J - 2 Category A Items ARCTIC.xls
XLS spreadsheet 55 KB Posted
- Attached to
- USNS ARCTIC Mid-Term Availability Federal contract opportunity
- Solicitation number
- N3220521R4096
About this file
This document contains a contractor price breakdown for Category A items required for the USNS Arctic mid-term availability. The contractor price breakdown lists over one thousand line items across various categories including general requirements, hull structure, machinery and propulsion, electrical, communications and navigation aids, auxiliary systems, outfitting and habitability, heating ventilation and air conditioning, drydocking, and underway replenishment gear. The line items describe specific maintenance, repair, and overhaul requirements for equipment and systems aboard the USNS Arctic, such as replacing deck machinery, overhauling lube oil pumps, replacing stuffing tubes, inspecting firefighting and breathing systems, cleaning ventilation ducts, conducting ultra sonic testing, and refurbishing saddle winches and UNREP station components. The related federal contract opportunity notice indicates the mid-term availability for the USNS Arctic is scheduled to commence on or about 18 July 2021, and is being solicited by the Department of the Navy Military Sealift Command under solicitation number N3220521R4096.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q and A 2.docx | DOCX document | |
| Q and A 3.docx | DOCX document | |
| N3220521R4096 USNS ARCTIC 2021 SOLICITATION Amended.docx | DOCX document | |
| Q and A 4.docx | DOCX document | |
| J - 7 MSC Ship Repair Facility Survey.doc | DOC document | |
| J - 8 Request for Spec Clarification.doc | DOC document | |
| J - 12 Past Performance Data.doc | DOC document | |
| J - 13 PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| J - 9 Disclosure of Lobbying Activities SF-LLL.doc | DOC document | |
| N3220521R4096 USNS ARCTIC 2021 SOLICITATION.docx | DOCX document | |
| J - 4 GFM LIST USNS ARCTIC FY 21 MTA.xlsx | XLSX spreadsheet | |
| J - 11 Dry Dock Evaluation Form.docx | DOCX document | |
| J - 10 Interport Differential - Arctic Nov MTA 2018.docx | DOCX document | |
| J - 3 Category B Items ARCTIC.xls | XLS spreadsheet | |
| J - 14 Technical Data Non-Disclosure.docx | DOCX document | |
| SYNOPSIS N3220521R4096 USNS ARCTIC.docx | DOCX document | |
| SOURCES SOUGHT FOR USNS ARCTIC MTA 2021.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | Intent, Scope, General Conditions and Definitions | - 0 | $ - 0 | $0 | ||||||||
| 002 | Technical and Manufacturer's Representative | - 0 | $ - 0 | $0 | ||||||||
| 003 | Approach, Berth, and Mooring Requirements | - 0 | $ - 0 | $0 | ||||||||
| 004 | Testing and Quality Assurance | - 0 | $ - 0 | $0 | ||||||||
| 005 | Electrical Safety Procedure Requirements | - 0 | $ - 0 | $0 | ||||||||
| 006 | Heavy Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 007 | Cold Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 010 | Furnish Office for Office Management Team | - 0 | $ - 0 | $0 | ||||||||
| 011 | Furnish General Services | - 0 | $ - 0 | $0 | ||||||||
| 012 | Telephone Services | - 0 | $ - 0 | $0 | ||||||||
| 013 | Project Planning and Production Status Monitiring Reports | - 0 | $ - 0 | $0 | ||||||||
| 014 | Preparation of Weight and Moment Report | - 0 | $ - 0 | $0 | ||||||||
| 015 | Integrated Logistics and GFM Support Requirements | - 0 | $ - 0 | $0 | ||||||||
| 016 | Fire Protection and Ship's Safety Program | - 0 | $ - 0 | $0 | ||||||||
| 017 | Handling Ships Stores | - 0 | $ - 0 | $0 | ||||||||
| 018 | Delivery and Re-Delivery of the Vessel | - 0 | $ - 0 | $0 | ||||||||
| 019 | Shipboard Access and Security | - 0 | $ - 0 | $0 | ||||||||
| 020 | Gas Free Certificates | - 0 | $ - 0 | $0 | ||||||||
| 021 | Clean and Gas Free Tanks, Voids, Cofferdams and Spaces | - 0 | $ - 0 | $0 | ||||||||
| 022 | Dock Trials and Sea Trial | - 0 | $ - 0 | $0 | ||||||||
| 023 | Hazardous Waste Disposal at a Contractor's Facility | - 0 | $ - 0 | $0 | ||||||||
| 024 | Phyiscal Security at Private Contractor's Facility | - 0 | $ - 0 | $0 | ||||||||
| 100 | HULL STRUCTURE | |||||||||||
| 101 | Replace Deck Nchinery Shop Overhead (ABS OSR) | - 0 | $ - 0 | $0 | ||||||||
| 102 | Reserved | - 0 | $ - 0 | $0 | ||||||||
| 103 | 01 Deck Tie Down Replacement (VR) | - 0 | $ - 0 | $0 | ||||||||
| 104 | Replace/Repair Top Side Steel (VR) | - 0 | $ - 0 | $0 | ||||||||
| 105 | Elevator Seven Pit Steel Replacement | - 0 | $ - 0 | $0 | ||||||||
| 200 | MACHINERY, PROPULSION | |||||||||||
| 201 | Reserved | - 0 | $ - 0 | $0 | ||||||||
| 202 | Overhaul Attached Lube Oil Pumps | - 0 | $ - 0 | $0 | ||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | Equipment Stuffing Tube replacement (VRs) | - 0 | $ - 0 | $0 | ||||||||
| 400 | COMMUNICATION AND NAVIGATIONAL AIDS | |||||||||||
| 401 | GMDSS Radio Safety Survey and Inspection | - 0 | $ - 0 | $0 | ||||||||
| 402 | Navigation Equipment MTA Service | - 0 | $ - 0 | $0 | ||||||||
| 403 | VDR Annual Inspection | - 0 | $ - 0 | $0 | ||||||||
| 404 | Ship Wide Surveillance System repairs (CASREP) | - 0 | $ - 0 | $0 | ||||||||
| 500 | MACHINERY, AUXILIARY SYSTEMS | |||||||||||
| 501 | Fire Fighting Systems Equipment Inspection | - 0 | $ - 0 | $0 | ||||||||
| 502 | SCBA Compressor Inspection | - 0 | $ - 0 | $0 | ||||||||
| 503 | SCBA Mask Inspection and Certification | - 0 | $ - 0 | $0 | ||||||||
| 504 | Reserved | - 0 | $ - 0 | $0 | ||||||||
| 506 | Number One SSDG Saltwater Strainer Installation (CASREP) | - 0 | $ - 0 | $0 | ||||||||
| 507 | Number 5 SSDG 40000 Hour Overhaul | - 0 | $ - 0 | $0 | ||||||||
| 513 | Replace 100 Feet of Piping | - 0 | $ - 0 | $0 | ||||||||
| 600 | OUTFIT, FURNISHINGS AND HABITABILITY | |||||||||||
| 601 | Immersion Suit Inspection and Certification | - 0 | $ - 0 | $0 | ||||||||
| 602 | Life Raft Inspection and Certification | - 0 | $ - 0 | $0 | ||||||||
| 603 | Shower Deck Covering Replacement | |||||||||||
| 604 | Interior CPC/PRC Deck Covering Replacement | - 0 | $ - 0 | $0 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | Habitability Spaces Vent Systems Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 802 | Ammunition Magazine Ventilation System Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 803 | External Ventilation Duct Survey and Repair | - 0 | $ - 0 | $0 | ||||||||
| 804 | Interior Ventilation Intake Air Pre-Filter Frame Housings | - 0 | $ - 0 | $0 | ||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 911 | Ultra Sonic Testing | - 0 | $ - 0 | $0 | ||||||||
| 958 | Propeller Polish and Underwater Hull Inspection (PMIA) | - 0 | $ - 0 | $0 | ||||||||
| 1000 | UNREP GEAR | |||||||||||
| 1001 | Saddle Winch and Foundation Refurbishment | - 0 | $ - 0 | $0 | ||||||||
| 1002 | Fairlead Sheave refurbishment | - 0 | $ - 0 | $0 | ||||||||
| 1003 | Replace UNREP Station Winch Booth Windows | - 0 | $ - 0 | $0 | ||||||||
| 1004 | Station Five Trolley Stowage Arm Repair | - 0 | $ - 0 | $0 | ||||||||
| 1005 | Station Five and Six Topping Winch Repair | - 0 | $ - 0 | $0 |
&LUSNS ARCTIC (T-AOE 8)&CCONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS&RN32205-19-R-6012
&CATTACHMENT J-2
File details come from the government source that posted it. Updated .