RFC QandA 9 Solicitation N3220522R4066.pdf

PDF 252 KB Posted

Attached to
USNS ZEUS Mid-Term Availability Federal contract opportunity
Solicitation number
N3220522R4066
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains questions and answers regarding solicitation N3220522R4066 for the USNS ZEUS Mid-Term Availability. The solicitation is for ship repair work on the USNS ZEUS (T ARC 7), including removal and replacement of deck plates and gratings, and inspections and repairs of items in accordance with the provided specifications. Drawings are attached to provide details on decking, fasteners and quantities. Contractors are instructed to perform inspections and provide an "as found" conditions report with recommended repairs for items in paragraph 7.4. The response date for the total small business set-aside solicitation was July 21, 2022. The Department of the Navy Military Sealift Command is the contracting agency.

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N3220522R4066

QUESTIONS AND ANSWERS

The following are answers to questions received from potential offerors. The answers provide clarification only and do not constitute an amendment to the solicitation.

QUESTION: Specification Item No: WI 105/106

Please provide drawings for the Deck Plates or Grating to be removed, Cleaned, inspected, painted and reinstalled. For estimating purposes, what are the count of grating pcs per space, the proper installation hardware and plate sizes, and the footage and MIL-PRF of rubber padding called out in WI 0105 7.1

ANSWER:

Drawing 5503947B and 5503946A (attached) provide a general plan for decking, fasteners and approximate quantities. All deck plates to be repaired or replaced shall be templated from the ship/examples removed. Omit the rubber padding in WI 0105 7.11, as it is not per references.

QUESTION: Specification Item No: WI 305

New WI #305 received 7/6/2022, KATO requests additional information for paragraphs 7.4.4 and 7.4.5 in order to quote repairs. Please give more detailed explanation of know problems.

ANSWER:

In accordance with paragraph 7.7.1.1, contractor should perform inspections of items in paragraph 7.4, and IAW paragraph 7.11.1 provide an “AS FOUND” conditions report including all recorded megger readings, recommended repairs and/or parts replacements.