N32205-18-R-4150-0001.docx
DOCX document 97 KB Posted
- Attached to
- USNS HERSHEL WILLIAMS (T-ESB 4) PSA Federal contract opportunity
- Solicitation number
- N32205-18-R-4150
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220518R4150
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION / CONTRACT FORM
The required response date/time 07-Aug-2018 02:00 PM has been added.
The number of offeror copies required 4 has been added.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
Prepare for and accomplish the Post Shakedown Availability of the USNS HERSHEL WILLIAMS (T-ESB 4)Total Category "A" WIs $_____________Proposed unit price per KWh $_____ in accordance with (IAW) WI 011, 7.1.1.4Proposed unit price per gallon of potable water $______ IAW WI 011, 7.1.2.2Proposed unit price per gallon of distilled water $______ IAW WI 011, 7.1.3.2Proposed unit price per gallon of bilge water removal $______ IAW WI 011, 7.1.20.3Proposed unit price per crane usage $______ IAW WI 11, 7.9.1Proposed Hazardous Waste handling fee rate IAW WI 023, 7.5.1 ______%
To:
Prepare for and accomplish the Post Shakedown Availability of the USNS HERSHEL WILLIAMS (T-ESB 4)Total Category "A" WIs $_____________Proposed unit price per KWh $_____ in accordance with (IAW) WI 011, 7.1.1.4Proposed unit price per gallon of potable water $______ IAW WI 011, 7.1.3.2Proposed unit price per gallon of distilled water $______ IAW WI 011, 7.1.4.2Proposed unit price per gallon of bilge water removal $______ IAW WI 011, 7.1.18.8Proposed unit price per crane usage $______ IAW WI 11, 7.7.1.1Proposed Hazardous Waste handling fee rate IAW WI 023, 7.4.1 ______%
CLIN 0006
The CLIN extended description has changed from:
CAT "B" WI 0402 – Expansion of Handheld UHF Radio Repeater System Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
To:
CAT "B" WI 0402 – Expansion of Handheld UHF Radio Repeater System is removed from the work item package. Submission of proposal for CLIN 0006 is no longer required. Total number of CLINs is changed from 0021 to 0020.
The following have been modified:
TOTAL PROPOSED PRICE
TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0021 $______________
The contractor shall enter the total proposed price of all CLINs.
CLAUSES INCORPORATED BY FULL TEXT
PART I - THE SCHEDULE
Section B, Price Schedule, detailed information
CLIN 0001 –Attachment J-2 – Category “A” WIs provides a WI breakdown of CLIN 0001 pricing.
CLIN 0002: This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions, etc.) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated under the H-3 Clause - AGR and H-4 Clause ODC, for the duration of the contract. Changes are inherent to vessel repair contracts and should be expected by the Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:
| Abrasive cleaning/blasting | Tank cleaning | ||
| Welding | Machinists (inside and outside) | ||
| Burning | Brazing | ||
| Carpentry | Electrical work | ||
| Electronic work | Shipfitting | ||
| Lagging | Painting | ||
| Boilermaking | Pipefitting | ||
| Sheetmetal work | Engineering | ||
| Rigging | Staging/scaffolding | ||
| General labor | Fire Watch |
Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:
| Testing | Quality Assurance | ||
| Planning | Cleaning (except tank cleaning) | ||
| Material handling & warehousing | Security | ||
| Surveying | Administration | ||
| Transportation | Purchasing staff | ||
| Lofting | Other indirect support | ||
| Supervision |
Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's fully loaded manhour rate and not separately priced.
The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The KO will apply these rates to the ODCs for each CCO when it is negotiated and settled.
The base cost, stated in this CLIN does not include the profit or G&A rates.
NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.
CLINs 0003 through 0021 –Attachment J-3 – Category “B” WIs provides a WI breakdown of CLIN 0003 through 0020 pricing.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
C-1 GENERAL
1. The contractor shall prepare for and accomplish the VR, overhaul, or alterations of the USNS HERSHEL WILLIAMS (T-ESB 4) as specified herein and IAW the WI package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.
2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):
(a) Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.
(b) Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR Clause 52.245-1 and DFARs Clauses 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004.
(c) Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.
(d) Using management procedures and systems to identify behind schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.
(e) Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted in accordance with the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 013.
(f) Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.
(g) Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.
(h) Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.
(i) Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.
(j) Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.
(k) Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.
3. Contract work shall be performed by an eligible contractor as defined below.
(a) The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.
(b) The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall provide industry certifications such as: MSRA, ABR, or ISO Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate its ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award:
a. Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.
b. Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.
c. Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.
d. Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.
e. Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.
f. Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.
g. Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.
h. Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.
i. Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number. Disposal records which indicate type of material, date, and place of disposal.
j. Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:
· Pier, with services in place, accessible to the CLASS size ship for birthing
· Structural Shop
· Machine Shop
· Pipe Shop
· Electrical/Electronic Shop
· Carpentry Shop
· Rigging Equipment
· Dry-dock – when required for docking of vessel in performance of the specification
k. Agreements. To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate its ability to obtain required resources.
(c) The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.
This award consummates the contract which consists of the following documents: (a) the Government’s solicitation and your final proposal revision submitted on 08/07/2018 inclusive of all discussion and clarifications responses and (b) this award/contract.
C – 2 List of Standard WIs included for this solicitation:
NOT SEPARATELY PRICED (NSP) REQUIREMENTS Category
| 001 | INTENT, SCOPE, GENERAL CONDITIONS AND DEFINITIONS | NSP |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | NSP |
| 006 | HEAVY WEATHER PLAN | NSP |
| 007 | COLD WEATHER PLAN | NSP |
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY (NSP) | NSP |
CATEGORY “A” WORK ITEMS
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) | A COMBINED |
| 011 | FURNISH GENERAL SERVICES | A COMBINED |
| 012 | TELEPHONE SERVICES | A COMBINED |
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS | A COMBINED |
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | A COMBINED |
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS | A COMBINED |
| 016 | FIRE PROTECTION AND SHIP’S SAFETY PROGRAM | A COMBINED |
| 017 | HANDLING SHIP’S STORES | A COMBINED |
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL | A COMBINED |
| 019 | SHIPBOARD ACCESS AND SECURITY | A COMBINED |
| 020 | GAS FREE CERTIFICATES | A COMBINED |
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | A COMBINED |
| 022 | MACHINERY SPACE TURN-OVER DOCK TRIALS AND SEA TRIAL | A COMBINED |
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR’S FACILITY | A COMBINED |
CATEGORY “B” WORK ITEMS
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY | B COMBINED |
| 030 | CONTINUATION OF SERVICES | B COMBINED |
SECTION 100 HULL STRUCTURE Category
CATEGORY “A” WORK ITEMS
| 101 | MACHINERY ROOM TO PUMP ROOM DOOR INSTALL (T-ALT 15-002) | A | |
| 102 | MACNINERY SPACE DECK UTILIZATION PLAN (T-ALT 15-057) | A | MSC |
SECTION 200 PROPULSION MACHINERY
N/A
| SECTION 300 | ELECTRICAL | |
| CATEGORY “A” WORK ITEMS | Category | |
| 301 | HULL PERIMETER LIGHTING (T-ALT 15-005) | A |
| 302 | FORWARD AND AFT HOUSE MSC LAND CABLE INSTALL (T-ALT 16-017) | A |
| 303 | HIGH VOLTAGE AND MEDIUM VOLTAGE SWITCHBOARD | A |
| INSPECTION AND CLEANING | ||
| 321 | NIGHT VISION DEVICE (NVD) | A |
| 322 | MISSION DECK NVD LIGHTING (T-ALT TBD) | A |
| 332 | RELOCATE FLIGHT DECK LIGHTS (T-ALT 16-057) | A |
| 333 | INSTALL LIGHT FIXTURES FORWARD MEDICAL TREATMENT ROOM (T-ALT 17-034) | A |
CATEGORY “B” WORK ITEMS
355 MISC. ELECTRICAL CONDUIT AND CABLE TRAYS (T-ALT 18-021) B
SECTION 400 COMMUNICATION AND NAVIGATIONAL AIDS Category
CATEGORY “A” WORK ITEMS
| 401 | EXPAND SHORE TELEPHONE CABABILITY (T-ALT 15-033) | A |
| 403 | MACHINERY SPACE CCTY AND BOW CAMERA MONITORING SYSTEM | |
| (T-ALT 15-018/048) | A | |
| 405 | SITE 300 INSTALLATION INDUSTRIAL ASSIST | A |
| 423 | ADDITIONAL AIRCRAFT OPERATING TYPES – VISUAL LANDING AIDS(T-ALT 16-031) | A |
| 432 | INSTALL SOUND POWERED PHONE LINES (T-ALT 16-005) | A |
| 433 | AUTOMATIC DIAL TELEPHONE SYSTEM (T-ALT 16-024) | A |
CATEGORY “B” WORK ITEMS
| 404 | TV-DTS STSTEM MODIFICATIONS (T-ALT 15-059) | B |
| 421 | RADIO INFRASTRACTURE FOR CBSP AND OE-570 (T-ALT 16-028) | B |
| 422 | RADIO INFRASTRUCTURE FOR HF, UHF AND VHF (T-ALT 16-029) | B |
| 425Y | SECURE TACTICAL BRIEFING ROOM CONVERSION (T-ALT 16-021) | B |
| 426Y | UNMANNED AERIAL SYSTEM (UAS) RQ-21A BLACKJACK INSTALLATION | |
| (T-ALT 16-030) | B | |
| 427Y | SCAN EAGLE/AEROSONDE UAS INSTALLATION (T-ALT 16-029) | B |
| 428Y UNMANNED AERIAL SYSTEM (UAS) FIRE SCOUT (T-ALT 18-002) | B |
SECTION 500 AUXILIARY SYSTEMS Category
CATEGORY “A” WORK ITEMS
| 501 | INSTALL DUMBWAITER FROM UPPER DECK TO A DECK (T-ALT 15-006) | A |
| 502 | FORWARD ADDITIONAL A/C INSTALLATION (T-ALT 15-021) | A |
| 503 | SEGREGATION OF BLACK AND GREY WATER LINES (T-ALT 15-022) | A |
| 504 AFT HOUSE GREY WATER SYSTEM ISLOATION (T-ALT 15-036/37) | A | |
| 505 | MISSION DECK BOAT REFUEL ENHANCEMENT (T-ALT 15-052) | A |
| 506 | FORWARD FIRE MAIN LOOP INSTALLATION (T-ALT 15-055) | A |
| 507 | INSTALL SCBA COMPRESSOR AND FILL STATION (T-0ALT 15-010) | A |
| 508 | RO FEED WATER CYCLONE SEPATOR INSTALL (T-ALT 17-028) | A |
| 509 | HTFW AND LTFW SYSTEM FLUSH | A |
| 521 | ADDITIONAL AIRCRAFT OPERATING TYPES JP-5 RELOCATION (T-ALT 16-038) | A |
| 522 | ADDITIONAL AIRCRAFT OPERATIONAL TYPES 28VDC SPOTS 1 AND 2 (T-ALT 16-037) | A |
| 523 | MOTOR GASONLE (MOGAS) CARGO FUEL STOWAGE (T-ALT 16-036) | A |
| 528 | FORWARD OVERBOARD BLACK AND GREY DISCHARGE AND SHORE | A |
| CONNECTION (T-ALT 16-043) | ||
| 529 | INSTALL BALLAST STANDPIPE FLOW SWITCH (T-ALT 15-066) | A |
| 582 | INSTALL MISSION DECK MOORING FITTINGS (T-ALT 16-006) | A |
| 583 | INSTALL MISSION DECK BOAT HANDLING BITTS (T-ALT 15-060) | A |
| 584 | MISSION DECK CLEATS AND CHAFING BARS (T-ALT 18-004) | A |
| 595 | INSTALL DECK EDGE FAIRING (T-ALT 18-005) | A |
CATEGORY “B” WORK ITEMS
| 524 | ADDITIONAL AIRFCAFT OPERATIONAL TYPES 28VDC SPOTS 3 AND 4 (T-ALT 16-035) | B | |
| 528 | FORWARD OVERBOARD BLACK AND GREY DISCHARGE AND SHORE | B | |
| CONNECTION (T-ALT 16-043) | |||
| 555 | INSTALL FIBACLAD (T-ALT 16-010) | B | |
| 596 | OP-4 CRANE CERTIFICATION TSTING | B |
SECTION 600 OUTFIT, FURNISHINGS AND HABITABILITY Category
CATEGORY “A” WORK ITEMS
| 601 | AFT HOUSE HABITABILITY MODIFICATIONS (T-ALT 15-008/15-013/17-023) | A |
| 602 | ENGINE CONTROL ROOM NO. 1 DECK HEAD INSTALLATION (T-ALT 15-040) | A |
| 603 | SELF SERVE LAUNDRY CAPACITY EXPANSION (T-ALT 15-053/054) | A |
| 604 | INSTALL GALLEY SHELVING (T-ALT 17-002) | A |
| 613 | INSTALL FLIGHT DECK SAFETY NETS (T-ALT 16-011) | A |
| 621 | ADDITIONAL TEUS - ACCOMMODATION TEUS AND PLATFORM (T-ALT 16-034) | A |
| 623 | ADDITIONAL TEUS – MODIFICATIONS –A6 LEVEL (T-ALT 16-032) | A |
| 625 | INSTALL HELICOPTER CONTROL STATION SUN SHADES (T-ALT 17-035) | A |
CATEGORY “B” WORK ITEMS
| 612 | MODIFY FIXED LIFERAILS TO ELIMINATE FLIGHT DECK INTERFERENCES | |
| (T-ALT 16-001) | B | |
| 622 | ADDITIONAL TEUS – ARMORY AND MEDICAL AND OTHER TEUS (T-ALT 16-033) | B |
| 632 | REPAIR EXTERIOR NON-SKID DECK COATINGS | B |
SECTION 800 HEATING, VENTILATION AND CONDITIONING Category
CATEGORY “A” WORK ITEMS
820 AVIATION SUPPORT SPACES HVAC UPGRADE PHASE I (T-ALT 18-013) A
CATEGORY “B” WORK ITEMS
| 801 | INSTALL INDEPENDENT A/C UNITS IN ADJACENT SPACES TO HELO HANGER B |
| (T-ALT 16-051) |
SECTION H - SPECIAL CONTRACT REQUIREMENTS
SECTION H CLAUSES
H-1 OPTION FOR INCREASED QUANTITIES
The Government may require delivery of the numbered line items identified in Section B as option items in any amount up to the unit quantities and at the unit prices stated in the contractor’s J-3, “Contractor Price Breakdown – Category B Items.” The KO may exercise the options by giving the contractor written notification or via issuance of standard modification (SF 30). Delivery of option items shall be within the performance period identified in Section F unless the parties otherwise agree.
H-2 PREVENTION OF THE DISCHARGE OF OIL AND HAZARDOUS SUBSTANCES
(a) Policy. In compliance with Executive Order Number 11752 (38 F.R. 34793), the policy of the DON is to conform to the provisions of the Federal Water Pollution Control Act, as amended (Title 33 U.S.C. 1251 et seq), and the Oil Pollution Act of 1990, as amended (Title 33 U.S.C. 2701 et seq.), insofar as these Acts prohibit the discharge of oil, oily mixtures, and hazardous substances, and regardless of whether or not these Acts pertain specifically to the Naval vessel and shore activities. The prescribed clause is intended to implement that policy with respect to the ship(s) being constructed or undergoing repair and overhaul under this contract.
(b) Definitions. For the purpose of this clause, the terms "oil," "oily mixtures," "hazardous substance," and "discharge" shall have the meanings as defined in the Acts referred to in paragraph (a) of this clause and other environmental statutes.
(c) Trials. Prior to commencement of any dock or sea trials hereunder, the contractor shall assure the Ship’s Master and CHENG as well as the PPE by demonstrations, completed test memoranda, or other means reasonably acceptable to the Ship’s Master and CHENG, as well as the PPE, that all equipment, the function of which is to prevent the accidental discharge of oil, oily mixtures, or hazardous substances from the ship, that the contractor shall be required by the specifications to install, is fully operable.
(d) Reports. The contractor shall, as soon as it has knowledge of any discharge of oil, oily substance, or hazardous substance from the ship, immediately notify the Ship’s Master and CHENG, as well as the Principle Port Engineer, thereof and shall immediately take all reasonable steps to prevent further discharge. Within 24-hours thereafter, the contractor shall file with the Ship’s Master and CHENG, as well as the PPE, the "Oil or Hazardous Substance Discharge Report.”
(e) Liability. The contractor shall be liable to the Government for all such costs of removal of such oil, oily mixture, or hazardous substance where such discharge was the result of willful negligence or willful misconduct within the privity and knowledge of the contractor. All documentation related to such waste shall bear the contractor’s generator number in accordance with WI 0023 HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY. The contractor shall not be liable for the costs incurred by the Government for the removal of such oil, oily mixture, or hazardous substance when initiated by the Government.
H-3 AGR CONTRACT LINE ITEM NUMBER (CLIN 0002)
(a) The Government may utilize CLIN 0002 for and not limited to, man-hours generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI. This work may consist of supplemental, emergent, or new work. AGR does not include work performed pursuant to DFARS Clause 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 AGR man-hours, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned WIs, to any other Government contract, or to any other work in progress for the Government. Work under this CLIN may coincide with ODC, and therefore will be performed concurrently with H-4 (ODC).
(b) As a result of a discrepancy found between the WI and the current conditions or a needed repair found during the open and inspect phase of the WI, the contractor may submit a CFR to the ACO and the PPE. As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders AGR pursuant to this clause, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the KO. The contractor's failure to submit its proposal within the three (3) day period, or such extended period of time, may be considered a failure of the parties to negotiate a fair and reasonable price for the AGR and will permit the KO to take any of the three (3) options set forth in subparagraph (d) below. AGR proposals shall be priced using the FBLR set forth in Section B, CLIN 0002. The rate established in CLIN 0002 will be used in evaluating the contractor's proposal and will also be used for negotiating changes as required by this clause. As part of the contractor’s proposal submission for AGR, the following shall be included:
| - FBLR |
| - Proposed Labor Mix/Categories |
| - Proposed Man Hours |
| - Total Proposed AGR |
(c) Considering FBLRs have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of labor categories and associated man-hours to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) as a result of the mix of labor categories and man-hours, the subsequent AGR price is fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the KO reserves the right to procure these ODCs utilizing alternative means described in subparagraph (d), below.
(d) Upon receipt of the contractor's price proposal for the AGR the contractor and the KO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the KO, the KO reserves the right to:
(1) Have the work performed by the Government;
(2) Issue a unilateral modification;
(3) Cancel the requirement.
(e) The contractor knowingly and voluntarily waives all claims against the Government and/or other third-party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing the AGR at the contractor's facility. Furthermore, in cases described in sub-paragraphs (d)(1) and (2) above, the contractor waives any right to claims of interference under the DFARS Clause 252.217-7011 - Access to Vessels.
(f) The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN 0001) does not include any amount for AGR (CLIN 0002). Settlement of AGR (CLIN 0002) will be for the purpose of providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the KO. The Contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled CCO and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0020 at contract completion shall be de-obligated.
H – 4 OTHER DIRECT COSTS (CLIN 0002)
(a) The Government may utilize CLIN 0002 for and not limited to, material and equipment generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI. This work may consist of supplemental, emergent, or new work. ODC does not include work performed pursuant to DFARS Clause 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 ODC, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned WIs, to any other Government contract, or to any other work in progress for the Government. Work under this CLIN may coincide with AGR, and therefore will be performed concurrently with H-3 (AGR).
(b) As a result of a discrepancy found between the WI and the current conditions or a needed repair found during the open and inspect phase of the WI, the contractor may submit a CFR to the ACO and the PPE. As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders ODC pursuant to this clause, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the KO. The contractor's failure to submit its proposal within the three (3) day period, or such extended period of time, may be considered a failure of the parties to negotiate a fair and reasonable price for the ODC and will permit the KO to take any of the three options set forth in subparagraph (d) below. As part of the contractor’s proposal submission for ODCs, the following shall be included:
Material -Part number -Order quantity -Unit price -Total price
Equipment
- Part number
- Order quantity
- Unit price
- Total price
Other Direct Costs not captured above
- Travel
- Per diem (lodging, M&IE daily rates)
- Subcontractor Proposal Breakdown shall include but not be limited to, Material (Part number, Order Quantity, Unit Price, and Total Price), equipment (Part Number, Order Quantity, Unit Price, and Total Price), labor (FBLR, Proposed Labor Mix/Categories, and Proposed Manhours), and ODC (Travel and Per Diem)
- Etc.
The G&A and profit rates proposed shall be the same as the rates provided under CLIN 0002 in the contract.
(c) Considering, G&A and profit rates have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of ODCs proposed to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) the costs of the ODCs are fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the KO reserves the right to procure these ODCs utilizing alternative means described in subparagraph (d), below.
(d) Upon receipt of the contractor's price proposal for the AGR the contractor and the KO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the KO, the KO reserves the right to:
(1) Have the work performed by the Government;
(2) Issue a unilateral modification;
(3) Cancel the requirement.
(e) The contractor knowingly and voluntarily waives all claims against the Government and/or other third-party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing the ODC at the contractor's facility. Furthermore, in cases described in sub-paragraphs (d)(1) and (2) above, the contractor waives any right to claims of interference under the DFARS Clause 252.217-7011 - Access to Vessels.
(f) The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN 0001) does not include any amount for the ODC (CLIN 0002). Settlement of ODC (CLIN 0002) will be for the purpose of providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the KO. The contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled CCO and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0020 at contract completion shall be de-obligated.
H-5 EMPLOYMENT OF NAVY PERSONNEL RESTRICTED
In performing this contract, the contractor will not use as a consultant or employ (on either a full or part-time basis) any active duty Navy personnel (civilian or military) without the prior approval of the KO. Such approval may be given only in circumstances where it is clear that no laws and no DOD or Navy instructions, regulations, or policies are contravened and no appearance of a conflict of interest will result.
H-6 ASBESTOS REMOVAL REQUIREMENTS
(a) During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos-containing products. This clause applies to each instance of asbestos removal or disturbance.
(b) The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, state, and local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.
(c) The latest change to the Federal, state, and local regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the OSHA Action level airborne concentration (currently 0.1 f/cc of air).
(d) During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.
(e) After removal or disturbance is complete, the areas within the removal boundary shall not be released for re-occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.
(f) In all respects, the performance of air sampling and analysis shall be performed in accordance with the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:
(1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four (4) hours.
(2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.
(3) Air sampling shall be performed by a person competent in sampling procedures and overseen by a CIH by the ABIH.
(4) Laboratory analysis of samples shall be performed by a participant in the AIHA PAT Program rated proficient for asbestos and air.
(g) Personal sampling shall be conducted using breathing zone air samples which are representative of the 8-hour TWA exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).
(h) The contractor agrees to indemnify MSC for any fines assessed by Federal, state, or local agencies, for the contractor's failure to properly follow applicable regulations.
(i) The contractor shall insert this clause in all subcontracts entered into under this contract.
H-7 SUBCONTRACTOR SUBSTITUTION
Post-award substitution of any major subcontractor should not be effected unless the proposed substitution is submitted to the KO and official approval is obtained. The post-award substitution or insertion of a second-tier subcontractor will be treated in the same manner as the substitution of a major subcontractor and will require specific approval by the KO.
H-8 SUBSTITUTION OF KEY PERSONNEL
(a) General Clause. The contractor agrees to assign to this contract those persons identified as key personnel whose resumes were submitted with the proposal and who are necessary to fulfill the requirements of this contract. No substitution of key personnel shall be made except IAW this clause.
(b) Guidance on Substitutions. All proposed substitutions must be submitted, in writing, at least seven (7) days in advance of the proposed substitutions to the KO and must provide the information required by paragraph (c) below.
(c) Request for Substitution. All requests for substitution must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information as requested by the KO. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person to be replaced. The KO or his authorized representative will evaluate such requests and promptly notify the contractor of the approval or disapproval thereof.
H – 9 WAIVER OF CLAIMS
All requests for equitable adjustment to the contract price and any other claims whatsoever for monies due under this contract must be submitted to the KO pursuant to FAR Clause 52.233-1 Alt I - Disputes within six (6) months of the redelivery of the ship. All requests for equitable adjustment that are not submitted within the six (6) month limit shall be deemed to have been waived by the contractor.
H – 10 UTILIZATION OF TRAVEL AND PERDIEM IN CONDUCTING CHANGE ORDERS
The contractor shall demonstrate due diligence in the assessment, evaluation, and determination resulting in the proposed utilization of other than local specialized labor resources.
Only with KO approval to proceed will a contractor, technical representative, or subcontractor be reimbursed for reasonable per diem costs (transportation, travel expenses, lodging, meals, and incidental expenses) required in connection with the associated change order. Per diem costs are considered reasonable, allowable, and reimbursable only to the extent that they do not exceed the allowed per diem rate in effect at the time of travel as set forth in the FTR, JTR, or Standardized Regulations as set forth in FAR 31.205-46.
SECTION I - CONTRACT CLAUSES
The following have been deleted:
52.219-6
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICE TO BIDDERS
L – 1 GOVERNMENT FURNISHED INFORMATION – TECHNICAL DATA (GFI-TD)
GFI-TD referenced but not enclosed with this RFP are available via CD upon request. Offerors shall submit their request to the KO and provide their company name, point of contact, address, and phone number, and shall indicate if data will be forwarded to subcontractors.
L –2 REQUIREMENTS FOR SUBMISSION OF PROPOSALS
A. Proposal Submittal and Inquiries.
1. Proposals shall be received prior to the closing date and time identified on the SF 33, at the following address:
Military Sealift Command
| Attn: Tommy Hale |
| 471 C Street |
| Naval Station Norfolk, VA 23511-2419 |
2. Electronic submissions via email or facsimile will not be accepted. Offers shall be mailed through a commercial/Government carrier or hand-carried.
3. All questions concerning the solicitation shall be addressed to the contracting specialist identified below via email:
tommy.a.hale@navy.mil
4. See L-5, “Inspection of Vessel/Pre-Proposal Conference,” for instructions to participate in a pre-proposal inspection of the vessel.
B. General Instructions
1. The selection of a source for award purposes will be conducted utilizing source selection (negotiated) procedures as delineated in FAR Subpart 15.3. Offers will be evaluated using the criteria under Section M, “Evaluation Factors for Award.” Noncompliance with the RFP requirements may hamper the Government’s ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.
2. The offer. The submission of the documentation specified below will constitute the offeror’s acceptance of the terms and conditions of the solicitation.
3. It is the Government’s intention to award without discussions. Offerors are encouraged to submit their best technical proposal and prices in initial proposals. IAW FAR 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency IAW FAR 15.306(c)(2). Proposals containing unacceptable ratings may be included in the competitive range provided they can be made acceptable as a result of discussions.
4. Instructions outlined in paragraph C below prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of information needed to allow for evaluation of proposals.
5. The WI Package is only available upon a written request to the contract specialist. All other referenced documents for this solicitation are available on the FBO website at https://www.fbo.gov.
6. Debriefings. The KO will promptly notify offerors of the decision to eliminate their proposals from the competitive range, whereupon an offeror can request and receive a debriefing in accordance with FAR 15.505. The KO will notify unsuccessful offerors in the competitive range of the source selection decision IAW FAR 15.506. Upon such notification, unsuccessful offerors may request and receive a debriefing. Any offeror requesting a debriefing must make the request in accordance with the requirements of FAR 15.506.
C. Proposal Preparation Instructions
1. Offeror’s proposal shall consist of two (2) separate volumes: (Volume I) General; and (Volume II) Technical Proposal.
2. Proposal Format
a. Offerors shall submit an original of their proposals and the number of copies listed in paragraph “c” below.
b. The proposals shall be organized into two (2) separate, sealed volumes. Each hard copy volume of the proposal shall be separately bound in a three-ring loose leaf binder. The original copy of each volume shall be marked, “Original,” and any copy shall be marked, “Copy.”
c. In addition to submitting hard copies of the proposals, offerors shall provide digital copies on CD-ROM disk in Adobe PDF, Microsoft Word, PowerPoint, and/or Excel. Offerors shall ensure that proposal disks are virus-free and free of password protection. The Government reserves the right to eliminate a proposal from consideration if access to proposal data is prohibited due to viruses, passwords, and/or wrong format.
d. The table below shows detailed page limits and number of copies required to be submitted:
| Volume |
| Title |
| Number of Hard Copies |
| Number of Digital Copies (CD ROM) |
| Page Limits |
| I |
| General |
| 2 |
| 1 |
| N/A |
| II |
| Technical Proposal |
| 4 |
| 1 |
| 50 pages, excluding appendices |
The proposal shall not exceed the limits stated above. If the page limits are exceeded, the pages in excess of the limit shall be removed and remain unread.
The offeror shall submit a technical and a price proposal that shall include, at a minimum:
D. Proposal Content
1. Volume 1 – General. Offerors are required to submit: (TAB A) a completed SF 33 to include acknowledgement of amendments, if applicable; (TAB B) Section B – Supplies or Services and Prices/Costs and an itemized breakdown of price on the form(s) provided in Attachments J-2 and J-3; (TAB C) Subcontracting Plan (applicable if the offeror is a large business); (TAB D) Section K Representations, Certifications, and Other Statements of Offerors; and (TAB E) Past Performance.
TAB A, SF 33. The SF 33 shall be fully completed upon submission. The offeror shall acknowledge any amendments to the RFP in accordance with the instructions on the SF 33 and FAR Clause 52.215-1(b).
TAB B, Price:
For the price submission, the hard copy version will take precedence for any differences noted between the hard copy and electronic versions of an offeror’s proposal.
Offerors shall submit prices in the format specified on the Contractor Price Breakdown forms of this solicitation, Attachments J-2 and J-3. Each specification Item Number must be either priced or marked “NSP.”
Overall Price. Unit prices and extended prices must be submitted as indicated, except NSP items.
Offerors shall include any costs associated with third-party access to the contractor’s facility, including costs for badges, safety orientation instruction, and/or parking, in the price proposal under the Shipboard Access and Security Item. For estimating purposes, offerors shall assume that (1) the Government will require access, to include safety orientation instruction and parking at the shipyard facility, for forty-five (45) individuals for the entire duration of the performance period; and (2) 20% of the badges issued to the Government and third-party personnel will be lost/misplaced and will require replacement.
Offerors shall include the Hazardous Waste Handling Fee rate per WI 0023 Hazardous Waste Disposal at a Contractor’s Facility; and the unit price per KWh for electrical power, the unit price per gallon of potable water, and the unit price per gallon of distilled water per WI 0011 in Section B of the solicitation.
The contractor agrees that its man-hour rate for the 30,201 man-hours of the AGR includes the complete and full compensation to which it is entitled, including, but not limited to, compensation for all the direct labor costs, (e.g., straight time, overtime, premium time, shift differential, holiday time, standby time, etc.) for performing the AGR, as well as compensation for acceleration, delay and disruption, and other impact, if any, to the aforementioned WI, to work performed under any other Government contract, and to any work in progress for the Government. The contractor further agrees that it is not entitled to a time extension to the delivery date of any ship under a Government contract by reason of or as a result of the ordering of the 30,201 man-hours of AGR.
AGR does not include work performed pursuant to the clauses of this contract entitled “Inspection and Manner of Doing Work,” “Guarantees,” or other contract provision relating to the correction of defects.
TAB C, Subcontracting Plan. IAW FAR Clause 52.219-9, 52.219-9 Alt II, and DFARS Clause 252.219-7003, large business offerors shall submit a Small Business Subcontracting Plan with their proposal. Offerors shall ensure they submit a Small Business Subcontracting Plan with all of the information required.
In preparing the Small Business Subcontracting Plan, offerors should note that historical compliance with FAR Clause 52.219-8, 52.219-9 Alt II, and DFARS Clause 252.219-7003 shall be evaluated as part of Past Performance.
TAB D, Section K (Representations, Certifications, and Other Statements of Offerors). The offeror shall ensure that its Section K submission is thoroughly completed, with all blocks in each certification/representation executed in their entirety and truthfully.
TAB E, Past Performance:
The Past Performance evaluation will be accomplished by reviewing aspects of an offeror’s recent and relevant Past Performance. Offerors may provide information for up to three (3) previous Government contracts where the effort is/was recent and relevant to the effort required by this solicitation.
a. “Recent” is defined as a contract inprogress or completed within the last three (3) years. If the offeror has not had three (3) Government contracts within the last three (3) years, information on recent and relevant subcontracts and/or commercial contracts may be submitted.
b. “Relevant” is defined as a contract that is of similar scope, magnitude, and complexity to the requirements as set forth in this solicitation.
i. Scope: Experience in the areas defined in the WI package.
ii. Magnitude: The measure of the similarity of the volume, dollar value and/or duration of the work actually performed under the offeror’s submitted contracts to the WI package.
iii. Complexity: The measure of the similarity of technical difficulty, managerial intricacy and/or required coordination of efforts and disciplines performed by the offeror in its submitted contracts to the WI package. For complexity, not only will the tasks performed by the offeror be considered, but also the offeror’s ability to coordinate tasks (e.g., concurrent performance requirements).
A Past Performance Data Sheet (Attachment J-12) shall be submitted for each contract to be considered as past performance. Offerors shall provide a detailed explanation demonstrating the similarity of the contracts to the requirements of this solicitation; a detailed description of the work performed for the contract; and the role performed, including whether the offeror acted as a prime contractor or a subcontractor. Offerors are responsible for the accuracy of all data provided.
This is the start of the file's text. The full file is on GovTribe.