0913_A_WASTER_PIECE_RENEWAL(1).doc
DOC document 88 KB Posted
- Attached to
- LEWIS AND CLARK ROH/DD Federal contract opportunity
- Solicitation number
- N32205-18-R-4253
About this file
Please see attached revised work item.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS LEWIS AND CLARK
(T-AKE 1)
DRYDOCKING AND UNDOCKING
N32205-18-R-4253
14 February 2017
ITEM NO. 913
Category "A"
N756/CSI/SDH/LSC
WASTER PIECES RENEWAL
1.0 ABSTRACT:
1.1 This item describes the requirements for the removal of all existing Waster Pieces, fabrication and installation new Waster Pieces.
2.0 REFERENCES:
2.1 MSC Drawing No. 256-8194714; Central Seawater Cooling System Diagram.
2.2 MSC Drawing No. 256-8194725; Auxiliary Seawater System Diagram.
2.3 MSC Drawing No. 521-8194715; Fire-main System Diagram.
2.4 MSC Drawing No. 529-8194697; Ballast System Diagram.
2.5 MSC Drawing No. 531-7488738; Distilling Plant System Diagram.
2.6 NASSCO Drawing No. 73-87-441; Waster Piece, Class 150, 4 NPS and Above
2.7 Drawing No. 256-8390559; Central Seawater Waster Piece Assembly
3.0 ITEM LOCATION/DESCRIPTION:
3.1 Location/Quantity:
3.1.1 Location:
Table 913-1 – Waster Piece Locations
| Waster Piece Number |
| Spaces |
| Location |
| Sizes |
| Ref. |
| 1 |
| MMR, 3rd Deck |
| Overboard Discharge, FR70, inbd and adjacent to valve SW-V-33 |
| 750mm (30inch) |
| 2.1 |
2.7
| 2 |
| MMR, LL, 5th Deck |
| High Seachest, FR66, adjacent to SW-V-1 |
| 750mm (30inch) |
| 2.1 |
| 3 |
| MMR,LL, 5th Deck |
| Low Seachest, FR66, adjacent to SW-V-4 |
| 750mm (30inch) |
| 2.1 |
| 4 |
| MMR, LL, 5th Deck |
| Low Sea Chest, Centerline, FR66, inbd & adjacent to valve SW-V-41 |
| 600mm (24inch) |
| 2.1 |
| 5 |
| Engineers Workshop, 4-69-1 |
| Overboard discharge, FR72 between valves SW-V-261 and SW-V-241 |
| 100mm (4inch), |
Elbow 2.2
| 6 |
| Bow Thruster Rm 5-16-0 |
| Overboard Discharge, adjacent to SW-V-211 |
| 50mm (2inch) |
| 2.2 |
| 7 |
| Bow Thruster Rm 5-16-0 |
| Overboard discharge, adjacent to SW-V-248 |
| 50mm (2inch) |
| 2.2 |
| 8 |
| Injector Test Shop 4-78-01 |
| Overboard discharge, FR79 between valves SW-V-260 and SW-V-247 |
| 50mm (2inch) |
| 2.1.2 |
| 9 |
| Emergency Fire Pump Rm No. 2, (4-75-2) |
| Sea Chest, FR75, between valves FM-COV 4-75-2 and Strainer FM-F-004 |
| 200mm |
(8 inch) 2.3
| 10 |
| AMR, 5th Deck |
| Low Sea Chest, FR66, between Valve FM-COV 5-65-3 and Strainer FM-F-001 |
| 600mm |
(24 inch) 2.3
| 11 |
| AMR, 5th Deck |
| High Sea Chest, FR66, between FM-COV 5-65-18 and Strainer FM-F-002 |
| 600mm |
(24 inch) 2.3
| 12 |
| AMR, 5th Deck |
| Overboard discharge, FR61 between inboard of valves FM-COV 5-61-4 and Cascade Orificial Restrictive Device (CORD). |
| 100mm |
(4 inch), Elbow 2.3
| 13 |
| Cargo and Aux Pump Rm, 5th Deck |
| Sea Chest, FR37, between valve FM-COV 5-36-2 and Strainer FM-F-003 |
| 200mm |
(8 inch) 2.3
| 14 |
| AMR, 5th Deck |
| High and Low sea suction X-Connect, FR65-66, to Bilge and Ballast Systems |
| 250mm |
(10 inch) 2.4
| 15 |
| MMR, 4th Deck |
| Overboard Discharge, FR67, outboard of Distillate Plants 1 and 2, between valves DB-V-02 and Check valve DB-V-04 |
| 150mm |
(6 inch) 2.5
3.1.2 Quantity:
a. Fifteen (15) Each, Waster Pieces total, ranging in size from 750mm (30” diameter) to 50mm (2” diameter). See listed References for design dimensional and material information.
b. Contractor shall inspect each actual waster pieces to compare as installed measurements to referenced information. See also notes/comments in section 7.0
3.2 Item Description/Manufacturer’s Data:
3.2.1 Bill of Materials (Contractor Furnished): See references 2.6 and 2.7.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:
None.
5.0 NOTES:
5.1 The Contractor and all Subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the Contractor and all Subcontractors regardless of tier must comply with the requirements of all applicable GTR’s.
5.2 The Contractor and all Subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.
5.3 This ship contains High Voltage (HV) electrical systems. The Contractor and Subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a Contractor or Subcontractor approach, work on, or enter a High Voltage area without proper authorization.
5.4 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK AND WHITE. THE CONTRACTOR SHALL ASSUME ALL ELECTRICAL CABLES ARE HOT UNTIL TESTED OTHERWISE. THE CONTRACTOR SHALL TEST ALL ELECTRICAL CABLES TO ENSURE THEY ARE DEAD PRIOR TO WORK ON THE ITEM.
6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.
7.0 STATEMENT OF WORK REQUIRED:
7.1 Tag-Out all required systems and equipment. Drain and dispose of any liquid in accordance with all federal, state, and local regulations.
7.2 Cut and temporarily remove existing insulation and lagging around each Waster Piece and each adjacent mated Saltwater isolation valve. Retain for reinstallation. Inspect removed insulation/lagging for reuse prior to reinstallation.
7.3 Prior to removal, each waster piece shall be tagged and scribed to identify waster piece number, space, and installed location.
7.4 Disassemble waster pieces, and retain all removed fasteners from each waster piece, for reuse. Bag and tag removed fasteners, and label each set of bagged fasteners with the specific waster piece number, space, and location. Inspect all fasteners for suitable reuse, prior to reassembly of each waster piece.
7.5 Remove and rig each waster piece from installed location, and convey from ship to shop.
7.6 Fabrication of NEW Waster Pieces:
7.6.1 Fabricate new waster pieces, using references 2.6 and 2.7 for guidance, and utilizing the existing waster pieces as a template. NOTE: Waster Pieces identified in references 2.1 thru 2.7 are NOT the same length.
7.6.2 In addition to above, use reference 2.7, specific to fabrication of waster piece 1, 2 and 3.
7.6.3 References 2.6 and 2.7 identifies the material requirements for fabrication of waster pieces.
7.6.4 Notify MSCREP and ABS to witness assembly fit up prior to final welding of each new waster piece flange and pipe assembly.
7.6.5 All new welds shall meet ABS requirements for building and classing steel ships.
7.6.6 Using information from original waster piece in 7.3, tag and scribe each new waster piece, to identify waster piece number, space, and installed location.
7.7 Installations:
7.7.1 Convey new waster pieces from shop to ship. Rig and reinstall each new waster piece to original space and location.
7.7.2 Reassemble each new waster pieces, using original retained fasteners previously removed in 7.4. Any fastener inspected to be unfit for reinstallation shall be replaced with new by the contractor. For estimating and bidding purposes, assume ten percent (10%) of removed fasteners shall be renewed.
7.7.3 Renew all removed and disturbed gaskets.
7.7.4 Reinstall insulation and lagging temporarily removed in 7.2.
7.8 Inspection/Test:
7.8.1 Perform inspection of 30-inch waster pieces of High and Low sea chest adjacent to SW-V-1, SW-V-4 and SW-V-33 (reference 2.1) for corrosion, pitting, and verify they are free of marine growth. Perform UT for thickness. Provide condition found report.
7.8.2 Shop Tests:
a. Perform NDT tests on all new welds. Notify ABS and MSCREP to witness tests. Where NDT of welds exhibit indications that do not meet acceptance levels in the “ABS Rules for Nondestructive Inspection of Welds” the welds shall be repaired. This process shall be repeated until results are found acceptable by ABS and MSCREP.
b. Each new Waster Piece shall be hydrostatically tested per requirements identified on the applicable reference 2.1 through 2.5. Notify ABS and MSCREP to witness tests.
7.8.3 Clear system tag-outs. Accomplish operational test of systems to prove restored systems are free and clear and all joints and mating surfaces are leak free. Cycle disturbed valves adjacent to new waster pieces to prove fully functional.
7.9 Painting/Insulation:
7.9.1 Prepare, prime, and paint all new waster piece outer diameters with primer coat and two topcoats of finish paint to match surrounding surfaces using MSC GTR 7 for guidance.
a. Do not paint inside waster pieces.
b. Do not paint gasket area.
7.9.2 Clean and prepare any disturbed areas, and apply primer coat and two topcoats of finish paint, to match the surrounding areas, using MSC GTR 7 for guidance.
7.9.3 Original insulation or lagging temporarily removed for reuse in 7.2, that is inspected and determined unfit for reuse, shall be renewed, using MSC GTR 22 for guidance.
7.10 Marking:
7.10.1 Note and record all existing labels, stencils, and markings prior to starting work. Any labels, stencils, markings disturbed, shall be renewed and replaced as per original; using MSC GTR 29 for guidance.
7.11 Manufacturer’s Representative: None.
8.0 GENERAL REQUIREMENTS: None Additional.