A001-01 Transition Plan.docx
DOCX document 29 KB Posted
- Attached to
- Sea-Based X-Band Radar (SBX-1) Security Services Federal contract opportunity
- Solicitation number
- N3220522R0007
About this file
This document contains a Contract Data Requirements List (CDRL) and information about a related federal contract opportunity for security services on board the Sea-Based X-Band Radar (SBX-1) vessel.
The CDRL requires the contractor to submit a Transition Plan as a one-time deliverable with the proposal. The Transition Plan must include a demobilization schedule and accommodate the transition between the incumbent contractor and the performing contractor.
The federal contract opportunity is a solicitation from the Military Sealift Command to provide qualified security officers on the SBX-1 vessel. The services will provide security and protection in accordance with applicable directives. The requirement includes a base period of 365 days and four one-year option periods starting on October 1st, 2022. The operating area will be the Pacific Ocean. Contractors must possess a SECRET facility clearance and employ personnel with SECRET clearances. Proposals are due by an unspecified date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3220522R00070002.pdf | ||
| 22R0007 Q_A 3.pdf | ||
| Att I Inv Requirements.pdf | ||
| 22R0007 Q_A 2.pdf | ||
| N3220522R0007-0001 Conformed.pdf | ||
| N3220522R0007-0001 SF30.pdf | ||
| 22R0007 Q_A 1.pdf | ||
| Att A 22R0007_GFP.xlsx | XLSX spreadsheet | |
| Att K PAST PERFORMANCE NARRATIVE.docx | DOCX document | |
| Att P Pricing Forms A-C.xlsx | XLSX spreadsheet | |
| Att C WD 2015568915.pdf | ||
| Att D 22R0007 DD254.pdf | ||
| Att F CDRLs.zip | ZIP file | |
| Att J MECSP Worksheet.doc | DOC document | |
| Att B Sample VSP.pdf | ||
| N3220522R0007.pdf | ||
| Att G SFLLL.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TBD |
| A |
| TDP |_| TM |_| OTHER |_| |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SBX-1 |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A001 |
| TRANSITION PLAN |
| TRANSITION PLAN |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| N/A |
| SOW C1.23 |
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
| N/A |
| Distribution Statement E (DoDI 5230.24) |
| ASREQ |
| With proposal |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
| n/a |
| As required |
| Elec |
| H/C |
16. REMARKS:
The contractor shall provide a plan to accommodate the transition between the incumbent contractor and the performing contractor. The Transition Plan shall include a demobilization schedule as well. This is a one-time deliverable due with the proposal.
Block 9: Distribution Statement E - Distribution authorized to DoD Components only (Administrative/Operational Use) (determined 23 August 2012). Other requests shall be referred to (Military Sealift Command Special Missions Office PM2).
Block 13: As Required
Block 14: Project Officer/COR Contracting Officer
Project Officer/COR
Contracting Officer
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
File details come from the government source that posted it. Updated .