AutoCAD SHX Text N33191-16-D-1010/0002

AutoCAD SHX Text STUDIO TECNICO DOTT. ING. SALVATORE SANTAMARIA SANTAMARIA engineering & consulting

AutoCAD SHX Text

DESIGN DEVELOPMENT (35%)

AutoCAD SHX Text

DEC 2016

AutoCAD SHX Text

PREFINAL DESIGN

AutoCAD SHX Text

MAR 2017

AutoCAD SHX Text

FINAL DESIGN

AutoCAD SHX Text

MAY 2017

PIPES IN TUNNEL

UP-0,65

DW-0,65

EXISTING CONCRETE BASEMENT

BASAMENTO IN CLS ESISTENTE

TUBAZIONI IN CUNICOLO

DN 50

CONNESSIONE ALLE

TUBAZIONI ESISTENTI Ø4"

CONNECTION TO

EXISTING PIPE Ø4"

DN 50

DN 50 DN 32

DN 50

DN 160

DN 63

DN 63

VERSO CIRCUITO

POST ESISTENTE

TO CIRCUIT

EXISTING POST

VOLANO ACQUA

FREDDO NUOVO

NEW COLD

WATER TANK

UNITÀ IDRONICHE

INTERNE A CASSETTA

ELECTRICAL PANEL

QUADRO ELETTRICO

HYDRONIC CASSETTES

INDOOR UNIT

BATTERY LIMIT

LIMITE DI TAGLIO

VOLANO ACQUA

CALDA NUOVO

NEW HOT

WATER TANK

PRECISION AIR CONDITIONER

CONDIZIONATORE DI PRECISIONE

INGRESSO TUBI NEL CONTROSOFFITTO

ELECTRICAL PANEL

QUADRO ELETTRICO

VOLANO ESISTENTE

EXISTING

STORAGE TANK

D N

DN 160

DN 160

EXISTING

CONCRETE

BASEMENT

BASAMENTO IN

CLS ESISTENTE

SIPHON CONDENSATE

DRAIN LINE

SCARICO CONDENSA

SIFONATO

SIPHON CONDENSATE DISCHARGE

SCARICO CONDENSA SIFONATO

COLLEGAMENTO ALL'IMPIANTO ESISTENTE.VEDI SCHEMA TAV. M601

REALIZATION OF CONCRETE BASEMENT SLAB WHICH ACCOMODATES THE

NEW EQUIPMENT

INSTALL THE PRECISION AIR CONDITIONER

INSTALLAZIONE DI CONDIZIONATORE DI PRECISIONE

INSTALL HYDRONIC CASSETTES INDOOR UNIT

INSTALLAZIONE DI UNITÀ IDRONICHE A CASSETTA

WORK ITEMS

VOCI DI LAVORO

NUOVA UNITÀ POMPA DI CALORE

NEW HEAT PUMP UNIT

REALIZZAZIONE DEL BASAMENTO IN CLS DESTINATO AD ACCOGLIERE LE

NUOVE APPARECCHIATURE

CONNECTION TO THE PIPES EXISTING.SEE TABLE TAV. M601

VOLANO ACQUA CALDA/FREDDA NUOVO COIBENTATO IN POLIURETANO ESPANSO E

RIVESTITO IN LAMIERINO D'ALLUMINIO

NEW HOT/COLD WATER TANK INSULATED WITH POLYURETHANEFOAM AND COATED

ALUMINUM SHEET

ESEGUIRE LO STAFFAGGIO DEI TUBI CON COLLARI IN GOMMA. LA DISTANZA MINIMA

DEL TUBO DALLA PARETE DEVE ESSERE DI 100 MM. LE DISTANZE MINIME TRA I

COLLARI SONO RIPORTATE NEL FOGLIO M-506

EXECUTE THE PIPES CLAMPING WITH RUBBER COLLARS. THE MINIMUM DISTANCE

OF THE PIPE FROM THE WALL MUST BE 100 MM. THE MINIMUM DISTANCES BETWEEN

COLLARS ARE SHOWN IN M-506 SHEET

Sentry

House

P

F

FUEL

CHILL

CHILL

GEN

F

NO TO SCALE

SCALE 1:100

PROJECT OF THE PIPING AND CONDENSATE DRAIN LINE

PROGETTO TUBAZIONI E LINEA DI SCARICO CONDENSA

UNIT OF MEASUREMENT: MILLIMETER

UNITÀ DI RIFERIMENTO: MILLIMETRI

William.Albertson Rectangle

William.Albertson Text Box Chiller to be Replaced

William.Albertson

BATTERY LIMIT

ELETRICAL PANEL

NEW PRECISION AIR CONDITIONER

INLET TUBES IN THE FALSE CEILING

QUADRO ELETTRICO

LIMITE DI TAGLIO

INGRESSO TUBI NEL CONTROSOFFITTO

NUOVO CONDIZIONATORE DI PRECISIONE

PIPES IN TUNNEL

UP-0,65

DW-0,65

TUBAZIONI IN CUNICOLO

DN 50

CONNESSIONE ALLE

TUBAZIONI ESISTENTI Ø4"

CONNECTION TO

EXISTING PIPE Ø4"

DN 50

DN 50 DN 32

DN 50

DN 160

DN 160

DN 160

DN 160

DN 160

DN 160

DN 63

EXISTING CONCRETE BASEMENT

NEW HEAT PUMP 1 (MULTIPURPOSE)

NUOVA UNITÀ POMPA DI CALORE

BASAMENTO IN CLS ESISTENTE

NEW HEAT PUMP 1 (MULTIPURPOSE)

NUOVA UNITÀ POMPA DI CALORE

VOLANO ACQUA

FREDDO NUOVO

NEW COLD

WATER TANK

VOLANO ACQUA

CALDA NUOVO

NEW HOT

WATER TANK

VOLANO ESISTENTE

EXISTING

STORAGE TANK

EXISTING

CONCRETE

BASEMENT

BASAMENTO IN

CLS ESISTENTE

DN 63

VERSO CIRCUITO

POST ESISTENTE

TO CIRCUIT

EXISTING POST

HYDRONIC CASSETTES INDOOR UNIT

UNITÀ IDRONICHE INTERNE A CASSETTA

ELECTRICAL PANEL

QUADRO ELETTRICO

COLLEGAMENTO ALL'IMPIANTO ESISTENTE.VEDI SCHEMA TAV. M601

REALIZATION OF CONCRETE BASEMENT SLAB WHICH ACCOMODATES THE

NEW EQUIPMENT

INSTALL THE PRECISION AIR CONDITIONER

INSTALLAZIONE DI CONDIZIONATORE DI PRECISIONE

INSTALL HYDRONIC CASSETTES INDOOR UNIT

INSTALLAZIONE DI UNITÀ IDRONICHE A CASSETTA

WORK ITEMS

VOCI DI LAVORO

NUOVA UNITÀ POMPA DI CALORE

NEW HEAT PUMP UNIT

REALIZZAZIONE DEL BASAMENTO IN CLS DESTINATO AD ACCOGLIERE LE

NUOVE APPARECCHIATURE

CONNECTION TO THE PIPES EXISTING.SEE TABLE TAV. M601

VOLANO ACQUA CALDA/FREDDA NUOVO COIBENTATO IN POLIURETANO ESPANSO E

RIVESTITO IN LAMIERINO D'ALLUMINIO

NEW HOT/COLD WATER TANK INSULATED WITH POLYURETHANEFOAM AND COATED

ALUMINUM SHEET

ESEGUIRE LO STAFFAGGIO DEI TUBI CON COLLARI IN GOMMA. LA DISTANZA MINIMA

DEL TUBO DALLA PARETE DEVE ESSERE DI 100 MM. LE DISTANZE MINIME TRA I

COLLARI SONO RIPORTATE NEL FOGLIO M-506

EXECUTE THE PIPES CLAMPING WITH RUBBER COLLARS. THE MINIMUM DISTANCE

OF THE PIPE FROM THE WALL MUST BE 100 MM. THE MINIMUM DISTANCES BETWEEN

COLLARS ARE SHOWN IN M-506 SHEET

Sentry

House

P

F

FUEL

CHILL

CHILL

GEN

F

NO TO SCALE

SCALE 1:50

465M-401

SCALE 1:50 SCALE 1:50

465M-401 465M-401

UNIT OF MEASUREMENT: MILLIMETER

UNITÀ DI RIFERIMENTO: MILLIMETRI

4.72 1.000 4.72 1.600

DN 160 DN 160

DN 160

DN 160

GIUNTO

ANTIVIBRANTE

A MOLLA

JOINT SPRING

ANTIVIBRATION

NOT TO SCALE

FUORI SCALA

HEAT PUMP 1 (MULTIPURPOSE)

POMPA DI CALORE 1 (MULTIPURPOSE)

HEAT PUMP 1 (MULTIPURPOSE)

POMPA DI CALORE 1 (MULTIPURPOSE)

NEW HOT WATER TANK

VOLANO ACQUA CALDA NUOVO

EXISTING CONCRETE BASEMENT

NEW CONCRETE BASEMENT

BASAMENTO IN CLS ESISTENTE

BASAMENTO IN CLS NUOVO

ELETRICAL PANEL

QUADRO ELETTRICO

1.222

CONCRETE BASEMENT OF HOT AND COLD TANKS

BASAMENTO IN CLS DEL VOLANI CALDO E FREDDO

Ø 8 passo 200 mm

Ø 8 passo 200 mm

1.600

1.

PLANT'S ARMOR AVAILABLE

DISPOSIZIONE ARMATURA IN PIANTA

SCALE 1:20

465/M-501

SCALE 1:5

UNIT OF MEASUREMENT: MILLIMETER

UNITÀ DI RIFERIMENTO: MILLIMETRI

SCALE 1:20

465/M-501

3.850

4.250

1.925808100

HEAT PUMP UNIT SECTION

2.

2.200

HEAT PUMP UNIT FRONT OF VIEW

HEAT PUMP UNIT PLAN

1.100

HEAT PUMP UNIT PLAN

WITH REQUIRED DISTANCE

SCALE 1:20

465/M-504

SLAB

SOLETTA

WALL

PARETE

WALL

PARETE

EXSTERIOR PIPE SUPPORT

WELDED TO ANGLE LEGS.

50 X 50 X 6mm STEEL ANGLE FRAMING. ALL-WELDED

10 X 100mm ANCHOR BOLT - TYPICAL OF FOUR

DOUBLE NUTS AND WASHERS. (TYPICAL)

ABCHOR TO SUPPORT WITH STAINLESS STEEL

WITH MITERED JOINTS.

EACH LEG.

REINFORCED CONCRETE.

GRADE.

100 X 100 X 6mm STEEL BASE PLATW

8mm GALVANIZED THREADED U-BOLT.

CAVALLOTTO A "U" DI 8mm IN ACCIAIO

ZINCATO E FILETTATO.

PIASTRA 100 X 100 X 6 DI BASE IN ACCIAIO

SALDATO AGLI ANGOLARI DI SUPPORTO.

10 X 100 mm BULLONE DI ANCORAGGIO PER

TUTTE E QUATTRO LE GAMBE.

ANCORARE IL SUPPORTO CON DOPPI BULLONI

E RONDELLE IN ACCIAIO INOSSIDABILE.

TERRENO.

CALCESTRUZZO ARMATO.

50 X 50 X 6mm TELAIO IN ANGOLARE DI

ACCIAIO TUTTO SALDATO CON ANGOLARI A

45°.

SUPPORTO TUBAZIONE ESTERNA

MULTIPLE CEILING PIPE SUPPORT DETAIL

THREADED ROD

RAIL SUPPORT

PIPE

ANGLE IRON

EXPANSION BOLT

GALVANIZED THREADED U-BOLT.

BOLT

POLYURETHANE FOAM

PARTICOLARE SUPPORTO TUBAZIONI MULTIPLE A SOFFITTO

TASSELLO AD ESPANSIONE

ANGOLARE DI FERRO

BARRA FILETTATA

TUBAZIONE

PROFILATO

CAVALLOTTO A "U" IN ACCIAIO

ZINCATO E FILETTATO.

BULLONE

SCHIUMA DI POLIURETANO

WALL PIPE SUPPORT DETAIL

EXPANSION BOLT

GALVANIZED COLLAR

PIPE WITH INSULATION

PARTICOLARE SUPPORTO TUBAZIONE A PARETE

TUBAZIONE CON ISOLAMENTO

COLLARE ZINCATO

TASSELLO AD ESPANSIONE

VERTICAL PIPE SUPPORT DETAIL

GALVANIZED BOLT Ø 12

PIPE

INSULATION

GALVANIZED COLLAR

NEOPRENE GASKET

GALVANIZED EXPANSION BOLT Ø 16

GALVANIZED IRON ANGLE

GALVANIZED STEEL PLATE

PARTICOLARE SUPPORTO TUBAZIONE VERTICALE

GUARNIZIONE IN NEOPRENE

COLLARE ZINCATO

BULLONE ZINCATO Ø 12

ISOLAMENTO

TUBAZIONE

TASSELLI AD ESPANSIONE ZINCATI Ø 16

ANGOLARE FERRO ZINCATO

PIATTINA DI ACCIAIO ZINCATO

WALL

PARETE

SLAB

SOLETTA

PIPE SLEEVE DETAIL

GALVANIZED FLANGE

INSULATION WITH JACKET

PIPE

GALVANIZED PIPE SLEEVE

CONCEALED SPACES 25 mm EXTENSION

NO EXTENTION IN FINISHED EXPOSED WALL

ROCKWOOL OR FIBERGLASS PACKING

FIREPROOF SEALANT (QUANTITY AS REQUIRED

TO MANTAIN SLAB RATING)

TUBAZIONE

ISOLAMENTO CON RIVESTIMENTO ESTERNO

CONTROTUBO ZINCATO

ESTENSIONE 25 mm NEGLI SPAZI NON IN VISTA

NO ESTENSIONE SU PARETE ESPOSTA IN VISTA

FLANGIA ZINCATA

RIEMPITIVO IN LANA DI ROCCIA

O FIBRA DI VETRO

SIGILLANTE IGNIFUGO (IN QUANTITÀ NECESSARIA

PER MANTENERE LA CLASSE DELLA SOLETTA)

PARTICOLARE CONTROTUBO PER TUBAZIONE

AUTOMATIC AIR VENT DETAIL

AUTOMATIC AIR VENT

INSULATION WITH JACKET

PIPE

SEALANT

COCK

TUBAZIONE

ISOLAMENTO CON RIVESTIMENTO ESTERNO

SIGILLANTE

RUBINETTO

SFOGO D'ARIA AUTOMATICO

PARTICOLARE SFOGO D'ARIA AUTOMATICO

NO TO SCALE

465/M-505

MAXIMUM DISTANCE FROM

SUPPORT TO PIPES

DIAMETER (Ø)

fmax

L

=1000 mm

Ø 32

=1400 mm

Ø 50

=1750 mm

Ø 90

=1550 mm

Ø 63

=1750 mm

Ø 110

=1800 mm

Ø 125

=1850 mm

Ø 160 de di s s

DD

UNIT OF MEASUREMENT: MILLIMETER

UNITÀ DI RIFERIMENTO: MILLIMETRI

NOT TO SCALE

465/M-506

6 bar 1/2"

6 bar 1/2"

Ø160/124.2

Ø160/124.2

Ø 160/124.2

Ø160/124.2

CIRCUITO FREDDO

ALLE BATTERIE DI

RISCALDAMENTO

TERMINALI ESISTENTI

TUBAZIONI NUOVE PER COLLEGAMENTO ALL'IMPIANTO

ESISTENTE BATTERIE DI POSTRISCALDO

COLLEGAMENTO

ALL'IMPIANTO

ESISTENTE AHU/CAC

W A

TE

R

L O

A D

C A

R

IC

O

ID

R

IC

O

LOCALE SERVER ROOM

RECTIFIER ROOM

CAC

C. COOLER

W A

TE

R

L O

A D

C A

R

IC

O

ID

R

IC

O

UI1-UI2-UI3

C. COOLER:

Ø160/124.2

Ø160/124.2

Ø160/124.2

Ø160/124.2

Ø160/124.2

Ø160/124.2

Ø160/124.2

Ø32/24.6 Ø32/24.6

Ø 50/38.8

Ø 50/38.8

1.720 l/h Ø63/48.8 14.020 l/h

COLD WATER

STORAGE TANK

HOT WATER

STORAGE TANK

ALIMENTAZIONE

ELETTRICA ESISTENTE

EXISTING POWER SUPPLY

ALIMENTAZIONE

ELETTRICA ESISTENTE

EXISTING POWER SUPPLY

JOINT SPRING

ANTIVIBRATION

GIUNTO

ANTIVIBRANTE

A MOLLA

JOINT SPRING

ANTIVIBRATION

GIUNTO

ANTIVIBRANTE

A MOLLA

COLD CIRCUIT

CIRCUITO CALDO

HOT CIRCUIT

VOLANO ACQUA

FREDDA

VOLANO ACQUA

CALDA

CONNECTION

EXISTING IMPLANT

CTA / CAC

NEW PIPES FOR LINK TO THE EXISTING

RE-HEAT BATTERIES

HEAT PUMP 1 (MULTIPURPOSE)

POMPA DI CALORE 1 (MULTIPURPOSE)

TO THE EXISTING

HEATING BATTERIES

ST2

ST1

HEAT PUMP 1 (MULTIPURPOSE)

POMPA DI CALORE 1 (MULTIPURPOSE)

Ø160/124.2

CIRCUITO FREDDO

Ø160/124.2

Ø160/124.2

COLD CIRCUIT

Ø160/124.2

CIRCUITO CALDO

HOT CIRCUIT

Ø160/124.2

Ø 50/38.8

Ø 50/38.8

3.510 l/h

2.814 l/h

N.C.

N.C.

LEGEND

LEGENDA

HEATING WATER RETURN LINE

TUBAZIONE RITORNO RISCALDAMENTO

HEATING WATER SUPPLY LINE

TUBAZIONE MANDATA RISCALDAMENTO

CHILLED WATER RETURN LINE

TUBAZIONE RITORNO REFRIGERAZIONE

CHILLED WATER SUPPLY LINE

TUBAZIONE MANDATA REFRIGERAZIONE

SHUT-OFF VALVE

VALVOLA DI INTERCETTAZIONE

3-WAY MIXING VALVE

VALVOLA MISCELATRICE A 3 VIE

CHECK VALVE

VALVOLA DI RITEGNO

MANOMETER

MANOMETRO

THERMOMETER

TERMOMETRO

FLOWMTER

FLUSSOSTATO

1/2" PRESSURE REDUCER

RIDUTTORE DI PRESSIONE DA 1/2"

WATER GAUGE

VALVOLA DI SFOGO ARIA AUTOMATICA

SAFETY VALVE

VALVOLA DI SICUREZZA A MOLLA

Ø.../...

FLEXIBLE CONNECTION

COLLEGAMENTO FLESSIBILE

BALANCING VALVE

VALVOLA DI BILANCIAMENTO

PIPELINE EXTERNAL/INTERNAL DIAMETER

DIAMETRO ESTERNO/DIAMETRO INTERNO TUBAZIONE

EXISTING PLANT

IMPIANTO ESISTENTE

HEAT PUMP

POMPA DI CALORE

COLD WATER STORAGE TANK

VOLANO FREDDO

CONDENSATE PUMP INTEGRAL WITH COMPUTER ROOM UNIT

CONDENSATORE ESTERNO INTEGRATO CON L'UNITA' DEL LOCALE COMPUTER

CHECK UNDER CONSTRUCTION THE NEED 'TO REPLACE

EXISTING POWER ELECTRICAL CABLES

VERIFICARE IN FASE DI REALIZZAZIONE LA NECESSITA' DI SOSTITUIRE

I CAVI ELETTRICI ESISTENTI

TUTTE LE NUOVE TUBAZIONI SARANNO IN PPR CON ISOLAMENTO

E FINITURA IN LAMIERINO DI ALLUMINIO

NEW PIPES OF PPR WITH INSULATION AND ALUMINIUM PLATE FINISH

HOT WATER STORAGE TANK

VOLANO CALDO

WORK ITEMS

VOCI DI LAVORO

GENERAL NOTE

NOTE GENERALI

OGNI VOLTA CHE VENGONO UTILIZZATI TUBI IDRONICI ESISTENTI, È NECESSARIO ESEGUIRE UNA COMPLETA VALIDAZIONE, PIÙ LA PROVA DI PERDITE D'ACQUA E LA PROVA DI CORROSIONE E TUTTE LE TUBAZIONI DEVONO ESSERE SVUOTATE

EVERY TIME EXISTING HYDRONIC PIPES ARE USED, FULL VALIDATION SHOULD BE DONE PLUS WATER

LEAK TEST AND CORROSION TEST AND ALL PIPELINES SHOULD BE FLUSHED

NOT TO SCALE

HYDRONIC HEATING SYSTEM DIAGRAM

SCHEMA FUNZIONALE IMPIANTO RISCALDAMENTO IDRONICO

TREND SUPERVISOR

CONTROLLER

MEASURING

ELECTRIC ENERGY

MODBUS RS485

HEAT PUMP 1

MULTIPURPOSE

HEAT PUMP 2

MULTIPURPOSE

CAC

TCP/IP

DDC TREND

C A

V O

U

TP

MISURATORE ENERGIA

ELETTRICA

MEASURING

ELECTRIC ENERGY

MISURATORE ENERGIA

ELETTRICA

MEASURING

ELECTRIC ENERGY

MISURATORE ENERGIA

ELETTRICA

POMPA DI CALORE 1

POMPA DI CALORE 2

HOT WATER

COLD WATER

ACQUA FREDDA

ACQUA CALDA

HOT WATER

COLD WATER

ACQUA FREDDA

ACQUA CALDA

SUPERVISORE TREND

BATTERY LIMIT

EXISTING TELECOM SWITCH TO

ETHERNET…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.