N32205-18-R-4253_Amendment_6.pdf

PDF 15 KB Posted

Attached to
LEWIS AND CLARK ROH/DD Federal contract opportunity
Solicitation number
N32205-18-R-4253
Issued by
Department of the Navy Military Sealift Command

About this file

Please see attached amendment

View the file

Other files for this federal contract opportunity

Other files attached to LEWIS AND CLARK ROH/DD, newest first.
File Type Posted
Revised_WI_Amendment_11.zip ZIP file
N32205-18-R-4253-0011.pdf PDF
J_-_2_Category_A_Items.xls XLS spreadsheet
N32205-18-R-4253_Amendment_0010.pdf PDF
J_-_3_Category_B_Items.xls XLS spreadsheet
Amendment_10_Revised_WI.zip ZIP file
J_-_2_Category_A_Items.xls XLS spreadsheet
OEM_J&A_FBO_Posting.pdf PDF
N32205-18-R-4253_Amendment_0009.pdf PDF
N32205-18-R-4253_Amendment_0008.docx DOCX document
0575_B_WEATHERDECK_PIPING_REPAIRS(1).doc DOC document
N32205-18-R-4253_Amednment_0007.pdf PDF
WI_575_-_Weather_Dk_Pipe_Response.docx DOCX document
8194707_-.PDF PDF
Revised_Work_Items.zip ZIP file
Revised_J-Attachments.zip ZIP file
8498002_1-3-18_WI_941.pdf PDF
Q&A_4.doc DOC document
0901_A_DRY-DOCKING_AND_UNDOCKING_VESSEL(1).docx DOCX document
N32205-18-R-4253_Amendment_0005.pdf PDF
Question_and_Answer_3_LEWIS_AND_CLARK_ROH.doc DOC document
0913_A_WASTER_PIECE_RENEWAL(1).doc DOC document
N32205-18-R-4253_Amendment_0004.pdf PDF
Q&A_2_LEWIS_AND_CLARK_ROH_1-16.doc DOC document
530-8496453-_93402901.pdf PDF
N32205-18-R-4253_Amendment_0003.pdf PDF
Revised_Work_Items.zip ZIP file
N32205-18-R-4253_Amendment_0002.pdf PDF
Reference_Drawings_To_Q&A_1.zip ZIP file
Q&A_1_LEWIS_AND_CLARK_ROH_1-11.pdf PDF
N32205-18-R-4253_Amendment_0001.pdf PDF
N32205-18-R-4253.pdf PDF
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
LEWIS_AND_CLARK_Solicitation_Work_Package_N32205-18-R-4253.zip ZIP file
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N231917312ROH1

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

I. The subject solicitation is hereby amended to revise w ork items 119, 115,120, 520 and 804.

II. Revise WI 520 to a CAT A w ork item.

III. Add WI 920 as a CAT B w ork item.

IV. Revise J-2 and J-3 Attachments

V. Revise CLIN 0011

VI. Offerors must acknow ledge the recipt of this amendment on page 1 of the standard form (SF33) of its proposal and must indicate that the offer is based on RFP 32205-18-R-4253 and Amendments 1 through 6.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Jan-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3220518R4253

X 9B. DATED (SEE ITEM 11)

18-Dec-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Jan-2018

CODE

MILITARY SEALIFT COMMAND NORFOLK

471 EAST C STREET, BLDG SP-64 NAVAL STATION N

NORFOLK VA 23511

N32205 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N3220518R4253

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0011

The CLIN extended description has changed from:

Work Item 520 - Perform 5-10 Year Steering Gear Maintenance The Contracting Officer (KO) will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

To:

Work Item 920 - Rudderstock Removal and Replacement The Contracting Officer (KO) will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

(End of Summary of Changes)

File details come from the government source that posted it.