J-2 Category A Items.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- USNS LARAMIE FY21 ROH/DD
- Solicitation number
- N3220520R4001
About this file
This document contains a contractor price breakdown for Category A items required for the FY21 Regular Overhaul/Dry-Docking of the USNS LARAMIE (T-AO 203). The Military Sealift Command of the Department of the Navy is soliciting bids for over 1,000 line items across various ship systems and components requiring repair, replacement, inspection, testing or other maintenance work. Key areas include hull and structural work, main propulsion overhauls, electrical repairs, communication and navigation equipment servicing, auxiliary machinery maintenance, habitability upgrades, ventilation cleaning, drydocking services and underway replenishment gear refurbishment. Offerors should provide pricing for prime contractor labor and materials as well as any required subcontractor or technical representative inputs. Daily COVID-19 prevention services are also specified. The solicitation number for this opportunity is N3220520R4001.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| USNS LARAMIE (T-AO 203) FY21 ROH/DD | ||||||||||||
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep/Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 006 | HEAVY WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 007 | COLD WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | |||||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORTS | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL, REV MAY 16 | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 090 | DAILY COVID 19 PREVENTION AND CONTROL SERVICES | |||||||||||
| 100 | HULL AND STRUCTURAL ITEMS | |||||||||||
| 101 | LIIFEBOAT #3 GRIPE BOLLARD REPLACEMENT | |||||||||||
| 102 | SUPERSTRUCTURE BLAST AND PAINT | |||||||||||
| 103 | FABRICATE CHAIN PIPE COVERS | |||||||||||
| 105 | VENTILATION TRUNK STEEL REPAIRS, 01 AND 02 LEVEL | |||||||||||
| 107 | FIXED PORT LIGHT REPAIRS | |||||||||||
| 109 | ACCOM LADDER REPPLACEMENT AND WEIGHT TEST | |||||||||||
| 155 | INSPECTION OF PV VALVES | |||||||||||
| 158 | TANK PRESERVATION | |||||||||||
| 197 | CENTRAL FRESH WATER ROOM STEEL RENEWAL | |||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 203 | OIL MIST DETECTOR CALIBRATION AND SERVICE | |||||||||||
| 204 | PTO CLUTCH OVERHAUL | |||||||||||
| 208 | PROPULSION SHAFT BRAKE OVERHAUL | |||||||||||
| 224 | MAIN ENGINE 24,000 HOUR OVERHAUL | |||||||||||
| 252 | AIN REDUCTION GEAR INSPECTION (5 YR) | |||||||||||
| 254 | THRUST AND LINE SHAFT BEARING INSPECTION (5 YR) | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | CARGO PUMP MOTOR REWIND | |||||||||||
| 302 | PTO GENERATOR GROOM | |||||||||||
| 303 | ANNUAL GENERATOR MAINTENANCE | |||||||||||
| 304 | AIR BREAKER PAINTENANCE | |||||||||||
| 351 | SWITCHBOSRD CLEANING | |||||||||||
| 352 | MOTOR CONTROL CENTER CLEANING | |||||||||||
| 353 | THERMOGRAPHIC SURVEY | |||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 401 | OE-82 UHF SATCOM ANTENA OVERHAUL | |||||||||||
| 406 | URT-23 AND URR-2368 HF SET GROOM | |||||||||||
| 407 | UHF SATCOM AND LOS TRANSCEIVER GROOM | |||||||||||
| 408 | DOPPLER SPEED LOG MAINTENANCE | |||||||||||
| 409 | FATHOMETER DUAL TRANSDUCER MAINTENANCE | |||||||||||
| 411 | AVAYA TELEPHONE SYSTEM GROOM | |||||||||||
| 450 | ECDIS & RADAR REPLACEMENT | |||||||||||
| 451 | ANNUAL RADAR SERVICE | |||||||||||
| 452 | ANNUAL ECDIS SERVICE | |||||||||||
| 453 | ANNUAL GYRO SERVICE | |||||||||||
| 454 | ANNUAL VDR RECERTIFICATION | |||||||||||
| 455 | ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION | |||||||||||
| 456 | MAGNETIC COMPASS SERVICE (2-YR) |
| 500 | AUXILIARY MACHINERY |
| 503 | ATLAS INCINERATOR TROUBLESHOOT AND REPAIR |
| 504 | SSDG MAINTENANCE (BERGEN 60,000 HOUR) |
| 507 | CARGO OIL CONTENT MONITOR CALIBRATION AND REPAIR |
| 508 | DIESEL ENGINE GOVERNOR PREVENTIVE MAINTENANCE |
| 510 | AUXILIARY BOILER REPLACEMENT |
| 511 | WESTFALIA OILY WATER SEPERATOR SERVICE AND CALIBRATION |
| 521 | PURIFIER MAINTENANCE, FUEL OIL WESTFALIA |
| 550 | OVERHAUL JACKET WATER PLATE COOLERS |
| 551 | OVERHAUL CENTRAL FRESH WATER PLATE COOLERS |
| 552 | FLEXIBLE HOSE REPLACEMENT |
| 553 | HP AIR VESSEL REMOVAL AND INSPECTION (5 YR) |
| 555 | INSPECT, TEST & CERTIFY MACHINERY SPACE CRANES & HOISTS |
| 560 | PERSONNEL ELEVATOR INSPECTION &TEST (5YR) |
| 562 | SCBA ANNUAL INSPECTION |
| 563 | SCBA AIR COMPRESSOR & REFILL STATION INSPECTION & TEST |
| 565 | FIXED GAS FIREFIGHTING SYSTEM INSPECTINO AND TEST |
| 567 | FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST |
| 569 | FIRE & SMOKE DETECTION AND ALARM SYSTEM |
| 570 | PORTABLE FIRE EXTINGUISHER SERVICE |
| 571 | ANNUAL FIRE AND SMOKE DAMPER SERVICE |
| 572 | DEEP FAT FRYER, GRILL & RANGE HOOD FIRE EXTINGUISHING SYSTEM |
| 573 | FIRE HOSE TESTING |
| 574 | FIRE DOORS AND SHUTTERS (1 YR) |
| 600 | HABITABILITY |
| 602 | NEW LIFEBOAT INSTALLATION (T-ALT) |
| 605 | STATEROOM CARPET AND TILE, PASSAGEWAY TILE |
| 652 | LIFEBOAT & DAVIT SERVICE (5 YR) |
| 654 | FAST RESCUE BOAT & DAVIT SERVICE (5 YR) |
| 655 | IMMERSION SUIT SERVICE (3 YR) |
| 656 | ANNUAL LIFERAFT SERVICE |
| 659 | PILOT BOARDING EQUIPMENT & EMBARKATION LADDERS (5 YR) |
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING |
| 851 | ANNUAL GALLEY VENTILATION AND GAYLORD HOOD SERVICE |
| 852 | ANNUAL LAUNDRY VENT CLEANING |
| 853 | HOUSE ACCOMODATION VENT SYSTEM CLEANING |
| 900 | DRYDOCKING AND UNDOCKING |
| 901 | DRY DOCKING AND UNDOCKING VESSEL |
| 902 | PROPELLER SYSTEM MAINTENANCE AND OD BOX GROOM |
| 904 | INSPECTION OF BILGE KEELS |
| 906 | PROP SHAFT AND RUDDER BRG CLEARANCE READINGS |
| 907 | STERN / TAILSHAFT REMOVAL AND HUB REPLACEMENT |
| 908 | STERN TUBE SEAL MAINTENANCE |
| 909 | ROPE GUARD ZINC REPLACEMENT |
| 910 | PROPELLER SHAFT LINE AND NET CUTTER REPLACEMENT |
| 953 | ANCHOR CHAINS AND LOCKERS (5 YR) |
| 954 | RUDDER AND STERN FRAME EXAMINATION |
| 956 | OVERHAULING SEA VALVES (5 YR) |
| 960 | UNDERWATER HULL CLEANING & PAINTING SPOT BLAST |
| 961 | FREEBOARD PRESERVATION |
| 962 | CATHODIC PROTECTINO SYSTEM |
| 963 | SEA CHEST MARINE GROWTH PREVENTION SYSTEM (2 ½ YR) |
| 966 | SHAFT ALIGNMENT & BEARING REACTION CHECKS (2 ½ YR) |
| 1000 | UNREP EQUIPMENT |
| 1001 | STA 2, NO 2 SADDLE WINCH MAIN POWER CABLE REPLACEMENT |
| 1002 | STA 4 HIGHLINE ASD FAN MOTOR POWER CABLE REPLACEMENT |
| 1003 | RAM TENSIONSIONER UPPER AND LOWER SHEAVE BLOCK ASSEMLBY REPAIR AND PRESERVATION |
| 1004 | REPAIR SADDLE WINCH MOTORS AND BRAKES |
| 1005 | ASD FRAME AND FOUNDATION REFURBISHMENT |
| 1006 | WINCH CONTROL BOOTH WINDOW REPALCEMNT, LATCHES, STOPS AND STEEL REPAIR |
| 1007 | STA 3 AND 4 SLIDING BLOCK CHAINS |
| 1010 | CARGO GEAR QUADRENNIAL RECERTIFICATION |
| 1032 | STA 2 UNREP FOUNDATION AND DECK REPLACEMENT |
| 1036 | STA 6 UNREP FOUNDATION AND DECK REPLACEMENT |
| 1037 | STA 7 UNREP FOUNDATION AND DECK REPLACEMENT |
| TOTAL |
| &"Times New Roman,Regular"USNS LARAMIE | &"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | &"Times New Roman,Regular"N3220520R4001 |
ATTACHMENT J-2
File details come from the government source that posted it. Updated .