J-3 Category B Items.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- N3220521R4009
About this file
This document contains a solicitation for a Regular Overhaul/Dry-Docking (ROH/DD) of the USNS JOHN LENTHALL (T-AO 189) along with an attached J-3 Category B items spreadsheet. The solicitation is being issued by the Department of the Navy Military Sealift Command and seeks services including structural steel repairs, piping replacement, vessel cleaning, security, and shaft alignment checks. The spreadsheet outlines estimated costs for labor, materials, and subcontracting for various line items such as physical security, project management, and dry docking services up to 15 days. Responses to the solicitation are due under number N3220521R4009. The work will involve overhauling and servicing the USNS JOHN LENTHALL at a private contractor facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3220521R40090002.docx | DOCX document | |
| J-2 Category A Items Rev B.xlsx | XLSX spreadsheet | |
| 21R4009 - Amendment 0001.docx | DOCX document | |
| J-8 Request for Clarification.pdf | ||
| J-12 Past Performance Data.pdf | ||
| J-11 Dry Dock Evaluation Form.pdf | ||
| 21R4009 JA Redacted.pdf | ||
| J-4 Government Furnished Material List.pdf | ||
| J-2 Category A Items.xlsx | XLSX spreadsheet | |
| J-10 Interport Differential.pdf | ||
| N3220521R4009.docx | DOCX document | |
| J-14 Technical Non-Disclosure Agreement (NDA).docx.pdf | ||
| J-9 Disclosure of Lobbying Activities (SF-LLL).pdf | ||
| CDRLs.zip | ZIP file | |
| J-7 MSC Repair Facility Survey.pdf | ||
| J-13 PAST PERFORMANCE QUESTIONNAIRE.docx.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-3 Attachment
| USNS JOHN LENTHALL (T-AO 189) FY22 ROH | ||||||||||||||
| N3220521R4009 | ||||||||||||||
| GENERAL REQUIREMENT | QTY | UI | UNIT PRICE | TOTAL | PRIME CONTRACTOR | SUBCONTRACTOR | MANDATED SUB | OTHER COSTS | ||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL PRICE | |||||
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY REV 28Nov18 | |||||||||||||
| 7.11 | ESTABLISH CONDITION CHARLIE | 1 | DAY | |||||||||||
| 7.11.1 | MAINTAIN CONDITION CHARLIE | 1 | DAY | |||||||||||
| 7.12 | ESTABLISH CONDITION DELTA | 1 | DAY | |||||||||||
| 7.12.1 | MAINTAIN CONDITION DELTA | 1 | DAY | |||||||||||
| WI 025 SUBTOTAL | ||||||||||||||
| 26 | VESSEL FINAL CLEANING REV A REV 11May20 | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | TOTAL PRICE | |||
| 7.1.1 | PRIOR TO REDELIVERY OF THE VESSEL, THE CONTRACTOR SHALL ACCOMPLISH CLEANING REQUIREMENTS ONBOARD THE VESSELUSING REFERENCES 2.1.2 | |||||||||||||
| WI 026 SUBTOTAL | ||||||||||||||
| 030 | CONTINUATION OF SERVICES REV 04JUN20 | QTY | UI | UNIT PRICE | TOTAL | PRIME CONTRACTOR | SUBCONTRACTOR | MANDATED SUB | OTHER COSTS | |||||
| PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL PRICE | |||||||
| 7.1 | OVERHAUL MANAGEMENT TEAM | 15 | DAY | |||||||||||
| 7.2 | GENERAL SERVICES FOR SHIP | 15 | DAY | |||||||||||
| 7.3 | INFORMATION TECHNOLOGY SERVICES | 15 | DAY | |||||||||||
| 7.4 | PROJECT PLANNING AND MONITORING | 15 | DAY | |||||||||||
| 7.5 | FIRE PROTECTION AND SHIP'S SAFETY | 15 | DAY | |||||||||||
| 7.6 | SHIPBOARD ACCESS AND SECURITY | 15 | DAY | |||||||||||
| 7.7 | GAS FREE CERTIFICATES | 15 | DAY | |||||||||||
| WI 030 SUBTOTAL | ||||||||||||||
| 101 | STRUCTUAL STEEL REPAIRS | QTY | UI | UNIT PRICE | TOTAL | PRIME CONTRACTOR | SUBCONTRACTOR | MANDATED SUB | OTHER COSTS | |||||
| PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL PRICE | |||||||
| 7.1.1 | Structual Steel Plate | 10000 | LB | |||||||||||
| 7.1.2 | Rolled structural shapes | 5000 | LB | |||||||||||
| 7.2.1 | 6" long fillet welds | 50 | EA | |||||||||||
| 7.2.2 | 7"-12" long fillet welds | 50 | EA | |||||||||||
| 7.3.1 | Sounding tube striker plates | 25 | EA | |||||||||||
| 7.4.1 | 2" x 2" clad welds | 50 | EA | |||||||||||
| 7.4.2 | 4" x 4" clad welds | 50 | EA | |||||||||||
| 7.4.3 | 6" x 6" clad welds | 50 | EA | |||||||||||
| WI 101 SUBTOTAL | ||||||||||||||
| 501 | MISC PIPING REPLACE | QTY | UI | UNIT PRICE | TOTAL | PRIME CONTRACTOR | SUBCONTRACTOR | MANDATED SUB | OTHER COSTS | |||||
| PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL PRICE | |||||||
| 7.1.1 | Eight inch Schedule 80 steel pipe | 60 | LF | |||||||||||
| 7.1.10 | Three-inch Schedule 40 steel pipe | 80 | LF | |||||||||||
| 7.1.11 | Three inch flanges four bolt 150# flat face, socket welded | 8 | EA | |||||||||||
| 7.1.12 | Three inch 90 degree elbows | 4 | EA | |||||||||||
| 7.1.13 | Two-and-a-half-inch Schedule 40 steel pipe | 80 | LF | |||||||||||
| 7.1.14 | Two and a half inch flanges four bolt 150# flat face, socket welded | 8 | EA | |||||||||||
| 7.1.15 | Two and a half inch 90 degree elbows | 4 | EA | |||||||||||
| 7.1.2 | Eight inch flanges four bolt 150# flat face, socket welded | 8 | EA | |||||||||||
| 7.1.3 | Eight inch 90 degree elbows | 4 | EA | |||||||||||
| 7.1.4 | Six inch Schedule 80 steel pipe. | 80 | LF | |||||||||||
| 7.1.5 | Six inch flanges four bolt 150# flat face, socket welded | 8 | EA | |||||||||||
| 7.1.6 | Six inch 90 degree elbows | 4 | EA | |||||||||||
| 7.1.7 | Five inch Schedule 80 steel pipe | 80 | LF | |||||||||||
| 7.1.8 | Five inch flanges four bolt 150# flat face, socket welded | 8 | EA | |||||||||||
| 7.1.9 | Five inch 90 degree elbows | 4 | EA | |||||||||||
| WI 501 SUBTOTAL | ||||||||||||||
| 951 | CAT B DRY DOCKING UNDOCKING VESSEL (SHIP EXTENSION) | QTY | UI | UNIT PRICE | TOTAL | PRIME CONTRACTOR | SUBCONTRACTOR | MANDATED SUB | OTHER COSTS | |||||
| PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL PRICE | |||||||
| 7.1 | Submit unit price per day up to a maximum of fifteen (15) days to continue all services in accordance with parent item 901 if di | 15 | DAY | |||||||||||
| WI 951 SUBTOTAL | ||||||||||||||
| 967 | Shaft Alignment and Bearing Reaction Checks (Set 3 and 4) | QTY | UI | UNIT PRICE | TOTAL | PRIME CONTRACTOR | SUBCONTRACTOR | MANDATED SUB | OTHER COSTS | |||||
| PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL PRICE | |||||||
| 7.8.c | Shaft Alignment and Bearing Reaction Check No. 3 | 1 | EA | |||||||||||
| 7.8.d | Shaft Alignment and Bearing Reaction Check No. 4 | 1 | EA | |||||||||||
| WI 967 SUBTOTAL | ||||||||||||||
| TOTAL |