SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "A" Work Items (WIs)
FFP
Prepare for and accomplish the Regular Overhaul/Dry-docking (ROH & DD) of the USNS AMELIA EARHART (T-AKE 6)
Total Category "A" WIs
Proposed unit price per KWh $_____ in accordance with (IAW) WI 011, 7.1.1.4 Proposed unit price per gallon of potable water $______ IAW WI 011, 7.1.3.2 Proposed unit price per gallon of distilled water $______ IAW WI 011, 7.1.4.2 Proposed unit price per gallon of bilge water removal $______ IAW WI 011, 7.1.18.7 Proposed unit price per crane usage $______ IAW WI 11, 7.9.1 Proposed Hazardous Waste handling fee rate IAW WI 023, 7.4 ______%
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Additional Government Requirements (AGR)
AGR
20,000 man-hours @ $________ per man-hour =
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Other Direct Costs (ODC)
ODC
Base $_1,000,000.00_
Proposed G&A Rate _______________%
Subtotal:
Proposed Profit Rate _______________%
Subtotal:
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 025 |
FFP
WI 025 - Physical Security at Private Contractor's Facility in Force Protection Conditions (FPCON) Bravo - Delta
The Contracting Officer (KO) will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 030 |
FFP
WI 030 - Continuation of Services
The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 912 |
FFP
WI 912 - Docking and Undocking Vessel – Additional Days The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.
NET AMT
TOTAL PROPOSED PRICE
TOTAL PROPOSED PRICE FOR CLIN 0001 THROUGH CLIN 0006 $______________
The contractor shall fill-in the total proposed price, above, by calculating the summation of each CLIN Amount.
CLAUSES INCORPORATED BY FULL TEXT
Section B - Supplies or Services and Prices
PART I - THE SCHEDULE
The contractor shall follow the instructions stated below when completing Section B:
CLIN 0001 – The contractor shall complete CLIN 0001 NET AMT, each of the fill-in items stated in the extended description, and complete Attachment J-2 – Category “A” Wis.
CLIN 0002: Indicate the Fully-Burdended Labor Rate (FBLR) (e.g., General and Administrative (G&A), Profit, Supervision, and/or support functions). This rate will be used in evaluating the contractor’s proposal and shall be the rate for pricing changes negotiated under the H-3 Clause - AGR, up to the maximum number of man-hours specified herein. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:
Abrasive cleaning/blasting
Tank cleaning
Welding
Machinists (inside and outside)
Burning
Brazing
Carpentry
Electrical Work
Electronic Work
Shipfitting
Lagging
Painting
Boilermaking
Pipefitting
Sheetmetal Work
Engineering
Rigging
Staging/scaffolding
General Labor
Fire Watch
Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are herein defined as support for production functions. Necessary support functions shall be considered to be included in the offeror's FLBR for direct production man-hours. Examples of support functions include:
Testing
Quality Assurance
Planning
Cleaning (except tank cleaning)
Material handling & Warehousing
Security
Surveying
Administration
Transportation
Purchasing staff
Lofting
Other indirect support
Supervision
CLIN 0003: The rates proposed for profit and G&A on CLIN 0003 above shall be the same rates used by the contractor in its responses to the Request For Proposal (RFP)s issued under this contract. The KO will apply these rates to the ODCs for each RFP when it is negotiated and settled.
The base cost does not include the profit or G&A rates. Include the final figure that results when proposed profit and G&A rates are applied to the base price of the contractor’s total price for evaluation purposes.
NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs should be included under CLIN 0001).
CLINs 0004 through 0006– The offeror shall complete CLIN 0004 through 0006 NET AMT, each of the fill-in items, and complete Attachment J-3 – Category “B” WIs.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List of Standard Work Items included for this solicitation:
WORK ITEM INDEX
SECTION 000
GENERAL REQUIREMENTS
NOT SEPERATELY PRICED (NSP) REQUIREMENTS
Intent, Scope, General Conditions and Definitions
Technical and Manufacturer’s Representatives
Approach, Berth, and Mooring Requirements
Testing and Quality Assurance Electrical Safety Procedure Requirements
Heavy Weather Plan
Cold Weather Plan
CATEGORY “A” WORK ITEMS
Furnish Office for Overhaul Management Team
Furnish General Services
Telephone Services
Project Planning and Production Status
Monitoring Reports
Preparation of Weight and Moment Report
Integrated Logistics and GFM Support Requirements
Fire Protection and Ship’s Safety Program
Handling of Ship Stores Delivery and Re-Delivery
Shipboard Access and Security Gas Free Certificates Clean and Gas Free Tanks, Voids, Cofferdams and Spaces
Dock Trials and Sea Trial
Hazardous Waste Disposal
CATEGORY “B” WORK ITEMS
Physical Security at Private Contractor’s Facility
Physical Security at Private Contractor’s Facility in Force Protection Conditions Bravo – Delta
Continuation of Services
Docking and Undocking Vessel
SECTION 100 Hull Structure
CATEGORY “A” WORK ITEMS
STBD Side Steel Renewal and Preservation of FR58 thru 66
Preservation of House and Catwalks
Preservation of SWB Tanks
Renewal of 02 Level Non Skid (FR58 FWD)
Ballast Tank Zinc Renewals
Tank Coatings (Food Waste and Gray Water)
Anchor Windless Gear Inspections and Operational Tests
Open and Inspect Tank Goosenecks
Deck and Bulkhead Cable Penetration Renewals
MMR Port and STBD Vent Plenum Door Installation TALT408
SECTION 200 Propulsion Machinery
CATEGORY “A” WORK ITEMS
Main Diesel Engine No. 2 15-20kHr Overhaul
Inspect MDG Flexible Couplings
MDG Exhaust Stack Insulation Repairs Main Diesel Generator Inspection and cleaning
Propulsion Motor Cleaning and Inspection
Ten Year Main Engine Flexible Hose Replacements SECTION 300 Electrical
CATEGORY “A” WORK ITEMS
HV-SS-E Switchboards Cleaning and Maintenance
HV Jumper Cable Replacements T-ALT428
SO2 Detector System Installation T-ALT404
LED M711 Fixture Install T-ALT353
SECTION 400 Communication and Navigation
CATEGORY “A” WORK ITEMS
ECDIS Upgrade to Vision Master FT T-ALT347
SECTION 500 AUXILIARY MACHINERY SYSTEMS
CATEGORY “A” WORK ITEMS
Counter Measure Wash-Down Pipe Replacements CR14-021
Chloropac Piping Repairs CR15-035
HP Air Union Replacements CR13-047
LTFW Cooler Cleaning and Gasket Change T-ALT426
HT FW Cooler Cleaning and Gasket Change T-ALT426
MARPOL Flange Installation T-ALT377
FireMain CORD Inspection and Repair
Vane Axial Fan Overhauls
House Fan Overhauls
Sewage Piping System Cleanout
AFFF Piping Replacement Main Deck - Cargo Hold 6 T-ALT279
Open and Inspect Potable Water Heaters
JP5 3000 GPM Pump Installation T-ALT294
FM Isolation Valve Install (AMR ONLY) T-ALT367
Propulsion Shaft Turning Gear Relocation T-ALT379
EVAP Distillate Dump Line Installation T-ALT328
Fire Pump Testing Overboard Piping Mod T-ALTXXX
Brine Pump Overhauls
HP Air Compressor Inspections
LTFW and Central SW Pump Motor Replacements T-ALTXXX
Industrial Services for SaWs T-ALT 439
SECTION 600 OUTFIT, FURNISHINGS and HABITABILITY
CATEGORY “A” WORK ITEMS
Galley Equipment Calibration
MSD System Groom
Lifeboat Gel Coat Preservation
RHIB Preservation
SECTION 800 HEATING, VENTILATION AND AIR CONDITIONING
CATEGORY “A” WORK ITEMS
Galley Exhaust Duck Cleaning
Laundry Exhaust Duct Cleaning
SECTION 900 DRYDOCKING AND UNDOCKING
CATEGORY “A” WORK ITEMS
Dry Docking and Undocking
Polish Bow Thruster Propeller and Repair Trash Bar
Propeller Shaft and Stern Tube Inspection W/AFT
FWD and AFT Stern Tube Seal Inspection and Overhaul
Zinc Renewals Sea Chests
Range/Paint Ground Tackle
Underwater Hull Cleaning and Painting
Freeboard cleaning and Painting
Bilge Keel Repairs (ABS)
Sea Valve Replacements
SECTION 1000 UNREP Gear
CATEGORY “A” WORK ITEMS
Renewal of Flight Deck and Hanger Deck Non-Skid
Windbird and Loadbank Recertification for NAVAIR
Relief Valve Calibration for UNREP Stations
(End of Summary of Changes)