J-3 Category B Items (Rev 1).xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- USNS LARAMIE FY21 ROH/DD
- Solicitation number
- N3220520R4001
About this file
This document provides a price breakdown template for Category B optional items for the FY 2021 Regular Overhaul/Dry-Docking of the USNS LARAMIE (T-AO 203) under Solicitation N3220520R4001 issued by the Department of the Navy Military Sealift Command.
The template requires contractors to list pricing details for various Category B optional items including physical security, vessel cleaning, continuation of services such as management teams and telephone services, steel replacement and repairs, zinc anode replacement, and additional drydocking days. Pricing is to be broken down by labor hours and materials for both prime and subcontractors. Labor rates and unit pricing are also requested where applicable. The selected contractor will be expected to provide the listed optional Category B services if ordered in addition to the base requirements of the ROH/DD solicitation.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| USNS LARAMIE (T-AO 203) FY 21 ROH/DD | ||||||||||||||||
| Contractor's price will be broken down for each item of the specification, as follows: | ||||||||||||||||
| CATEGORY “B” ITEMS | ||||||||||||||||
| GENERAL REQUIREMENT | Price / Tank | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | ||||||
| CATEGORY "B" | ||||||||||||||||
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION BRAVO-DELTA | |||||||||||||||
| 7.11 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 1 | DAY | |||||||||||||
| 7.12 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | 1 | DAY | |||||||||||||
| 7.11 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 10 | DAY | |||||||||||||
| 7.12 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | 10 | DAY | |||||||||||||
| WI 025 SUBTOTAL |
026 VESSEL FINAL CLEANING
| 030 | CONTINUATION OF SERVICES | ||
| 7.1 | Overhaul Management Team | 15 | DAY |
| 7.2 | General Services For The Ship | 15 | DAY |
| 7.3 | Telephone Services | 15 | DAY |
| 7.4 | Project Planning and Monitoring | 15 | DAY |
| 7.5 | Fire Protection and Ship's Safety | 15 | DAY |
| 7.6 | Delivery, Care and Redelivery of the Vessel | 15 | DAY |
| 7.7 | Shipboard Access and Security | 15 | DAY |
| 7.8 | Gas Free Certificates | 15 | DAY |
| WI 030 SUBTOTAL | |||
| 107 | STEEL REPLACEMENT | ||
| 7.2.1 | 10,000 pounds of steel plate | 10,000 | lbs |
| 7.2.2 | 5,000 pounds of rolled structural shapes | 5,000 | lbs |
| 7.3.1 | Vee out and weld 6 inch long or less crack | 50 | |
| 7.3.2 | Vee out and weld 7-12 inch long crack | 50 | |
| 7.3.3 | Clad weld 1 inch diameter bye 3/8 inch deep pit | 50 | |
| 7.4.1 | Replace Sounding Tube Striker Plate | 20 | each |
| WI 107 SUBTOTAL | ||
| 112 | Zinc Anode Fastener Replacement | |
| 7.2 | Weld new studs in place | 500 |
| WI 1123 SUBTOTAL | |||
| 913 | DRYDOCKING AND UNDOCKING SHIP – ADDITIONAL DAYS | ||
| 7.1 | 7.1. Submit unit price per day up to a maximum of FIFTEEN (15) days to continue all services in accordance with parent item if directed | 15 | DAY |
| WI 913 SUBTOTAL |
TOTALS Total CAT "B" $0.00
| &14USNS LARAMIE (T-AO 203) | &14CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "B" ITEMS | &14N32205-20-R-4001 |
ATTACHMENT J-3
File details come from the government source that posted it. Updated .