N3220521R40090002.docx

DOCX document 62 KB Posted

Attached to
USNS JOHN LENTHALL FY22 Regular Overhaul/Dry-Docking (ROH/DD)
Solicitation number
N3220521R4009
Issued by

About this file

This document is a solicitation for a Regular Overhaul/Dry-Docking (ROH/DD) of the USNS JOHN LENTHALL (T-AO 189) to be performed by the Military Sealift Command. The solicitation requires the contractor to prepare for and accomplish various work items for the ROH/DD at their shipyard facility on the East/Gulf Coast of the United States. Key work items include structural steel repairs, machinery repairs and overhauls, electrical work, communications and navigation equipment services, auxiliary machinery services, drydocking, and underway replenishment equipment refurbishment. The period of performance is 91 calendar days starting on or around March 28, 2022. Pricing shall be provided on a firm-fixed-price basis for the base work items and optional work items that may be exercised. The solicitation closes on [date] and award is expected on or around [date].

View the file

Other files

File Type Posted
J-2 Category A Items Rev B.xlsx XLSX spreadsheet
21R4009 - Amendment 0001.docx DOCX document
J-8 Request for Clarification.pdf PDF
J-12 Past Performance Data.pdf PDF
J-11 Dry Dock Evaluation Form.pdf PDF
21R4009 JA Redacted.pdf PDF
J-4 Government Furnished Material List.pdf PDF
J-2 Category A Items.xlsx XLSX spreadsheet
J-10 Interport Differential.pdf PDF
N3220521R4009.docx DOCX document
J-14 Technical Non-Disclosure Agreement (NDA).docx.pdf PDF
J-9 Disclosure of Lobbying Activities (SF-LLL).pdf PDF
J-3 Category B Items.xlsx XLSX spreadsheet
CDRLs.zip ZIP file
J-7 MSC Repair Facility Survey.pdf PDF
J-13 PAST PERFORMANCE QUESTIONNAIRE.docx.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220521R4009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "A" WIs

FFP

Prepare for and accomplish the ROH/DD of the USNS JOHN LENTHALL (T-AO 189) Total Category "A" WIs $_____________

Proposed unit price per KWh of electrical shore power $_____ IAW WI 0011, 7.1.1.4 Proposed unit price per gallon of potable water $______ IAW WI 0011, 7.1.3.2 Proposed unit price per gallon of distilled water $______ IAW WI 0011, 7.1.4.2 Proposed unit price per gallon of bilge water removal $______ IAW WI 0011, 7.1.19.3 Proposed unit price per crane usage $______ IAW WI 0011, 7.1.25.1 Proposed Hazardous Waste handling fee rate IAW WI 0023, 7.4.3. ______%

CDRLs FOR CLINs INCLUDING OPTION CLINs, IF EXERCISED:

The data to be furnished hereunder shall be prepared and submitted IAW the CDRL, DD Form 1423, Exhibit A, attached hereto. The CDRLs form a part of the schedule of this solicitation.

SEE PARAGRAPH 1.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

AGR and ODC

AGR

(10,000) man-hours @ $________ per man-hour = $_____________

ODC

Base $1,500,000.00

Proposed G&A Rate _______________% Subtotal: $_____________

Proposed Profit Rate _______________% Subtotal: $_____________

SEE PARAGRAPH 2, 3, AND 4.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0025

WI 0025 - Physical Security at Private Contractor's Facility in FPCON Charlie - Delta

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

SEE PARAGRAPH 5.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0030

WI 0030 - Continuation of Services

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 026

WI 026 - Vessel Final Cleaning

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 101

WI 101 - Structual Steel Repairs

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 501

WI 501 - Misc Piping Replacement

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0951

WI 951 - Docking and Undocking

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 967

WI 967 - Shaft Alignment and Bearing Reaction Checks

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0009 $______________

The contractor shall enter the total proposed price of all CLINs.

Section B, Price Schedule, detailed information

1. Attachment J-2, Category “A” WIs, provides a WI breakdown of CLIN 0001 pricing.

2. AGR and ODC

a. This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated during the contract. Changes are inherent to vessel repair contracts and should be expected by Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blastingTank cleaning
WeldingMachinists (inside and outside)
BurningBrazing
CarpentryElectrical work
Electronic workShipfitting
LaggingPainting
BoilermakingPipefitting
Sheetmetal workEngineering
RiggingStaging/scaffolding
General laborFire Watch

b. Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:

TestingQuality Assurance
PlanningCleaning (except tank cleaning)
Material handling & warehousingSecurity
SurveyingAdministration
TransportationPurchasing staff
LoftingOther indirect support
Supervision

c. Consumable materials are goods used in the ordinary course of work performance that do not become an integral part of the repaired vessel (e.g., office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, paint buckets, paint brushes, protective clothing). Consumable material shall be included in the contractor's FBLR and not separately priced.

d. The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The ACO will apply these rates to the ODCs for each CCO when it is negotiated and settled.

e. The base cost stated in this CLIN does not include profit or G&A rates.

f. This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.

3. AGR details.

a. The Government may utilize CLIN 0002 for, and not limited to, man-hours generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI. This work may consist of supplemental, emergent, or new work. AGR does not include work performed pursuant to DFARS 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 AGR man-hours, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned WIs, to any other Government contract, or to any other work in progress for the Government. Work under this CLIN may coincide with ODC, and therefore will be performed concurrently.

b. As a result of a discrepancy found between the WI and the current conditions or a needed repair found during the open and inspect phase of the WI, the contractor may submit a CFR to the ACO and the PPE. As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders AGR pursuant to this CLIN, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the ACO. The contractor's failure to submit its proposal within the three (3) day period, or such extended period of time as may be granted, may be considered a failure of the parties to negotiate a fair and reasonable price for the AGR and will permit the ACO to take any of the three (3) options set forth in subparagraph “d” below. AGR proposals shall be priced using the FBLR set forth in Section B, CLIN 0002. The rate established in CLIN 0002 will be used in evaluating the contractor's proposal and for negotiating changes. As part of the contractor’s proposal submission for AGR, the following shall be included:

- FBLR
- Proposed Labor Mix/Categories
- Proposed Man Hours
- Total Proposed AGR

c. Considering FBLRs have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of labor categories and associated man-hours to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) as a result of the mix of labor categories and man-hours, the subsequent AGR price is fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the ACO reserves the right to procure these ODCs utilizing alternative means described in subparagraph “d”, below.

d. Upon receipt of the contractor's price proposal for the AGR the contractor and the ACO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the ACO, the ACO reserves the right to:

1) Have the work performed by the Government;

2) Issue a unilateral modification; or

3) Cancel the requirement.

e. The contractor knowingly and voluntarily waives all claims against the Government and/or other third-party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing the AGR at the contractor's facility. Furthermore, in cases described in subparagraphs “d.1” and “d.2” above, the contractor waives any right to claims of interference under the DFARS 252.217-7011 - Access to Vessels.

f. The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN 0001) does not include any amount for AGR (CLIN 0002). Settlement of AGR (CLIN 0002) will be for the purpose of providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the ACO. The Contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled CCO and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0009 at contract completion shall be de-obligated.

4. ODC details.

a. The Government may utilize CLIN 0002 for and not limited to, material and equipment generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI. This work may consist of supplemental, emergent, or new work. ODC does not include work performed pursuant to DFARS 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 ODC, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned WIs, to any other Government contract, or to any other work in progress for the Government. Work under this CLIN may coincide with AGR, and therefore will be performed concurrently.

b. As a result of a discrepancy found between the WI and the current conditions or a needed repair found during the open and inspect phase of the WI, the contractor may submit a CFR to the ACO and the PPE. As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders ODC pursuant to this CLIN, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the ACO. The contractor's failure to submit its proposal within the three (3) day period, or such extended period of time, may be considered a failure of the parties to negotiate a fair and reasonable price for the ODC and will permit the ACO to take any of the three options set forth in subparagraph “e” below. As part of the contractor’s proposal submission for ODCs, the following shall be included:

MaterialEquipment
-Part number- Part number
-Order quantity- Order quantity
-Unit price- Unit price
-Total price- Total price

Other Direct Costs not captured above

- Travel

- Per diem (lodging, M&IE daily rates)

- Subcontractor Proposal Breakdown shall include but not be limited to, Material (Part number, Order Quantity, Unit Price, and Total Price), equipment (Part Number, Order Quantity, Unit Price, and Total Price), labor (FBLR, Proposed Labor Mix/Categories, and Proposed Manhours), and ODC (Travel and Per Diem)

The G&A and profit rates proposed shall be the same as the rates provided under CLIN 0002.

c. The contractor shall demonstrate due diligence in the assessment, evaluation, and determination resulting in the proposed utilization of other than local specialized labor resources. Only with ACO approval to proceed will a contractor, technical representative, or subcontractor be reimbursed for reasonable per diem costs (transportation, travel expenses, lodging, meals, and incidental expenses) required in connection with the associated change order. Per diem costs are considered reasonable, allowable, and reimbursable only to the extent that they do not exceed the allowed per diem rate in effect at the time of travel as set forth in the JTR.

d. Considering G&A and profit rates have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of ODCs proposed to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) the price is fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the ACO reserves the right to procure these ODCs utilizing alternative means described in subparagraph “e”, below.

e. Upon receipt of the contractor's price proposal for the AGR the contractor and the ACO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the ACO, the ACO reserves the right to:

1) Have the work performed by the Government;

2) Issue a unilateral modification; or

3) Cancel the requirement.

f. The contractor knowingly and voluntarily waives all claims against the Government and/or other third-party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing this work at the contractor's facility. Furthermore, in cases described in subparagraphs “e.1” and “e.2” above, the contractor waives any right to claims of interference under the DFARS 252.217-7011 - Access to Vessels.

g. The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN 0001) does not include any amount for the ODC (CLIN 0002). Settlement of ODC (CLIN 0002) will be for the purpose of providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the ACO. The contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled CCO and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0009 at contract completion shall be de-obligated.

5. Attachment J-3, Category “B” WIs, provides a WI breakdown of CLIN 0003 through 0009 pricing.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

ACRONYM TABLE

ABIH
American Board of Industrial Hygiene
ABR
Agreement for Boat Repair
ABS
American Bureau of Shipping
ACO
Administrative Contracting Officer
AGR
Additional Government Requirements
AIHA
American Industrial Hygiene Association
ALT
Alternate
AMT
Amount
BLDG
Building
CCO
Contract Change Order
CD
Compact Disc
CDRL
Contract Data Requirements List
CD-ROM
Compact Disc Read-Only Memory
CFM
Contractor Furnished Material
CFP
Contractor Furnished Property
CFR
Condition Found Report
CHENG
Chief Engineer
CFR
Code of Federal Regulations
CIH
Certified Industrial Hygienist
CLIN
Contract Line Item Number

CONUS

CPARS

Contiguous United States Contractor Performance Assessment Reporting System

DBIDS
Defense Biometric Identification Systems
DFARS
Defense Federal Acquisition Regulation Supplement
DOD
Department of Defense
DOD SAFE
Department of Defense Secure Access File Exchange
DON
Department of the Navy
EMAIL
Electronic Mail
ESRS
Electronic Subcontract Report System
FAPIIS
Federal Awardee Performance and Integrity Information System
FAR
Federal Acquisition Regulation
FBLR
Fully-Burdened Labor Rate
F/CC
Fibers Per Cubic Centimeter
FPCON
Force Protection Condition
FTR
Federal Travel Regulations
G&A
General and Administrative
GFI-TD
Government Furnished Information – Technical Data
GFM
Government Furnished Material
GFP
Government Furnished Property
GPE
Governmentwide Point of Entry
IAW
In Accordance With
ID
Identification
ISO
International Organization for Standardization
JTR
Joint Travel Regulations
KO
Contracting Officer
KWh
Kilowatt Hour
LLTM
Long Lead Time Material
LPTA
Lowest Price Technically Acceptable
M&IE
Meals and Incidental Expenses
MSC
Military Sealift Command
MSCREP
Military Sealift Command Representative
MM
Millimeter
MSRA
Master Ship Repair Agreement
MTA
Mid-Term Availability
N/A
Not Applicable
NCACS
Navy Commercial Access Control System
NDA
Non-Disclosure Agreement
NO
Number
NSP
Not Separately Priced
ODC
Other Direct Costs
PAT
Proficiency in Analytical Testing

PDF

PII

Portable Document Format Personally Identifiable Information

PM
Program Manager
PPE
Principle Port Engineer
PRIME
Prime Contractor
QA
Quality Assurance
QC
Quality Control
REV
Revision
RFC
Request for Specification Clarification
RFP
Request for Proposal
ROH/DD
Regular Overhaul/Dry-Docking
SECNAV
Secretary of the Navy
SF
Standard Form
SUB
Subcontractor
TPSN
Time Phased Sequencing Network
TWA
Time-Weighted Average
USC
United States Code
USCG
United States Coast Guard
USNS
United States Naval Ship
VR
Voyage Repair
WAWF
Wide Area Workflow
WI
Work Item

SCOPE OF WORK

1. The contractor shall prepare for and accomplish the VR, overhaul, or alterations of the USNS JOHN LENTHALL (T-AO 189) as specified herein and IAW the WI package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.

2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):

a. Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.

b. Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR 52.245-1 and DFARS 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004.

c. Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.

d. Using management procedures and systems to identify behind-schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.

e. Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 0013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted IAW the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 0013.

f. Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.

g. Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.

h. Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.

i. Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.

j. Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.

k. Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.

3. Contract work shall be performed by an eligible contractor as defined below.

a. The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.

b. The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall provide industry certifications such as: MSRA, ABR, or ISO Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate its ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award:

1) Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.

2) Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.

3) Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.

4) Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.

5) Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.

6) Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

7) Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.

8) Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.

9) Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number. Disposal records which indicate type of material, date, and place of disposal.

10) Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:

· Pier, with services in place, accessible to the CLASS size ship for berthing

· Structural Shop

· Machine Shop

· Pipe Shop

· Electrical/Electronic Shop

· Carpentry Shop

· Rigging Equipment

· Dry-dock – when required for docking of vessel in performance of the specification

11) Agreements. To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate its ability to obtain required resources.

c. The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.

4. Asbestos removal requirements.

a. During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos-containing products. This requirement applies to each instance of asbestos removal or disturbance.

b. The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, state, and local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.

c. The latest change to the Federal, state, and local regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the OSHA Action level airborne concentration (currently 0.1 f/cc of air).

d. During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.

e. After removal or disturbance is complete, the areas within the removal boundary shall not be released for re-occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.

f. In all respects, the performance of air sampling and analysis shall be performed IAW the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:

1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four (4) hours.

2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.

3) Air sampling shall be performed by a person competent in sampling procedures and overseen by a CIH by the ABIH.

4) Laboratory analysis of samples shall be performed by a participant in the AIHA PAT Program rated proficient for asbestos and air.

g. Personal sampling shall be conducted using breathing zone air samples which are representative of the 8-hour TWA exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).

h. The contractor agrees to indemnify MSC for any fines assessed by Federal, state, or local agencies, for the contractor's failure to properly follow applicable regulations.

i. The contractor shall insert this instruction in all subcontracts entered into under this contract.

5. Post-award substitution of any major subcontractor should not be effected unless the proposed substitution is submitted to the KO and official approval is obtained. The post-award substitution or insertion of a second-tier subcontractor will be treated in the same manner as the substitution of a major subcontractor and requires specific approval by the KO.

6. Substitution of key personnel.

a. The contractor agrees to assign to this contract those persons identified as key personnel who are necessary to fulfill the requirements of this contract and whose resumes were submitted with the proposal. No substitution of key personnel shall be made except IAW these instructions.

b. All proposed substitutions must be submitted, in writing, at least seven (7) days in advance of the proposed substitutions to the KO and must provide the information required by paragraph “c” below.

c. All requests for substitution must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information as requested by the KO. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person to be replaced. The KO or his authorized representative will evaluate such requests and promptly notify the contractor of the approval or disapproval thereof.

7. It is anticipated the ship will arrive at the contractor’s yard on or about 28 MAR 2022. All work shall be completed in no more than 91 calendar days from the actual start date designated by the Government at the time of contract award.

8. The place of performance for this contract shall be the contractor’s facility. Due to operational commitments, the location shall be East/Gulf Coast.

Table 1: List of WIs:

Item Number
Title
Category
SECTION 0000
GENERAL SERVICES AND REQUIREMENTS
0001
SCOPE GENERAL REQUIREMENTS AND DEFINITIONS REV 16Jul18
NSP
0002
TECHNICAL AND MANUFACTURERS REPRESENTATIVES REV 01May18
NSP
0003
APPROACH BERTH AND MOORING REQUIREMENTS REV 12Feb20
NSP
0004
TESTING AND QUALITY ASSURANCE REV 08Nov17
NSP
0005
ELECTRICAL SAFETY PROCEDURE REQUIREMENTS REV 03Aug19
NSP
0006
HEAVY WEATHER PLAN REV 03Aug19
NSP
0007
COLD WEATHER PLAN REV 03Aug19
NSP
0010
FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) REV 11May20
A
0011
GENERAL SERVICES FOR THE SHIP T-AO REV 02May20
A
0012
INFORMATION TECHNOLOGY SERVICES REV 7Aug19
A
0013
PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS REV 25Feb20
A
0014
PREPARATION OF WEIGHT AND MOMENT REPORT
A
0015
INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS
A
0016
FIRE PROTECTION AND SHIPS SAFETY PROGRAM REV 28Sep17
A
0017
HANDLING SHIPS STORES, REV FEB 14
A
0018
DELIVERY AND REDELIVERY OF THE VESSEL REV 13Feb20
A
0019
SHIPBOARD ACCESS AND SECURITY REV 28Nov18
A
0020
GAS FREE CERTIFICATES REV 03Aug19
A
0021
CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS, AND SPACES REV 03Aug19
A
0022
MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS REV 13Feb20
A
0023
HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY REV 03Aug19
A
0024
PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY REV 28Nov18
NSP
0025
PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY REV 28Nov18
B
0026
VESSEL FINAL CLEANING REV A REV 11May20
B
0030
CONTINUATION OF SERVICES REV 04Jun20 (2)
B
0090
DAILY COVID-19 PREVENTION AND CONTROL SERVICES REV M
A
SECTION 0100
HULL AND STRUCTURAL
0101
Structural Steel Repairs
B
0102
TANK DECK OVERHEAD PRESERVATION
A
0103
TANK DECK PEDESTRIAN NON SKID
A
0104
BALLAST TANK PRESERVATION FOREPEAK
A
0106
Weather Door Steel Repairs
A
0107
CARGO TIE DOWN REPLACEMENT
A
0108
PUMP ROOM BILGE POWER TOOL CLEAN AND RECOAT
A
0109
EXPANSION JOINT REPLACEMENT
A
0110
Stability Test
A
0112
BULWARK REPAIRS
A
0113
MAIN MAST PRESERVATION
A
SECTION 0200
PROPULSION MACHINERY
0201
Main Engine 24K Overhaul Rigging and Shipping Supp
A
0207
STBD MAIN ENGINE CLUTCH AND COUPLING MAINTENANCE (5 YR) (SCSI)
A
0208
MAIN ENGINE SHAFT BRAKE
A
0211
MAIN REDUCTION GEAR INSPECTION - CINCINNATI
A
0215
MAIN ENGINE LOCAL CONTROL PANEL SERVICE (3 YR)(SCSI)
A
0216
RENEW MAIN ENGINE EXHAUST STACK RESILIENT MOUNTS
A
0251
WOODWARD GOVERNORS (20K HRS) (SCSI)
A
0254
THRUST AND LINE SHAFT BEARING INSPECTION (5 YR)(SCSI)
A
SECTION 0300
ELECTRICAL
0301
ANNUAL CARGO CONSOLE GROOM
A
0303
MOTOR REPAIRS
A
0304
PTO SERVICE - COGENEL (1 YR)
A
0308
OVERHAUL AND TEST CIRCUIT BREAKERS (10 YR)
A
0310
UPS, BATTERIES - REPLACE (5 YR)
A
0353
THERMOGRAPHIC SURVEY (1 YR)
A
SECTION 0400
COMMUNICATION AND NAVIGATION
0403
OE-82 UHF SATCOM ANTENNA OVERHAUL (3 YR)
A
0404
DOPPLER SPEED LOG MAINTENANCE (1 YR)
A
0405
Hand held radio transceiver radio system modernization_T-AO_04.11.2018
A
0408
WIND SPEED INDICATING AND MEASURING SYSTEM CERTIFCIATION (3 YR)
A
0451
ANNUAL RADAR SERVICE
A
0452
ANNUAL ECDIS SERVICE (SCSI)
A
0453
ANNUAL GYRO SERVICE
A
0454
ANNUAL VDR RECERTIFICATION
A
0455
ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION
A
0456
MAGNETIC COMPASS SERVICE (2 YR)
A
0459
FATHOMETER MAINTENANCE
A
0460
ANNUAL INSPECTION OF MANUALLY OPERATED ALARMS
A
SECTION 0500
AUXILIARY MACHINERY
0501
MISC PIPING REPLACE
B
0502
MISC. PUMP OVERHAUL
A
0503
PTO Clutch and Coupling Overhaul
A
0504
SSDG No. 4 Rigging and Shipping Support
A
0505
CT WINCH OVHL
A
0506
DECK DRAIN PIPING REPLACEMENT
A
0507
REFRIGERATION & AIR CONDITIONING SYSTEMS GROOM AND REPAIR
A
0508
AC SYSTEM CHILLER #2 REPLACEMENT
A
0510
SSDG ENGINE TURBOCHARGER MAINTENANCE
A
0511
Fabricate New CPP Jumper Hoses
A
0512
AUXILIARY BOILER SURVEY AND HYDRO - CLAYTON (2.5 YR)
A
0513
Tank Deck Drain Piping Replacement
A
0518
FUEL OILLUBE OIL PURIFIER SERVICE - WESTFALIA (2.5 YR)
A
0520
SHIPS SERVICE AIR COMPRESSOR SERVICE
A
0522
START AIR COMPRESSOR OVERHAUL (4 YR)
A
0527
EMERGENCY DIESEL ENGINE MAINTENANCE (5 YR) (SCSI)
A
0530
ENGINE ROOM OWS SERVICE AND OCM CERTIFICATION (SCSI)
A
0540
INCINERATOR SERVICE (5 YR)
A
0552
HOSE REPLACEMENT (5 YR)
A
0553
PRESSURE VESSELS AND RELIEF VALVES (5 YR)
A
0555
INSPECT, WEIGHT TEST AND CERTIFY MACHINERY SPACE CRANES (5 YR)
A
0560
PERSONNEL ELEVATOR INSPECTION AND TEST (5 YR)
A
0561
GAUGE CALIBRATION (1 YR)
A
0562
SCBA ANNUAL INSPECTION (1 YR)
A
0563
SCBA AIR COMPRESSOR AND FILLING STATION INSPECTION AND MAINTENANCE (1 YR)
A
0565
FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST
A
0567
FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR)(SCSI)
A
0569
FIRE AND SMOKE DETECTION AND ALARM SYSTEM (1 YR)(SCSI)
A
0570
PORTABLE FIRE EXTINGUISHER SERVICE (1 YR)
A
0571
FIRE AND SMOKE DAMPER SERVICE (1 YR)
A
0572
DEEP FAT FRYER AND RANGE HOOD FIRE EXTINGUISHING SYSTEM (1 YR) (SCSI)
A
0573
FIRE HOSES (1 YR)
A
0574
FIRE DOORS AND SHUTTERS (1 YR)
A
SECTION 0600
HABITABILITY OUTFITTING AND FURNISHINGS
0601
GALLEY EQUIPMENT SERVICE (1 YR)
A
0602
LAUNDRY EQUIPMENT SERVICE (1 YR)
A
0603
Removal of Garbage Chute
A
0605
RESCUE BOAT DAVIT REPAIRS
A
0610
SPIDERMAN BASKETS OVERHAUL (1 YR)
A
0611
READY SERVICE LOCKER - OVERHAUL (5 YR)
A
0619
WINDOW REGASKETING AND STEEL REPAIR
A
0652
LIFEBOAT AND DAVIT SERVICE AND INSPECTION (5 YR)
A
0654
RESCUE BOAT AND DAVIT SERVICE (5 YR)
A
0656
ANNUAL LIFERAFT CERTIFICATION
A
0658
ACCOMMODATION LADDER MAINTENANCE AND TESTING (5 YR)
A
0659
PILOT BOARDING AND EMBARKATION LADDERS (5 YR)
A
0662
DEEP FAT FRYER INSPECTION (1 YR)
A
SECTION 0800
HVAC
0804
AIR HANDLER INSPECTIONS AND REPAIRS (QTY 6)
A
0851
ANNUAL GALLEY VENTILATION AND GAYLORD HOOD CLEANING
A
0852
ANNUAL LAUNDRY VENT CLEANING
A
0853
ACCOMODATION VENT CLEANING (5 YR)
A
SECTION 0900
DRYDOCKING
0901
DRYDOCKING AND UNDOCKING THE VESSEL (2.5 YR)
A
0902
PROPULSION SHAFT WEAR DOWN READINGS (2.5 YR)
A
0903
INSPECTION OF BILGE KEELS, BOW VOID & SKEGS
A
0905
SPUR CUTTER REPAIRS (2.5 YR)
A
0906
ZINC ANODE INSPECTION AND REPLACEMENT (2.5 YR)
A
0911
PROPELLER SYSTEM MAINTENANCE (2.5 YR)
A
0912
STERN TUBE SEAL MAINTENANCE (2.5 YR) (SCSI)
A
0915
ROPE GUARD ZINC ANODE REPLACEMENT
A
0951
CAT B DRY DOCKING UNDOCKING VESSEL (SHIP EXTENSION)
B
0953
ANCHORS, CHAINS AND LOCKERS (5 YR)
A
0954
RUDDER AND STERN FRAME EXAMINATION (5 YR)
A
0956
OVERHAULING SEA VALVES (5 YR)
A
0960
UNDERWATER HULL CLEANING AND PAINTING - SPOT BLAST (2.5 YR)
A
0961
FREEBOARD PRESERVATION (2.5 YR)
A
0962
CATHODIC PROTECTION SYSTEM (2.5 YR)
A
0963
SEA CHEST MARINE GROWTH PREVENTION SYSTEM (2.5 YR)
A
0966
SHAFT ALIGNMENT AND BEARING REACTION CHECKS (2.5 YR)
A
0967
Shaft Alignment and Bearing Reaction Checks (Set 3 and 4)
B
SECTION 1000
UNDERWAY REPLENISHMENT EQUIPMENT
1001
ASD FRAME AND FOUNDATION REFURBISHMENT
A
1002
Main Electric Motor and Replenishment Motor Power Cable Replacement
A
1004
SADDLE WINCH BRAKE POWER CABLE REPLACEMENT
A
1005
TENSION TOWER AND OUTHAUL ASD OVERHAUL
A
1006
HAULING WINCH LABRYNTH AND BLOWER SHROUD OVERHAUL
A
1007
OVERHAUL ON STA 3 HIGHLINE MAIN ELECTRIC MOTOR
A
1008
UNREP Station No1 Steel Repairs
A
1009
UNREP Station No2 Steel Repairs
A
1010
UNREP Station No4 Steel Repairs
A
1011
UNREP Station No8 Steel Repairs
A
1050
SLIDING BLOCK CHAIN REPLACEMENT (5 YR)
A
1051
HP AIR RELIEF VALVE INSPECT AND TEST (2YR)
A
1052
CARGO GEAR RENEWAL SURVEY (5 YR)
A

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .