Question_and_Answer_3_LEWIS_AND_CLARK_ROH.doc

DOC document 41 KB Posted

Attached to
LEWIS AND CLARK ROH/DD Federal contract opportunity
Solicitation number
N32205-18-R-4253
Issued by
Department of the Navy Military Sealift Command

About this file

Please see the attached response.

View the file

Other files for this federal contract opportunity

Other files attached to LEWIS AND CLARK ROH/DD, newest first.
File Type Posted
Revised_WI_Amendment_11.zip ZIP file
N32205-18-R-4253-0011.pdf PDF
J_-_2_Category_A_Items.xls XLS spreadsheet
J_-_3_Category_B_Items.xls XLS spreadsheet
Amendment_10_Revised_WI.zip ZIP file
N32205-18-R-4253_Amendment_0010.pdf PDF
J_-_2_Category_A_Items.xls XLS spreadsheet
OEM_J&A_FBO_Posting.pdf PDF
N32205-18-R-4253_Amendment_0009.pdf PDF
N32205-18-R-4253_Amendment_0008.docx DOCX document
WI_575_-_Weather_Dk_Pipe_Response.docx DOCX document
0575_B_WEATHERDECK_PIPING_REPAIRS(1).doc DOC document
N32205-18-R-4253_Amednment_0007.pdf PDF
8194707_-.PDF PDF
N32205-18-R-4253_Amendment_6.pdf PDF
Revised_Work_Items.zip ZIP file
Revised_J-Attachments.zip ZIP file
8498002_1-3-18_WI_941.pdf PDF
Q&A_4.doc DOC document
N32205-18-R-4253_Amendment_0005.pdf PDF
0901_A_DRY-DOCKING_AND_UNDOCKING_VESSEL(1).docx DOCX document
N32205-18-R-4253_Amendment_0004.pdf PDF
0913_A_WASTER_PIECE_RENEWAL(1).doc DOC document
Q&A_2_LEWIS_AND_CLARK_ROH_1-16.doc DOC document
530-8496453-_93402901.pdf PDF
N32205-18-R-4253_Amendment_0003.pdf PDF
Revised_Work_Items.zip ZIP file
N32205-18-R-4253_Amendment_0002.pdf PDF
Reference_Drawings_To_Q&A_1.zip ZIP file
Q&A_1_LEWIS_AND_CLARK_ROH_1-11.pdf PDF
N32205-18-R-4253_Amendment_0001.pdf PDF
N32205-18-R-4253.pdf PDF
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
LEWIS_AND_CLARK_Solicitation_Work_Package_N32205-18-R-4253.zip ZIP file
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR SPECIFICATION CLARIFICATION

SPECIFICATION ITEM NO.: 910

PARAGRAPH / SECTION NO: 7.8

TITLE: ___Overhaul Sea Valves

QUESTION:

Please provide number of strainers / strainer plates. Will new gaskets be required? If so, please advise OEM.

ANSWER:

1. Assume 20 strainer plates will be removed and cleaned. 7.10 states to provide and replace all gaskets with new. Gaskets to be replace with Garlock or same as existing.

ATTACHMENT J - 8

File details come from the government source that posted it.