This document contains questions and answers regarding a forthcoming mid-term availability solicitation for the USNS Arctic. The solicitation will be issued by the Department of the Navy Military Sealift Command for ship repair and maintenance work commencing in July 2021. Key work items include replacing deck tie down sockets, upgrading surveillance systems, conducting ultrasonic testing, replacing elevator pit steel, repairing exterior air intakes, repairing cargo handling equipment, and inspecting firefighting systems. References and drawings are provided or made available for many of the line items. One question notes a company is no longer approved to perform firefighting inspections. Overall this document provides clarification to potential offerors on technical requirements for the upcoming solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to USNS ARCTIC Mid-Term Availability, newest first.
File Type Posted
Q and A 3.docx DOCX document
N3220521R4096 USNS ARCTIC 2021 SOLICITATION Amended.docx DOCX document
Q and A 4.docx DOCX document
J - 12 Past Performance Data.doc DOC document
J - 13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J - 9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
N3220521R4096 USNS ARCTIC 2021 SOLICITATION.docx DOCX document
J - 7 MSC Ship Repair Facility Survey.doc DOC document
J - 8 Request for Spec Clarification.doc DOC document
J - 4 GFM LIST USNS ARCTIC FY 21 MTA.xlsx XLSX spreadsheet
J - 11 Dry Dock Evaluation Form.docx DOCX document
J - 10 Interport Differential - Arctic Nov MTA 2018.docx DOCX document
J - 3 Category B Items ARCTIC.xls XLS spreadsheet
J - 2 Category A Items ARCTIC.xls XLS spreadsheet
J - 14 Technical Data Non-Disclosure.docx DOCX document
SYNOPSIS N3220521R4096 USNS ARCTIC.docx DOCX document
SOURCES SOUGHT FOR USNS ARCTIC MTA 2021.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N32205-21-R-4096

QUESTIONS AND ANSWERS #2

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

QUESTION #1:

SPECIFICATION ITEM NO.: 103, PARAGRAPH / SECTION NO: 7.2.4, Titl: Deck Tie Down Replacement The Written Work Item is missing.

1. Can the new socket be, renewed into the deck as a whole unit opposed to cutting out the crosshairs and reinstalling in the existing sockets?

2. Does the GOV have ABS welding procedure for welding the 4130 material crosshair parts to the 8620 material cups?

3. Is heat treatment required for welding the crosshairs to the cups as this was not highlighted within the scope of work document. Only lists PT and Pull Test.

ANSWER:

1. Can the new socket be renewed into the deck as a whole unit opposed to cutting out the crosshairs and reinstalling in the existing sockets?

ANSWER: YES THE ENTIRE SOCKET CAN BE REPLACED. PAST EXECUTION OF THIS WORK ITEM HAS FOUND THAT REPLACING JUST THE CROSS HAIRS IS LESS INTRUSIVE AND DOESN’T REQUIRE AS MUCH DISTURBANCE AND REMOVAL OF THE UNDERLYING INTERFERENCES FOR HEAT DAMAGE. IF THE CONTRACTOR CHOOSES TO BID BASED ON TOTAL REPLACEMENT, THE BID SHOULD INCLUDE HOURS FOR THE ADDITIONAL WORK. CHANGE ORDERS FOR ADDITIONAL COMPENSATION BASED ON THE ENTIRE REPLACEMENT VICE AS PER THE SPEC WILL NOT BE ENTERTAINED.

2. Does the GOV have ABS welding procedure for welding the 4130 material crosshair parts to the 8620 material cups?

NO, IT IS UP TO THE CONTRACTOR TO OBTAIN.

3. Is heat treatment required for welding the crosshairs to the cups as this was not highlighted within the scope of work document. Only lists PT and Pull Test.

PT AND PULL TEST IS ALL THAT IS REQUIRED.

QUESTION #2:

SPECIFICATION ITEM NO.: 404, PARAGRAPH / SECTION NO: 7.12 Manufact. Rep. TITLE: Ship wide Surveillance System repairs.

7.12.1 Shipyard shall provide authorized OEM representative for Existing PELCO CCTV System; Custom Panel and Controls to perform this work.

Please clarify this statement. Is the intent to have a Pelco rep, verify the new system installation and verify the custom panels and controls? Also to commission the system?

ANSWER: THE REQUIREMENT IS TO HAVE CUSTOM PANELS AND CONTROLS PERFORM THE INSTALLATION. THE REFERENCE TO PELCO IS THAT THE EXISTING SYSTEM INSTALLED IS A PELCO SYSTEM. IT IS NOT THE INTENT TO HAVE PELCO PERFORM THE UPGRADE.

THE CONTRACTOR IS TO USE CUSTOM PANELS AND CONTROLS.

QUESTION #3:

SPECIFICATION ITEM NO.: 911, PARAGRAPH / SECTION NO: 3.2 & 7.2, Title: Ultrasonic Testing Paragraph 3.2 gives the quantity of readings to be 6,000 and paragraph 7.2 give the quantity of readings to be 3,000, please advise correct quantity.

ANSWER: Work item has been corrected and reissued as: 0911 A ULTRA SONIC TESTING REV ARCTIC MTA REV 1.

QUESTION #4:

SPECIFICATION ITEM NO.: 105, PARAGRAPH/SECTION NO: _____TITLE: Elevator Seven Pit Steel Replacement.

The J-2 lists work item 105 but the specification was not provided, please advise.

ANSWER: See Work Item 105 as provided.

QUESTION #5:

SPECIFICATION ITEM NO.: Section B, TITLE: ODC.

Section B CLIN 0002 does not provide the ODC base amount, please provide.

ANSWER:

ODC
G&A and Profit 18%
Total
$1,000,000.00
$180,000.00
$ 1,180,000.00

QUESTION #6:

SPECIFICATION ITEM NO.: 501, TITLE: Firefighting System equipment Inspection.

QUESTION:

1.Fixed CO 2 and Halon Systems - Please clarify if weighing of each bottle is required.
2.Please provide number of Gaylord Hoods and actuated dampers.
3.Please advise how many fusible links are in each APC System.
4.Please provide Extinguisher list showing types and quantities.
5.Paragraphs 7.10.1 D &F - AFFF Service refill agent is no longer listed and sold from the Manufacture, please advise.
6.Additional information and service is required for Section 7.5, Foam Proportioning Systems, which requires discharging foam. Please advise the quantity of tanks.

ANSWER: THE QUESTIONS ASKED INDICATE A SUB-CONTRACTOR WHOM IS UNFAMILIAR WITH THE T-AOE SYSTEMS OR SYSTEMS IN GENERAL. EXPERIENCED SUB-CONTRACTOR.

IF THESE QUESTIONS WERE SUBMITTED BY THE COMPANY RCARTER, BE ADVISED THAT RCARTER HAS LOST THEIR ABS CERTIFICATION DUE TO INAPPROPRIATE INSPECTION PRACTICES ON THE USNS SUPPLY IN ALABAMA SHIPYARD. THEY ARE NO LONGER PERMITTED TO PERFORM FIRE FIGHTING EQUIPMENT INSPECTIONS ON MSC SHIPS.

QUESTION #7:

SPECIFICATION ITEM NO.: 506, TITLE: Install NR1 SSDG Saltwater Strainer.

WI 504 and WI 506 specification files are titled as INSTALL NR1 SSDG SALTWATER STRAINER. The header of WI 506 identifies the item as WI 504. Attachment J-3 identifies WI 504 as “RESERVED” and WI 506 as “INSTALL NR1 SSDG SALTWATER STRAINER….”. Please clarify.

ANSWER: It is a typo error. The work item for the SSDG Saltwater Strainer is WI 506. See attached please.

QUESTION #8:

SPECIFICATION ITEM NO.: Solicitation N3220521R4096 , PARAGRAPH/SECTION NO.: Section L, Para L-5, TITLE: Inspection of Vessel/Pre-Proposal Conference.

Solicitation N3220521R4096, Section L, Paragraph L-5a, INSPECTION OF VESSEL / PRE-PROPOSAL CONFERENCE, states,” There will be no inspection for the USNS ARCTIC.”. Will the government provide pictures of the repairs/modification areas to the contractor, upon request, in lieu of an inspection?

ANSWER: There will be no bidders ship check due to COVID19 restrictions. The contractor is free to ask for pictures.

QUESTION #9:

SPECIFICATION ITEM NO.: 101, PARAGRAPH/SECTION NO.: 3.1-3.1.5 and 7.6-7.11, TITLE: Replace Deck Machinery Shop(s) Overhead.

Spec item 101 para 3.1 – 3.1.5.6 identifies “Lap Plates”, paragraph 7.6 – 7.11 leads the contractor to believe that contractor is not installing lap plates but full penetration inserts. Is it the governments intent to remove existing lap plates and install inserts?

ANSWER: It is the government’s intention to remove existing lap plated and install permanent inserts.

QUESTION #10:

SPECIFICATION ITEM NO.: 0002, TITLE: AGR and ODC, FOR AGR and ODC 18000 man-hours are provided, but no value for ODC. Please provide Base $ amount.

ANSWER: AGR Hours 18000 @ $60.00 = $1,080,000.00, ODC $1,000,000.00 + 18% G&A = $1,180,000.00.

QUESTION #11:

SPECIFICATION ITEM NO.: 105, PARAGRPH/SECTION NO:. 2.0, TITLE: Elevator 7 Steel Reapir and Preservation ARCTIC MTA Initial.

Please provide the following reference:

2.2 NAVSEA Drawing No. 085-6363081 Booklet of General Drawings ANSWER: The contractor was provided the below drawings in addition to the one that is being requested. Either one of the below drawings are an acceptable substitute.

NAVSEA Drawing No. 085-6360536; Booklet of General Drawings MSC Drawing Nr. 085-8385180 General Arrangement.

QUESTION #12:

SPECIFICATION ITEM NO.: 804, PARAGREAPH/SECTION:. Various, TITLE: Exterior House Air Intake Housing repair ARCTIC MTA Initial.

Please provide more information on the hinges, fasteners, and the pre-filters.

ANSWER: The government apologizes for lack of information. This area was not well documented from the ship builder and there is limited information available. Government recommends the contractor place a material dollar figure into its bid.

QUESTION #13:

SPECIFICATION ITEM NO.:1004, PARAGRAHG/SECTION NO.: 2.2. 2.3, 2.4 and 2.6. TITLE: Repair Trolley Stowage Arms ARCTIC MTA Initial.

Please provide the following references:

2.2 NAVSEA Dwg. No.5363431, Transfer Head Assy

2.3 NAVSEA Dwg. No.5363436, Trolley Stowage Arm

2.4 NAVSEA Dwg. No.5363362, Trolley Stowage Arm Bolt

2.6 NAVSEA Dwg. No.5746873, Shim, Latch Handle

ANSWER: Please see provide references via DOD Safe website.

QUESTION #14:

SPECIFICATION ITEM NO.: 1005, PARAGRAPH/SECTION:. 2.1, 2.2 and 2.3. TITLE: Station Five and Six Topping Winch Repair.

Please provide the references called out in paragraphs 2.1 thru 2.3.

NAVSEA TG813-AV-MMA-010 MAINT MANUAL FOR TOPPING WINCH

S9086-TK-STM-010 / CH-571

NAVSEA DWG 6580814 SOLID CARGO HANDLING STATIONS ARRANGEMENTS AND DETAILS ZONES D-51 & D-52 ANSWER: Government can provide:

NAVSEA DWG 6580814 SOLID CARGO HANDLING STATIONS ARRANGEMENTS AND DETAILS ZONES D-51 & D-52

S9086-TK-STM-010 / CH-571

Suggest contacting PHD Rep Kirby Strunk @ kirby.strunk@navy.mil to obtain the remaining reference.

QUESTION #15:

SPECIFICATION ITEM NO.: 404, PARAGRAPH/SECTION 2.1.2 CCTV Ethernet Architecture Diagram. TITLE: Ship Wide Surveillance System Repairs.

Bill of materials item 26 list 15 each monitor needed. Can we get a make, model of type preferred?

ANSWER: Dell - S2421H 24” IPS LED FHD - AMD FreeSync - VESA - Monitor (HDMI) – silver.

QUESTION #16:

SPECIFICATION ITEM NO.: 804, PARAGRAPH/SECTION NO.: 7.4.2, TITLE: A Exterior House Air Intake Housing Repair ARCTIC MTA Initial.

Paragraph 7.4.2 states “All pre-filter access methods to be renewed as original including hinges, clamps, and access panel sizes.” Reference MSC Drawing No. IL6263499, Anderson Metal Industries, “Filter System, HEPA (Shipboard) looks to be a drawing index list. There is not enough information to price renewing these items. Also reference MSC Drawing No. AP8-12122FR, Anderson Metal Industries, “Frame, Pre-Filter” is for one filter housing size. There is a 15 AF, 16 AF, 12 AF filter. Please provide drawings that are highlighted below. If no drawings are available, please provide more information on material list in paragraph 7.4.2(size, material type, etc).

ANSWER: Please see requested drawings via DOD Safe website.

QUESTION #17:

SPECIFICATION ITEM NO.: 401, 501, 502, 503, 507, 601, 1001, 1003, 1004, 1005, PARAGREAPH/SECTION:. 2.0 for all items, TITLE: Missing references.

The following items have missing references that were not provided by MSC. Some items state that references are available aboard ship, to be provided by Port Hueneme Representative, or they weren’t provided. Please provide missing reference listed below.

Item 401

2.1 Code of Federal Regulations, Title 47, Part 80

2.2 GMDSS Inspection Checklist

Item 501

2.1.1 MSC DWG 085-7489530 Rev B, USNS Arctic Fire Control Plan.

2.1.8 NAVSEA DWG 7096300; APC System Release Circuit 3FR Block & Elem Wiring Diag.

2.1.9 NAVSEA DWG 6360581; HVAC System Diagram.

2.1.17 USNS Arctic 5 lb. CO2 Inventory

Item 502

2.1 T6220-B1-MMC-010, Operation and Maintenance Breathing Air Quality compressor and Refill Station, Model 9400E3MSC and M3100-3MSC.

2.2 MAKO Compressor and Filling Station Tech Manuals (available onboard vessel).

Item 503

2.1 SMS Procedure 2.3-002-ALL Rev 2.6 - SCBA

Item 507

2.4 ABB, Model VTC 254-14 Gas Turbochargers Technical Manual Available Onboard Ship

2.5 Woodward Governor Product Manual 82340; EGB-Proportional Governor/Actuator with Hydraulic Amplifier Systems.

Item 601

2.1 Navigation and Vessel Inspection Circular No. 01-08; Subject “Shipboard Inspection and Testing of Immersion Suits Item 1001

2.1 Winch, Saddle, Navy Standard Three Speed/Two Speed, MK1 MOD 1 SG813-B6-TRS-010 (to be provided by Port Hueneme Representative) Item 1003

2.3 MSC DWG Winch Booth Plate Replacement

Item 1004

2.3 NAVSEA Dwg. No.5363436, Trolley Stowage Arm

2.4 NAVSEA Dwg. No.5363362, Trolley Stowage Arm Bolt

2.6 NAVSEA Dwg. No.5746873, Shim, Latch Handle

Item 1005

2.1 NAVSEA TG813-AV-MMA-010 Maintenance Manual for Topping Winch. (Aboard ship)

2.3 NAVSEA DWG. 6580814, Solid Cargo Handling Stations Arrangements and Details Zones D-51 and D-52.

2.4 MSCLANT Std Item No. 19 “Recondition Motor, Squirrel Cage (AC) Service”.

ANSWER: References will be sent via DOD safe website.

1. Code of Federal Regulations, Title 47, Part 80 is available online and via any subcontractor that specializes in Bridge Navigation certifications.

2. GMDSS Inspection Checklist – provided.

3. MSC DWG 085-7489530 Rev B, USNS Arctic Fire Control Plan - provided.

4. NAVSEA DWG 7096300; APC System Release Circuit 3FR Block & Elem Wiring Diag. – Provided.

5. NAVSEA DWG 6360581; HVAC System Diagram. – provided.

6. USNS Arctic 5 lb. CO2 Inventory – provided.

7. T6220-B1-MMC-010, Operation and Maintenance Breathing Air Quality compressor and Refill Station, Model 9400E3MSC and M3100-3MSC. Provided.

8. MAKO Compressor and Filling Station Tech Manuals (available onboard vessel). – unavailable and SCBA technicians are familiar.

9. SMS Procedure 2.3-002-ALL Rev 2.6 – SCBA- provided.

10. ABB, Model VTC 254-14 Gas Turbochargers Technical Manual Available Onboard Ship – Unavailable – Recommend contact ABB or CAT Service Center.

11. Woodward Governor Product Manual 82340; EGB-Proportional Governor/Actuator with Hydraulic Amplifier Systems. – Unavailable Recommend contact Woodward Governor or Local Cat Service Center.

12. Navigation and Vessel Inspection Circular No. 01-08; Subject “Shipboard Inspection and Testing of Immersion Suits – provided.

13. Winch, Saddle, Navy Standard Three Speed/Two Speed, MK1 MOD 1 SG813-B6-TRS-010 (to be provided by Port Hueneme Representative) Kirby.strunk@navy.mil

14. MSC DWG Winch Booth Plate Replacement – provided.

15. NAVSEA Dwg. No.5363436, Trolley Stowage Arm - provided

16. NAVSEA Dwg. No.5363362, Trolley Stowage Arm Bolt – provided.

17. NAVSEA Dwg. No.5746873, Shim, Latch Handle – provided.

18. NAVSEA TG813-AV-MMA-010 Maintenance Manual for Topping Winch. (Aboard ship) contact Kirby.strunk@navy.mil

19. NAVSEA DWG. 6580814, Solid Cargo Handling Stations Arrangements and Details Zones D-51 and D-52. Provided

20. MSCLANT Std Item No. 19 “Recondition Motor, Squirrel Cage (AC) Service”. Provided.