N32205-16-R-4301_Amendment_0005.doc

DOC document 84 KB Posted

Attached to
ROH/DD of USNS AMELIA EARHART
Solicitation number
N32205-16-R-4301
Issued by

About this file

Amendment 0005

View the file

Other files

File Type Posted
FEV_001_O_01_X_ASB.PDF PDF
0501_A_CMWD_Pipe_Replacement_(Zone_1)_Revised.doc DOC document
J_-_2_Category_A_Items_FPR.xls XLS spreadsheet
1001_A__Flight_Deck_ONLY_Nonskid_Renewal.doc DOC document
FEV_002_O_01_X_ASB.PDF PDF
FEV_004_O_01_X_ASB.PDF PDF
FEV_003_O_01_X_ASB.PDF PDF
J-A_-_ROH-DD_FY16_USNS_AMELIA_EARHART_TAKE6_redacted_Redacted.pdf PDF
RFP_QandA_No__5_EARHART_16-R-4301.docx DOCX document
N32205-16-R-4301_Amendment_0004.doc DOC document
N32205-16-R-4301_Amendment_0003.doc DOC document
RFP_QandA_No__4_EARHART_16-R-4301.docx DOCX document
J_-_2_Category_A_Items_REV._1.xls XLS spreadsheet
0401_A__ECDIS_Replacement_TALT347_REV2.doc DOC document
RFP_QandA_No__3_EARHART_16-R-4301.docx DOCX document
N32205-16-R-4301_Amendment_0002.doc DOC document
IMG_2910_(800x600).jpg JPG image
IMG_2904_(800x600).jpg JPG image
IMG_2908_(800x600).jpg JPG image
IMG_2836_(800x600).jpg JPG image
IMG_2911_(800x600).jpg JPG image
IMG_2905_(800x600).jpg JPG image
IMG_2903_(800x600).jpg JPG image
IMG_2835_(800x600).jpg JPG image
IMG_2907_(800x600).jpg JPG image
IMG_2906_(800x600).jpg JPG image
IMG_2832_(800x600).jpg JPG image
RFP_QandA_No._2_EARHART_16-R-4301.docx DOCX document
AME_PLC_Index.xls XLS spreadsheet
IMG_2834_(800x600).jpg JPG image
IMG_2833_(800x600).jpg JPG image
Batteries_PLCs_and_UPS.xls XLS spreadsheet
N32205-16-R-4301_Amendment_0001.doc DOC document
RFP_QandA_No._1_EARHART_16-R-4301.docx DOCX document
J_-_12_Past_Performance_Data.doc DOC document
J_-_2_Category_A_Items.xls XLS spreadsheet
USNS_AMELIA_EARHART_J-4.xls XLS spreadsheet
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
N32205-16-R-4301.doc DOC document
J_-_3_Category_B_Items.xls XLS spreadsheet
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_6_WI_015_CDRL.pdf PDF
J_-_10_Interport_Differential_West_Coast.doc DOC document
J_-_11_Dry_Dock_Evaluation_Form.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "A" Work Items (WIs)

FFP

Prepare for and accomplish the Regular Overhaul/Dry-docking (ROH & DD) of the USNS AMELIA EARHART (T-AKE 6)

Total Category "A" WIs

Proposed unit price per KWh $_____ in accordance with (IAW) WI 011, 7.1.1.4 Proposed unit price per gallon of potable water $______ IAW WI 011, 7.1.3.2 Proposed unit price per gallon of distilled water $______ IAW WI 011, 7.1.4.2 Proposed unit price per gallon of bilge water removal $______ IAW WI 011, 7.1.18.7 Proposed unit price per crane usage $______ IAW WI 11, 7.9.1 Proposed Hazardous Waste handling fee rate IAW WI 023, 7.4 ______%

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Additional Government Requirements (AGR)

AGR

20,000 man-hours @ $________ per man-hour =

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Other Direct Costs (ODC)

ODC

Base $_1,000,000.00_

Proposed G&A Rate _______________%

Subtotal:

Proposed Profit Rate _______________%

Subtotal:

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 025

FFP

WI 025 - Physical Security at Private Contractor's Facility in Force Protection Conditions (FPCON) Bravo - Delta

The Contracting Officer (KO) will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 030

FFP

WI 030 - Continuation of Services

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 912

FFP

WI 912 - Docking and Undocking Vessel – Additional Days The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

TOTAL PROPOSED PRICE

TOTAL PROPOSED PRICE FOR CLIN 0001 THROUGH CLIN 0006 $______________

The contractor shall fill-in the total proposed price, above, by calculating the summation of each CLIN Amount.

CLAUSES INCORPORATED BY FULL TEXT

Section B - Supplies or Services and Prices

PART I - THE SCHEDULE

The contractor shall follow the instructions stated below when completing Section B:

CLIN 0001 – The contractor shall complete CLIN 0001 NET AMT, each of the fill-in items stated in the extended description, and complete Attachment J-2 – Category “A” Wis.

CLIN 0002: Indicate the Fully-Burdended Labor Rate (FBLR) (e.g., General and Administrative (G&A), Profit, Supervision, and/or support functions). This rate will be used in evaluating the contractor’s proposal and shall be the rate for pricing changes negotiated under the H-3 Clause - AGR, up to the maximum number of man-hours specified herein. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blasting

Tank cleaning

Welding

Machinists (inside and outside)

Burning

Brazing

Carpentry

Electrical Work

Electronic Work

Shipfitting

Lagging

Painting

Boilermaking

Pipefitting

Sheetmetal Work

Engineering

Rigging

Staging/scaffolding

General Labor

Fire Watch

Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are herein defined as support for production functions. Necessary support functions shall be considered to be included in the offeror's FLBR for direct production man-hours. Examples of support functions include:

Testing

Quality Assurance

Planning

Cleaning (except tank cleaning)

Material handling & Warehousing

Security

Surveying

Administration

Transportation

Purchasing staff

Lofting

Other indirect support

Supervision

CLIN 0003: The rates proposed for profit and G&A on CLIN 0003 above shall be the same rates used by the contractor in its responses to the Request For Proposal (RFP)s issued under this contract. The KO will apply these rates to the ODCs for each RFP when it is negotiated and settled.

The base cost does not include the profit or G&A rates. Include the final figure that results when proposed profit and G&A rates are applied to the base price of the contractor’s total price for evaluation purposes.

NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs should be included under CLIN 0001).

CLINs 0004 through 0006– The offeror shall complete CLIN 0004 through 0006 NET AMT, each of the fill-in items, and complete Attachment J-3 – Category “B” WIs.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

C – 2 List of Standard Work Items included for this solicitation:

WORK ITEM INDEX

SECTION 000

GENERAL REQUIREMENTS

NOT SEPERATELY PRICED (NSP) REQUIREMENTS

Intent, Scope, General Conditions and Definitions

Technical and Manufacturer’s Representatives

Approach, Berth, and Mooring Requirements

Testing and Quality Assurance Electrical Safety Procedure Requirements

Heavy Weather Plan

Cold Weather Plan

CATEGORY “A” WORK ITEMS

Furnish Office for Overhaul Management Team

Furnish General Services

Telephone Services

Project Planning and Production Status

Monitoring Reports

Preparation of Weight and Moment Report

Integrated Logistics and GFM Support Requirements

Fire Protection and Ship’s Safety Program

Handling of Ship Stores Delivery and Re-Delivery

Shipboard Access and Security Gas Free Certificates Clean and Gas Free Tanks, Voids, Cofferdams and Spaces

Dock Trials and Sea Trial

Hazardous Waste Disposal

CATEGORY “B” WORK ITEMS

Physical Security at Private Contractor’s Facility

Physical Security at Private Contractor’s Facility in Force Protection Conditions Bravo – Delta

Continuation of Services

Docking and Undocking Vessel

SECTION 100 Hull Structure

CATEGORY “A” WORK ITEMS

STBD Side Steel Renewal and Preservation of FR58 thru 66

Preservation of House and Catwalks

Preservation of SWB Tanks

Renewal of 02 Level Non Skid (FR58 FWD)

Ballast Tank Zinc Renewals

Tank Coatings (Food Waste and Gray Water)

Anchor Windless Gear Inspections and Operational Tests

Open and Inspect Tank Goosenecks

Deck and Bulkhead Cable Penetration Renewals

MMR Port and STBD Vent Plenum Door Installation TALT408

SECTION 200 Propulsion Machinery

CATEGORY “A” WORK ITEMS

Main Diesel Engine No. 2 15-20kHr Overhaul

Inspect MDG Flexible Couplings

MDG Exhaust Stack Insulation Repairs Main Diesel Generator Inspection and cleaning

Propulsion Motor Cleaning and Inspection

Ten Year Main Engine Flexible Hose Replacements SECTION 300 Electrical

CATEGORY “A” WORK ITEMS

HV-SS-E Switchboards Cleaning and Maintenance

HV Jumper Cable Replacements T-ALT428

SO2 Detector System Installation T-ALT404

LED M711 Fixture Install T-ALT353

SECTION 400 Communication and Navigation

CATEGORY “A” WORK ITEMS

ECDIS Upgrade to Vision Master FT T-ALT347

SECTION 500 AUXILIARY MACHINERY SYSTEMS

CATEGORY “A” WORK ITEMS

Counter Measure Wash-Down Pipe Replacements CR14-021

Chloropac Piping Repairs CR15-035

HP Air Union Replacements CR13-047

LTFW Cooler Cleaning and Gasket Change T-ALT426

HT FW Cooler Cleaning and Gasket Change T-ALT426

MARPOL Flange Installation T-ALT377

FireMain CORD Inspection and Repair

Vane Axial Fan Overhauls

House Fan Overhauls

Sewage Piping System Cleanout

AFFF Piping Replacement Main Deck - Cargo Hold 6 T-ALT279

Open and Inspect Potable Water Heaters

JP5 3000 GPM Pump Installation T-ALT294

FM Isolation Valve Install (AMR ONLY) T-ALT367

Propulsion Shaft Turning Gear Relocation T-ALT379

EVAP Distillate Dump Line Installation T-ALT328

Fire Pump Testing Overboard Piping Mod T-ALTXXX

Brine Pump Overhauls

HP Air Compressor Inspections

LTFW and Central SW Pump Motor Replacements T-ALTXXX

Industrial Services for SaWs T-ALT 439

SECTION 600 OUTFIT, FURNISHINGS and HABITABILITY

CATEGORY “A” WORK ITEMS

Galley Equipment Calibration

MSD System Groom

Lifeboat Gel Coat Preservation

RHIB Preservation

SECTION 800 HEATING, VENTILATION AND AIR CONDITIONING

CATEGORY “A” WORK ITEMS

Galley Exhaust Duck Cleaning

Laundry Exhaust Duct Cleaning

SECTION 900 DRYDOCKING AND UNDOCKING

CATEGORY “A” WORK ITEMS

Dry Docking and Undocking

Polish Bow Thruster Propeller and Repair Trash Bar

Propeller Shaft and Stern Tube Inspection W/AFT

FWD and AFT Stern Tube Seal Inspection and Overhaul

Zinc Renewals Sea Chests

Range/Paint Ground Tackle

Underwater Hull Cleaning and Painting

Freeboard cleaning and Painting

Bilge Keel Repairs (ABS)

Sea Valve Replacements

SECTION 1000 UNREP Gear

CATEGORY “A” WORK ITEMS

Renewal of Flight Deck and Hanger Deck Non-Skid

Windbird and Loadbank Recertification for NAVAIR

Relief Valve Calibration for UNREP Stations

(End of Summary of Changes)