1001_A__Flight_Deck_ONLY_Nonskid_Renewal.doc

DOC document 64 KB Posted

Attached to
ROH/DD of USNS AMELIA EARHART
Solicitation number
N32205-16-R-4301
Issued by

About this file

Revised Drawing

View the file

Other files

File Type Posted
FEV_001_O_01_X_ASB.PDF PDF
0501_A_CMWD_Pipe_Replacement_(Zone_1)_Revised.doc DOC document
J_-_2_Category_A_Items_FPR.xls XLS spreadsheet
FEV_002_O_01_X_ASB.PDF PDF
N32205-16-R-4301_Amendment_0005.doc DOC document
FEV_004_O_01_X_ASB.PDF PDF
FEV_003_O_01_X_ASB.PDF PDF
J-A_-_ROH-DD_FY16_USNS_AMELIA_EARHART_TAKE6_redacted_Redacted.pdf PDF
RFP_QandA_No__5_EARHART_16-R-4301.docx DOCX document
N32205-16-R-4301_Amendment_0004.doc DOC document
N32205-16-R-4301_Amendment_0003.doc DOC document
RFP_QandA_No__4_EARHART_16-R-4301.docx DOCX document
J_-_2_Category_A_Items_REV._1.xls XLS spreadsheet
0401_A__ECDIS_Replacement_TALT347_REV2.doc DOC document
RFP_QandA_No__3_EARHART_16-R-4301.docx DOCX document
N32205-16-R-4301_Amendment_0002.doc DOC document
IMG_2910_(800x600).jpg JPG image
IMG_2904_(800x600).jpg JPG image
IMG_2908_(800x600).jpg JPG image
IMG_2836_(800x600).jpg JPG image
IMG_2911_(800x600).jpg JPG image
IMG_2905_(800x600).jpg JPG image
IMG_2903_(800x600).jpg JPG image
IMG_2835_(800x600).jpg JPG image
IMG_2907_(800x600).jpg JPG image
IMG_2906_(800x600).jpg JPG image
IMG_2832_(800x600).jpg JPG image
RFP_QandA_No._2_EARHART_16-R-4301.docx DOCX document
AME_PLC_Index.xls XLS spreadsheet
IMG_2834_(800x600).jpg JPG image
IMG_2833_(800x600).jpg JPG image
Batteries_PLCs_and_UPS.xls XLS spreadsheet
N32205-16-R-4301_Amendment_0001.doc DOC document
RFP_QandA_No._1_EARHART_16-R-4301.docx DOCX document
J_-_12_Past_Performance_Data.doc DOC document
J_-_2_Category_A_Items.xls XLS spreadsheet
USNS_AMELIA_EARHART_J-4.xls XLS spreadsheet
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
N32205-16-R-4301.doc DOC document
J_-_3_Category_B_Items.xls XLS spreadsheet
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_6_WI_015_CDRL.pdf PDF
J_-_10_Interport_Differential_West_Coast.doc DOC document
J_-_11_Dry_Dock_Evaluation_Form.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS AMELIA EARHART

(T-AKE 6)

UNREP GEAR

N33205-16-R-4301

24 DECEMBER 2015

ITEM NO. 1001

Category "A"

MSC PM6/SA

Flight Deck NONSKID RENEWAL

1.0 ABSTRACT:

1.1 This item describes removal and reinstallation of the non-skid surface from the Flight Deck and installation of deck markings to be applied to the Flight Deck. In addition, preservation of the Flight Deck Hatches shall be accomplished.

2.0 REFERENCES:

2.1 Naval Ships’ Technical Manual (NSTM) Chapter 634 Deck Coverings

2.2 Naval Air Warfare Center, Visual Landing Aids Installation TAK(E) Class Ships – 627928

2.3 Surface Preparation Standard No. 10 (SSPC-SP-10) of the steel structures painting council manual.

2.4 Surface Preparation Standard SSPC-SP11, Power Tool Cleaning To Bare Metal.

2.5 Air Capable Ship Aviation Facilities Bulletin No. 1K.

2.6 Surface Preparation Standard, SSPC-SP-12/NACE 5, Surface Preparation and Cleaning of Metals by Water jetting Prior to Recoating.

2.7 NAVSEA Dwg 588-7488997 (H), Aviation Support Facilities.

2.8 Flight Deck Hatch DWG TIMSA TAKE.

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantity

3.1.1 Flight Deck; 12,000 Sqft, Main Deck.

Note:

Areas are approximate and quantified from General Arrangement drawings. Contractor must verify the actual square footage during bidder's survey.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 The following coating materials will be Government furnished:

4.1.1 Amercoat 137 Epoxy(buff)1st prime

83 gal

4.1.2 Amercoat 137 (dk Gray)-1st stripe

5 gal

4.1.3 Amercoat 137 (buff)-2nd stripe

5 gal

4.1.4 Amercoat 137 (dk gray)-2nd prime

83 gal

4.1.5 Amercoat 138G Ty 1 (dk gray)-non skid 720 gal

4.1.6 Amercoat 240 (dk gray)-Trim/edges

12 gal

4.1.7 Amercoat 229T (white)-markings

18 gal

4.1.8 Amercoat 229T (red)-markings

2 gal

4.1.9 Amercoat T-10(solvent for 137 & 138G)

7 gal

4.1.10 Amercoat 65 (Solvent for 229T)

2 gal

4.2 Government Furnished Services (GFS):

4.2.1 PPG Coating Representative

4.2.2 NAVAIR Representative

5.0 NOTES:

5.1 The Contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this Work Item. In performance of this Work Item, the Contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s.

5.2 The Government will have paint Representative on site to provide technical assistance, accomplish inspections and provide advice to the MSCREP. It is the Contractor’s responsibility to notify the paint Representative and MSCREP for all inspections.

5.3 This ship contains High Voltage (HV) electrical systems. The contractor and subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a contractor or subcontractor approach, work on, or enter a High Voltage area with out proper authorization.

5.4 THE USNS TAKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK AND WHITE. THE CONTRACTOR SHALL ASSUME ALL ELECTRICAL CABLES ARE HOT UNTIL TESTED OTHERWISE. THE CONTRACTOR SHALL TEST ALL ELECTRICAL CABLES TO ENSURE THEY ARE DEAD PRIOR TO WORKING ON THE ITEM

5.5 The Government will have a NAVAIR Representative on site to provide technical assistance, accomplish inspections and provide advice to the MSCREP.

5.6 Flight Deck markings shall be chalked-in, inspected and approved by the attending NAVAIR Representative prior to painting of the new markings.

5.7 The boundaries of this work item shall be;

5.7.1 Flight Deck; all non-skid surfaces, up bulkhead surfaces 6”, surfaces up to and beyond the fish plate to ships hull plating, including surface below the perimeter lighting and Flight Deck Hatches (2ea).

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1 WORK AREA PREPARATION:

7.1.1 Prior to start of work, the Contractor shall witness ships force conducting operational testing of all flight deck aviation electronic and electrical gear, lighting, perimeter lights, recessed deck lights, flood and spot lights, including sprinklers, in the vicinity of flight deck areas identified for work, to demonstrate satisfactory operation. The Contractor and Ships Force shall document performance of test results noting “as-found” conditions. All deficiencies shall be submitted to the Port Engineer for review.

7.1.2 Provide and erect all necessary staging required for proper working conditions and inspections.

7.1.3 Provide and maintain adequate lighting of a suitable nature during the course of all surface preparation, coating and inspection activities.

7.1.4 Remove, store and re-install interferences as required to accomplish the work specified.

7.1.5 Temporarily install drop cloths, masking, division shields, seals, blanks and filtering materials to prevent abrasives and foreign substances from entering lights, machinery, piping, hatches/scuttles, fork truck guards, deck drains, ventilation systems, tank vents, valve stems, motor shafts, seals and temporary openings during blasting and painting operations.

7.1.6 Prior to initiating surface preparation, the Contractor shall ensure the vessels equipment is protected from damage caused by blasting, water jetting, dirt, dust, paint or other foreign matter. Measures to be taken but are NOT limited to are:

7.1.6.1 Plug open ends of pipes, vents, and ducts. (vents shall not be plugged without ship’s force approval)

7.1.6.2 Wrap all valve stems and exposed portions of hydraulic cylinders. Install filters, if required, on all air intake vents. Install covers on all fuel tank vents.

7.1.6.3 In areas to be abrasive blasted or water-jetted and coated, record all ships markings, including information size and color.

7.1.6.4 Install protective coverings on all port-lights, windows, light globes and landing light lenses to prevent damage to inadvertent water-jetting or other means of non-skid removal.

7.1.6.5 Mask all normally unpainted surfaces.

7.1.6.6 Protect running rigging (cargo falls, lifts, cranes, etc.) and mooring lines which cannot be stowed or removed for the duration of non-skid removal.

7.1.6.7 Sprinklers shall be covered with sheet metal disks to prevent damage during surface preparation and coating.

7.1.6.8 Prove all deck drains on Flight Deck and Hanger Deck are free and clear in the presence of a Port Engineer before non-skid removal.

7.1.7 Prior to the start of productive work, protective coverings shall be inspected and approved by the MSC Port Engineer.

7.1.8 Deficiencies noted during this inspection shall be corrected and the Port Engineer shall be given the opportunity to inspect and approve the corrective measures before work begins. Protective covering shall be inspected at regular intervals, but not less than the start of each work shift. Degraded covering shall be repaired prior to restart of work.

7.1.9 Contamination of the vessel and its equipment shall be reported to the Port Engineer verbally immediately upon discovery. The Contractor shall be responsible for cleaning the contaminated equipment and showing that the contamination has not caused damage. Cost to repair equipment damage due to contamination shall be the Contractor's responsibility.

7.1.10 Prior to paint application all helo tie downs shall be measured in accordance with NAVAIR requirements. A condition report shall be generated reporting the condition found. It is anticipated that all tie downs are within specification. No paint application shall be applied to tie downs not meeting requirements until they can be corrected.

7.2 Flight Deck Hatches with scuttles:

7.2.1 Remove Port and Stbd flight deck hatches for complete restoration. Reference 2.8 shall be used as guidance. Components were applicable, shall be blasted to bare white metal before PPG coating system is applied.

7.2.2 Contractor shall completely disassembly hatch, visually inspect for the following and submit a “as found” Condition Report;

7.2.2.1.1 Visually inspect hatch structure as well as scuttle for excessive corrosion and/or deterioration of steel. Hatch replacement steel shall be ASTM A36 or equivalent.

7.2.2.1.2 Visually inspect leading edge mating with gasket on flight deck. Leading edge must meet final hose tests. ABS and MSC Rep to witness.

7.2.2.1.3 Visually inspect the cables and fasteners securing the hatch as counterbalance.

7.2.2.1.4 Visually inspect all springs for excessive corrosion, cracks, or deformation.

7.2.2.1.5 Visually inspect all linkages for corrosion, cracks, and deformation.

7.2.2.1.6 Visually inspect adjusting bolts for excessive corrosion, stripped threads, and cracks. Lubricatant shall be provided by SF.

7.2.2.1.7 Disassembly dog latched and inspect for excessive corrosion and wear.

7.2.2.1.8 Excessively worn, deteriorated, and / or severely corroded fasteners (self-locking nuts and screws) are not acceptable.

7.2.2.1.9 Replace neoprene gaskets (2ea, pc 23 of reference 2.8).

7.2.2.1.10 Replace SS drain flex hose (4ea, pcs 84, 87, 87 of reference 2.8), drain fittings (as req’d). A final drain and hose test shall be met and witnessed by ABS and MSC Rep.

7.2.2.1.11 PPG Painting system shall be applied prior to reassembly.

7.2.2.1.12 Reassemble flight deck hatches shipboard, adjust, and align. Perform operational test, ABS and MSC Rep shall witness.

7.2.2.1.13 Ships Force shall provide all lubricants.

7.3 SURFACE PREPARATION:

7.3.1 Areas to be surface prepared for coating shall include:

7.3.1.1 The entire flight deck from the top of the coaming and beyond the fish plate to the horizontal edges, vertically 6" up on all bulkheads. Includes all structure inside this perimeter.

7.3.1.2 The hanger and truck tunnel door troughs and grating.

7.3.2 Accomplish the requirements of SSPC, Protective Coating Society (formerly the Steel Structures Painting Council) SSPC-SP1, Solvent Cleaning, using biodegradable detergent to remove all oil, grease, dirt and soluble salts from the surface of the specified decks.

7.3.3 Final wash-down shall be made with clean, fresh water at 2,500 to 3,000 psi. Upon completion of all water washing chloride testing shall be performed at a rate of no less than one (1) test per 500 Square Feet of surface.

7.3.4 If contamination is found, additional water wash shall be performed. Additional tests shall be made as necessary to determine the extent of contamination and to prove the success of remediation. The maximum allowable contamination concentrations shall be less than 10 ug/cm2 of chloride contaminants, less than 15 ug/cm2 of soluble ferrous ion levels and less than 20 ug/cm2 of soluble sulfate contaminates as determined by field or laboratory analysis using reliable, reproducible test equipment.

7.3.5 Vacuum blast the entire deck areas including deck tie down fittings to a SSPC-SP-10 Near White Metal with a 2-4 mil surface profile.

7.3.6 Blasting material recovery shall meet the local pollution control district regulations.

7.3.7 All areas being vacuum blasted may, with the COR approval, be prepared using ultra high pressure water jetting in lieu of vacuum blasting at no additional cost to the Government. If allowed, water jetting shall be performed in accordance with SSPC-SP12/NACE 5. All water jetted areas shall be prepared to a WJ-2 Condition. Non-visible surface cleanliness shall meet the definitions of NV-2 in Table A1. No more than a light (L) grade flash rust shall be allowed on the steel at the time of coating application. If heavier flash rust is present, the surface shall be pressure washed at 2,500 to 3,000 PSI and allowed to air dry in order to restore the surface to a paint-able condition.

7.3.8 Open abrasive blasting will not be permitted.

7.3.9 Accomplish the requirements of SSPC-SP-11 Power Tool Clean to Bare Metal those areas inaccessible to the vacuum-blast machines and approximately 6 inches up all vertical surfaces of bulkheads, deck houses, foundations, fan housings, and other appendages in way of the aforementioned areas to bare metal. Ensure a minimum profile of 1 mil in way of power tool cleaned areas.

7.3.10 The roller door trough grading shall be removed from the ship and taken to the shop for grit blasting to white metal.

7.3.11 Regardless whether the surfaces are abrasive blasted or UHP Water Jetted, immediately prior to coating the surface shall be re-tested for non-visual surface contaminates at a rate of no less than one (1) test per 1,000 SF of prepared area. If contamination is found, additional tests shall be made as necessary to determine the extent of contamination and to prove the success of re-mediation. The maximum allowable contamination concentrations for dry abrasive blasted surfaces shall be less than 10 ug/cm2 of chloride contaminants, less than 15 ug/cm2 of soluble ferrous ion levels and less than 20 ug/cm2 of soluble sulfate contaminates as determined by field or laboratory analysis using reliable, reproducible test equipment. Results of this testing shall be presented to the COR and his paint representative at time of inspection for coating application. For UHP water jetted surfaces the requirements of Table A1, NV-2 shall apply.

7.3.12 The surfaces shall be inspected and approved by the Paint Rep. and a MSC Port Engineer prior to the application of each coat of paint or primer.

7.4 COATING APPLICATION:

7.4.1 No coating shall be applied until the Paint Rep and MSFSC Port Engineer have approved the coating curing time and surface preparation.

7.4.2 All coatings shall be applied in accordance with the manufacturers recommendations. This includes temperature, humidity, and cure time limitations.

7.4.3 PRIMER - Apply the following primer to blasted and power tool cleaned surfaces:

-One (1) full coat of Amercoat 137, (buff) at 5-6 mils DFT.

-One (1) stripe coat of Amercoat 137, (dark gray) at 2-3 mils DFT

-One (1) stripe coat of Amercoat 137, (buff) at 2-3 mils DFT

-One (1) full coat of Amercoat 137, (dark gray) 5-6 mill DFT

7.4.3.1 Stripe coats shall be applied to all weldments, crevices, corners, edges treads, pitted surfaces, tie-downs and other areas not conducive to proper coverage. Stripe coats shall extend a minimum of 1" from each edge of the area being stripe coated. SSPC-PA1, Paint Application Specification No 1 shall be used for guidance in stripe coating

7.4.4 NON-SKID - Apply one coat of Amercoat 138G Non-Skid.

7.4.4.1 Apply non-skid at a rate of approximately 30 square feet per gallon to primed deck surfaces with a napless, phenolic roller.

7.4.4.2 Non-skid brush and spray applications are not allowed.

7.4.4.3 Non-skid application shall present a uniform “plowed field” appearance with uniform ridges 1/16” to 3/32” high and a minimum of 30 mils in the troughs between peaks.

7.4.4.4 Non-skid in way of longitudinal weld seams shall be rolled such that the ridges are perpendicular to the weld seam from a distance of three to six inches either side of the weld.

7.4.4.5 Do not thin Amercoat 138G non skid. For equipment clean-up or solvent wiping of a deck surface before applying the non-skid use Solvent Amercoat T-10.

7.4.4.6 Before the start of production application of any non-skid coating, a test patch will be applied. This test patch will be agreeable to the MSCREP, the Navair Rep and manufacturer's representative and will stand as a "texture and profile" standard for the entire job.

7.4.4.7 Non-skid shall be applied to within approximately 2” of all deck fittings and protrusions and approximately 5” off deck coaming and edges.

7.4.5 EDGES AND TRIM - Borders around the deck edge, around foundations, tie downs, trough area, and other areas that normally do not receive non skid coating shall be top-coated with one coat of Amercoat 240 (dark gray), 5-6 mils DTF.

7.4.6 Vertical surfaces shall the top-coated to match the surrounding area. Dado lines shall be cut in straight, level and even.

7.4.7 HANGER DOOR TROUGH GRATING - In shop, spray the hanger door trough grating with at least two coats of Amercoat 240 (dark gray). Each coat should be min of 5-6 mils DFT, for a total of at least 10 mils DFT.

7.5 DECK MARKINGS:

7.5.1 Lay out the original Flight Deck markings using Reference 2.2 and 2.7 as a guide.

7.5.2 Prior to painting the Flight Deck markings shall be approved by the NAVAIR representative.

7.5.3 Flight Deck markings:

7.5.3.1 One coat Amercoat 229T (White) at 2-3 mils DFT.

7.6 Manufacturer's Representative:

7.6.1 A Coating technical representative will be in attendance, on the government's account, to observe the surface preparation and coating application and to advise the MSC Port Engineer as to the quality and the appropriateness of the contractor's efforts.

7.6.2 A NAVAIR Representative, to the governments account, shall attend the vessel to inspect the alignment and painting of the deck markings and the profile of non-skid for conformance to NAVAIR regulations. The contractor shall provide a minimum of 48 hours advance notice to the MSC Port Engineer in order to arrange attendance of the NAVAIR Representative.

8.0 GENERAL REQUIREMENTS: None additional.

1001 - 1

File details come from the government source that posted it. Updated .