About this file
From the source
Revised J-2 Document, Deleted WI's 0508, 0511 and 0604 from Work Package.
Other files for this federal contract opportunity
Other files attached to USNS CHARLES DREW MTA, newest first.
| File |
Type |
Posted |
| QUESTION_to_Extend_MTA_rev1.docx |
DOCX document |
|
| QUESTION_to_Extend_MTA.docx |
DOCX document |
|
| QUESTION_2.docx |
DOCX document |
|
| 0505_A_Brine_System_Flush+Replace_Valves_REV1.doc |
DOC document |
|
| 0018_A_DELIVERY_AND_REDELIVERY,_REV_MAY_16_REV1.docx |
DOCX document |
|
| 0514_A_SW_PIPE_AND_VALVE_REPLACEMENTS_REV1.doc |
DOC document |
|
| 0512_A__OVERHAUL_LTFW_3_WAY_VALVES_Rev1.doc |
DOC document |
|
| 7488756_F_Secondary_Cargo_Coolant_Flush.pdf |
PDF |
|
| RFC_Questions_&_Answers.docx |
DOCX document |
|
| 7488716_D.pdf |
PDF |
|
| Simsite_Installation_Procedure.pdf |
PDF |
|
| 0514_A_SW_PIPE_AND_VALVE_REPLACEMENTS.doc |
DOC document |
|
| J_Documents.zip |
ZIP file |
|
| J_&_A_USNS_DREW-Redacted.pdf |
PDF |
|
| N3220519R6007_USNS_DREW_MTA.docx |
DOCX document |
|
| CDRL'S.zip |
ZIP file |
|
| J_-_14_Blank.docx |
DOCX document |
|
| SYNOPSIS_N32205-19-R-6007.docx |
DOCX document |
|
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The file's text, extracted by GovTribe without its formatting.
IGE Summary CAT A
| CATEGORY “A” ITEMS | | | | | | | | | | | |
| GENERAL REQUIREMENT | PRIME / SUBCONTRACTOR | | | OEM MANDATED SUBCONTRACTOR | | | OTHER COSTS | | | TOTAL PRICE |
| ITEM NO. | TITLE CAT A ITEM | LABOR HOURS | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | OTHER COSTS | TOTAL LABOR HOURS | TOTAL MATERIAL | |
| CATEGORY "A" | | | | | | | | | | |
| 000 | GENERAL REQUIREMENTS | | | | | | | | | | |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) "MID TERM AVAILABILITY (MTA) | | | | | | | | | | |
| 011 | FURNISH GENERAL SERVICES (T-AKE) | | | | | | | | | | |
| 012 | INFORMATION TECHNOLOGY SERVICES | | | | | | | | | | |
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTs | | | | | | | | | | |
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | | | | | | | | | | |
| 015 | INTEGRATED LOGISTIC AND GFM SUPPORT RQUIREMENTS | | | | | | | | | | |
| 016 | FIRE PROTECTION AND SHIPS SAFETY PROGRAM | | | | | | | | | | |
| 017 | N/A | | | | | | | | | | |
| 018 | DELIVERY AND REDELIVERY | | | | | | | | | | |
| 019 | SHIPBOARD ACCESS AND SECURITY | | | | | | | | | | |
| 020 | GAS FREE CERTIFICATES | | | | | | | | | | |
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACE | | | | | | | | | | |
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS | | | | | | | | | | |
| 023 | HAZARDOUS WASTE DISPOSAL | | | | | | | | | | |
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTORS FACILITY | | | | | | | | | | |
| WORK ITEM TOTALS |
| 100 | HULL STRUCTURES |
| 101 | Exterior Safety Handrail Replacements |
| 102 | King Post Lighting and Rail Lighting |
| 103 | King Post Preservation |
| 104 | Annual Crane Survey and Procurement of High Torque Wrench |
| 105 | Mast Bearing Changeout |
| 106 | Ladder Preservation |
| 107 | Chain Locker Eductor Repairs |
| 108 | DECK DRAIN PIPE (HOUSE ONLY) |
| 109 | LIQUID CARGO DECK NONSKID RENEWAL |
| 110 | CARGO HANDLING AREA NONSKID RENEWAL |
| WORK ITEM TOTALS |
| 200 | MAIN PROPULSION |
| 201 | INSPECT (Vulcan) MDG and EDG FLEXIBLE COUPLINGS |
| 202 | Annual Automation (FME) |
| 203 | Annual Automation GE |
| 204 | EDG Annual Inspection and TRAINING |
| 205 | MDG RESILIENT MOUNT HEIGHT MEASUREMENTS |
| WORK ITEM TOTALS |
| 300 | ELECTRICAL |
| 301 | Thermographic Survey REV- |
| 303 | PLC Survey REV- |
| 304 | CONSILIUM CS3000 CONTROL PANEL UPGRADE REV - (TALT 17-469) |
| WORK ITEM TOTALS |
| 400 | COMMUNIC ATION & NAV AIDS |
| 401 | BRIDGE EQUIPMENT ANNUAL SERVICE REV- |
| WORK ITEM TOTALS |
| 500 | AUXILIARY MACHINERY |
| 501 | FIREFIGHTING INSPCTIONS AND TESTING |
| 502 | SCBA ANNUAL INSPECTION, AIR COMPRESSOR AND REFILL STATION |
| 503 | CENTRAL SEAWATER PUMP #1 REPAIR |
| 504 | IAN CONRAD BERGAN SYSTEM MAINTENANCE |
| 505 | CARGO REFRIGERATION SYSTEM FLUSH |
| 506 | NO. 1 DEWATERING PUMP REPAIRS (VR18-0093) |
| 507 | 3 AND 4 LO COOLER CLEANING AND GASKET REPLACEMENT 9VR17-0012) |
| 509 | MMR AFFF SYSTEM PIPING REPLACEMENT (T-ALT 394) |
| 510 | HTFW HEATER HEATING ELEMENT REPAIRS (VR18-0093) |
| 512 | OVERHUAL 3 LTFW 3-WAY VALVES |
| 513 | HOIST RECERTIFICATION |
| 514 | SW PIPE AND VALVE REPLACEMENTS |
| WORK ITEM TOTALS |
| 600 | HABITABILITY |
| 601 | BRIDGE WINDOWS HEATER REPAIR |
| 602 | LIFEBOAT, RHIB, DAVITS, AND ACCOM LADDER ANNUAL RECERTIFICAITONS AND TESTING |
| 603 | ANNUAL LIFE RAFT RECERTIFICATION |
| WORK ITEM TOTALS |
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING |
| 801 | YORK SERVICE REPRESENTATIVE FOR SERVICE AND TRAINING |
| WORK ITEM TOTALS |
| 900 | DRY-DOCKING AND UNDOCKING |
| 901 | PROP POLISH, BOW THRUSTER, BILGE KEEL INSPECTIONS |
| 902 | PORT AND STBD ANCHOR WINDLESS GEAR SET REPLACMENT |
| WORK ITEM TOTALS |
| 1000 | UNREP EQUIPMENT |
| 1001 | SPAN WIRE WINCH MOTOR REPAIR |
| 1002 | REFURBISH FLIGHT DECK HATCHES |
| 1003 | FLIGHT DECK HELO NET RECERTIFICATION |
| 1004 | REPLACE FLIGHT DECK LIGHTING KICKPIPES AND CABLES |
| 1005 | 400HZ/28VDC AND WINDBIRD RECERTIFICATION |
| WORK ITEM TOTALS |
| CAT A TOTALS |
| Pricing established based on (check all that apply): | | | | | | | | |
| Prior Awarded Purchase Order Cost | x | AGR Hours | AGR Rate | Total | CAT "A" Total | CAT "B" Total | AGR/ODC Total |
| Historical Work Item cost data from PENG | x | | | $ - 0 | $ - 0 | ERROR:#REF! | $ - 0 |
| Market Research - vendor published cost information | | | | | | | |
| MSC Estimating Guide | x | ODC | G&A and Profit 15% | Total | IGE TOTAL | | |
| Man Hour Labor Rate | | | | $ - 0 | ERROR:#REF! | | |
| Additional Basis for IGE |
| Basis of the independent government estimates were from past installaitons (VRs, ROHs, ROH/DDs, and MTAs), Let me know if you have any questions. |
File details come from the government source that posted it.