J-2 USNS Grumman rev 1 (RFC 021).xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- USNS LEROY GRUMMAN FY22 MTA
- Solicitation number
- N3220521R4198
About this file
This document outlines requirements for the USNS Leroy Grumman FY22 maintenance, repair, and overhaul contract opportunity with the Military Sealift Command. Key requirements include general services and logistics support, hull repairs and structural work, propulsion machinery maintenance, electrical system overhauls, communication and navigation equipment maintenance, auxiliary machinery services, habitability and outfitting upgrades, HVAC work, drydocking, and underway replenishment equipment repairs. The total estimated cost of all requirements is $40,376. Products and services must be provided from June 2021 through May 2022.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WorkPackage J-2 Report
| CATEGORY "A" ITEMS | |||||||||||
| N3220521R4198 | |||||||||||
| GENERAL REQUIREMENT | PRIME CONTRACTOR | SUBCONTRACTOR | MANDATED SUB | OTHER COSTS | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL PRICE | BASIS OF ESTIMATE | |
| CATEGORY "A" | |||||||||||
| 000 | GENERAL SERVICES AND REQUIREMENTS | ||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) REV 22 APR 20 | 86 | |||||||||
| 011 | GENERAL SERVICES FOR SHIP T AO REV 23 APR 20 | 4903 | |||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES REV 7Aug19 | 98 | |||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS REV 1May18 | 302 | |||||||||
| 014 | WEIGHT MOMENT REPORT, REV FEB 14 | 80 | |||||||||
| 015 | ILS GFM REV 28Oct18 | 448 | |||||||||
| 016 | FIRE PROTECTION AND SHIPS SAFETY PROGRAM REV 28Sep17 | 56 | |||||||||
| 017 | HANDLING SHIPS STORES, REV FEB 14 | 184 | |||||||||
| 018 | DELIVERY AND REDELIVERY, REV MAY 16 | 480 | |||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY REV 28Nov18 | 440 | |||||||||
| 020 | GAS FREE CERTIFICATES, REV FEB 14 | 700 | |||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS AND COFFERDAMS, REV OCT 2012 | 2800 | |||||||||
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS REV 28Sept17 | 340 | |||||||||
| 023 | HAZARDOUS WASTE DISPOSAL, REV MAY 16 | 0 | |||||||||
| 090 | Level I Daily Covid Cleaning Apr 21 | 40 | |||||||||
| 103 | RELOCATE WEAPONS CONTAINERS TO MEET SESI REQUIREMENTS | 480 | |||||||||
| 100 | HULL AND STRUCTURAL | ||||||||||
| 101 | TAO187_CSI_KINGPOST NON-DESTRUCTIVE TESTING (1 YR) | 400 | |||||||||
| 102 | REPLACE DOORS ON SMALL ARMS SHIPBOARD SPACES TO MEET SESI | 90 | |||||||||
| 102 | REQUIREMENTS | 90 | |||||||||
| 107 | 07 LEVEL DECK STEEL RPLCMT | 1400 | |||||||||
| 109 | PUMP ROOM TANK TOP STEEL DECK RPLCMN | 1800 | |||||||||
| 110 | 01 LEVEL DECK STEEL RPLCMT | 1100 | |||||||||
| 134 | Fire Main _AFFF LP Air Piping Replacement docx | 100 | |||||||||
| 158 | Tank Preservation 6P CCSI | 350 | |||||||||
| 200 | PROPULSION MACHINERY | ||||||||||
| 211 | TAO187_CSI_MAIN REDUCTION GEAR INSPECTION - CINCINNATI (1 YR)(SCSI) | 30 | |||||||||
| 300 | ELECTRICAL | ||||||||||
| 301 | Various Motor Overhauls | 360 | |||||||||
| 304 | ANNUAL CARGO CONSOLE GROOM | 300 | |||||||||
| 353 | THERMOGRAPHIC SURVEY (1YR) -17JAN19 | 25 | |||||||||
| 400 | COMMUNICATION AND NAVIGATION | ||||||||||
| 401 | SESI ARMORY INTRUSION DETECTION SYSTEM (IDS) INSTALL | 1018 | |||||||||
| 404 | TAO187_CSI_DOPPLER SPEED LOG MAINTENANCE (1 YR) | 25 | |||||||||
| 405 | Annual TV DTS System Maintenance | 160 | |||||||||
| 453 | TAO187_CCSI_ANNUAL GYRO SERVICE | 40 | |||||||||
| 454 | ANNUAL VDR RECERTIFICATION | 40 | |||||||||
| 455 | ANNUAL RADIO COMMUNCATION EQUIPMENT RECERTIFICATION | 10 | |||||||||
| 456 | Annual Magnetic Compass Inspect- Align | 0 | |||||||||
| 460 | TAO187_CCSI_ANNUAL INSPECTION OF MANUALLY OPERATED ALARMS | 10 | |||||||||
| 490 | T-AO 0928 ECDIS RADAR REPLACEMENT | 7000 | |||||||||
| 500 | AUXILIARY MACHINERY | ||||||||||
| 501 | MSD TREATMENT TANK RENEWAL | 400 | |||||||||
| 502 | Misc Pumps Overhaul 2021 | 2000 | |||||||||
| 507 | Pressure Vessel and Relief Testing | 620 | |||||||||
| 509 | Annual Incinerator Service (ABS) | 0 | |||||||||
| 515 | AC or Refrigerator system PM | 40 | |||||||||
| 530 | ER OWS and Cargo OCM Certification Rev A | 0 | |||||||||
| 558 | Personal Elevator Annual Inspection | 0 | |||||||||
| 562 | SCBA Annual Inspection | 0 | |||||||||
| 563 | SCBA Air Compressor Inspection | 0 | |||||||||
| 565 | Annual HALON Inspection & Test | 0 | |||||||||
| 567 | Annual AFFF Inspection & Test | 80 | |||||||||
| 569 | Annual Fire & Smoke Detection & Alarm (2) | 270 | |||||||||
| 570 | Portable Extinguisher Service | 60 | |||||||||
| 571 | Annual Fire and Smoke Damper Service (rev 6MAR18) | 940 | |||||||||
| 572 | Deep Fat Fryer, Grill & Range Hood Fire Extinguishing System | 0 | |||||||||
| 573 | Fire Hoses | 120 | |||||||||
| 574 | FIRE WTD DOORS AND SHUTTERS | 600 | |||||||||
| 600 | HABITABILITY OUTFITTING AND FURNISHINGS | ||||||||||
| 613 | Floor Covering Renewal | 1200 | |||||||||
| 651 | Annual Lifeboat and Davit Inspection | 200 | |||||||||
| 653 | Annual Rescue Boat and Davit Inspection | 200 | |||||||||
| 655 | Immersion Suit Service | 80 | |||||||||
| 656 | Annual Liferaft Certification | 40 | |||||||||
| 657 | TAO187_CCSI_ACCOMMODATION LADDER INSPECTION (1 YR) | 200 | |||||||||
| 662 | TAO187_CCSI_DEEP FAT FRYER INSPECTION (1 YR) | 1 | |||||||||
| 800 | HVAC | ||||||||||
| 803 | Misc Lagging Insulation Renewal | 800 | |||||||||
| 851 | Annual Gaylord Vent Cleaning | 40 | |||||||||
| 852 | Annual Laundry Vent Cleaning | 40 | |||||||||
| 900 | DRYDOCKING | ||||||||||
| 958 | TAO187_CCSI_PROPELLER CLEAN AND POLISH - IN WATER (0.5 YR) | 150 | |||||||||
| 000 | UNDERWAY REPLENISHMENT EQUIPMENT | ||||||||||
| 001 | UNREP Station No.4 Steel Repairs | 200 | |||||||||
| 004 | Saddle Winch Foundation Refurbishment final | 300 | |||||||||
| 005 | BAND BRAKE REPLACEMENT | 600 | |||||||||
| 006 | ASD FRAME AND FOUNDATION REFURBISHMENT DONE 5-2-2021 | 600 | |||||||||
| 007 | Winch control booth window replacement | 500 | |||||||||
| 008 | RAM sheave block refurb packing replacement april 24 2021 | 2000 | |||||||||
| 009 | Station 3 and 4 Sliding Block Chains _edited (2) | 2100 | |||||||||
| TOTAL | 40376 |
File details come from the government source that posted it. Updated .