N00421-16-R-0006_(Final_RFP).docx
DOCX document 296 KB Posted
- Attached to
- Final RFP - Program Management, Engineering and Technical Support Services for Power and Propulsion Department (AIR 4. 4) Federal contract opportunity
- Solicitation number
- N00421-16-R-0006
About this file
Final RFP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N00421-16-R-0006-0002.docx | DOCX document | |
| N00421-16-R-0006-0001.docx | DOCX document | |
| Attachment_P5_Past_Performance_Questionnaire_Package_for_Services.doc | DOC document | |
| P7_-_CPARS_UPDATE_QUESTIONNAIRE.doc | DOC document | |
| Attachment_P4_-_Past_Performance_Information_Sheet.docx | DOCX document | |
| Attachment_J1_Organizational_Conflict_of_Interest_List.docx | DOCX document | |
| Attachment_P2_Workforce_Hour_Matrix_(2).xls | XLS spreadsheet | |
| N00421-16-R-0006_CDRLS_A001-A007.doc | DOC document | |
| Attachment_P4_Past_Performance_Matrix.doc | DOC document | |
| Attachment_P1_Workforce_Qualifications.xls | XLS spreadsheet | |
| Attachment_P5_Past_Performance_Questionnaire_Package_for_Services.doc | DOC document | |
| Attachment_P6_CLIN_Breakout_spreadsheet_N00421-16-R-0006.xlsx | XLSX spreadsheet | |
| N00421-16-R-0006.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-16-R-0006
Section A - Solicitation/Contract Form
GENERAL INFORMATION
Points of Contact:
Jeffrey S. Boyce Contract Specialist Code 2.5.1.7.4
(301) 757-0015 Jeffrey.s.boyce@navy.mil
Rebecca J. Wathen Contracting Officer Code 2.5.1.7
(301) 757-0013 Rebecca.wathen@navy.mil
1. The Contract is for a total period of performance of five (5) years (Base year plus four (4) one-year options.)
2. This includes Cost Plus Fixed Fee (CPFF) Level of Effort (LOE) contract line item numbers (CLINs) for labor and cost reimbursement (no fee) CLINs for Other Direct Costs (ODCs), including material and travel.
3. Funding for each CLIN will be obligated at the sub-CLIN level.
4. The contractor will not be authorized to access any classified information under this contract unless a DD Form 254 is incorporated.
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
4.4 Labor (RDT&E)
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
FOB: Destination
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
4.4 Labor (O&MN)
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
4.4 Labor (AP(N))
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
4.4 Labor (NWCF)
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Travel in support of CLINs 0001-0004
COST
Travel in support of Program Management, Engineering and Technical Support Services.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Materials in Support of CLINs 0001-0004
Materials in support of Program Management, Engineering and Technical Support Services.
PURCHASE REQUEST NUMBER: 1300387768
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Technical Data CLINs 0001-0004
*NOT SEPARATELY PRICED* Technical Data in accordance with CDRLs in support of Engineering and Technical Services.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (RDT&E) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (O&MN) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (AP(N)) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (NWCF) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Travel in support of CLINs 0101-0104 |
COST
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Materials in Support of CLINs 0101-0104 |
COST
Materials in support of Program Management, Engineering and Technical Support Services.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Technical Data CLINs 0101-0104 |
COST
*NOT SEPARATELY PRICED* Technical Data in accordance with CDRLs in support of Engineering and Technical Services.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (RDT&E) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (O&MN) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (AP(N)) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (NWCF) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Travel in support of CLINs 0201-0204 |
COST
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Materials in Support of CLINs 0201-0204 |
COST
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Technical Data CLINs 0201-0204 |
COST
*NOT SEPARATELY PRICED* Technical Data in accordance with CDRLs in support of Engineering and Technical Services.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (RDT&E) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (O&MN) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (AP(N)) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (NWCF) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Travel in support of CLINs 0301-0304 |
COST
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Materials in Support of CLINs 0301-0304 |
COST
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Technical Data CLINs 0301-0304 |
COST
*NOT SEPARATELY PRICED* Technical Data in accordance with CDRLs in support of Engineering and Technical Services.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (RDT&E) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (O&MN) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (AP(N)) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 Labor (NWCF) |
CPFF
Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Travel in support of CLINs 0401-0404 |
COST
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Materials in Support of CLINs 0401-0404 |
COST
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Technical Data CLINs 0401-0404 |
COST
*NOT SEPARATELY PRICED* Technical Data in accordance with CDRLs in support of Engineering and Technical Services.
ESTIMATED COST
CLAUSES INCORPORATED BY FULL TEXT
| 5252.211-9503 | LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR)(DEC 2012) - ALT I (JUN 2013) |
| (a) The level of effort estimated to be ordered during the term of this contract is 209,080 man-hours of direct labor including authorized subcontract labor, if any. The estimated composition of the total man-hours of direct labor by classification is as follows: |
| Location |
| BASE |
| OY 1 |
| OY 2 |
| OY 3 |
| OY 4 |
| Total |
| Labor Category |
| On / Off |
| Hours |
| Hours |
| Hours |
| Hours |
| Hours |
| Hours |
| Senior Program Manager * |
| Off-site |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 9600 |
| Training Specialist III * |
| On-site |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 9600 |
| Engineer/Scientist V * |
| On-Site |
| 7680 |
| 7680 |
| 7680 |
| 7680 |
| 7680 |
| 38,400 |
| Engineer/Scientist V |
| Off-Site |
| 7710 |
| 7710 |
| 7710 |
| 7710 |
| 7710 |
| 38,550 |
| Engineer/Scientist IV |
| On-Site |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 9600 |
| Engineer/Scientist IV |
| Off-site |
| 9630 |
| 9630 |
| 9630 |
| 9630 |
| 9630 |
| 48,150 |
| Engineer/Scientist III |
| On-site |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 9600 |
| Senior Engineering Tech V |
| Off-site |
| 4300 |
| 4300 |
| 4300 |
| 4300 |
| 4300 |
| 21,500 |
| Senior Engineering Tech VI * |
| Off-site |
| 3840 |
| 3840 |
| 3840 |
| 3840 |
| 3840 |
| 19,200 |
| Systems Analyst |
| Off-site |
| 1296 |
| 1296 |
| 1296 |
| 1296 |
| 1296 |
| 6480 |
TOTAL
| 41,816 |
| 41,816 |
| 41,816 |
| 41,816 |
| 41,816 |
| 209,080 |
* denotes Key Personnel labor categories
| (b) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22. | |
| (c) It is agreed that while the contractor's performance during the period set forth in paragraph (a) above is based upon an anticipated level of effort consisting of man-hours of direct labor (as may be described or defined elsewhere herein), such level of effort may fluctuate, either upward or downward, by no more than ten (10%) percent of the total anticipated man-hours. This fixed fee is agreed to be paid for man-hours expended from ninety (90%) percent to one hundred ten (110%) percent of the total anticipated man-hours. The fixed fee shall not vary with the cost of the actual effort supplied within this range. In the event that less than ninety (90%) percent of the anticipated level of effort is actually expended by the expiration date of the contract, the Government shall have the option of: | |
| (1) requiring the contractor to continue to perform until the level of effort expended equals ninety (90%) percent of the anticipated level of effort; or | |
| (2) effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than ninety (90%) percent of the anticipated level of effort. | |
| (d) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations. |
Section C - Descriptions and Specifications
STATEMENT OF WORK
STATEMENT OF WORK
Program Management, Engineering and Technical Support Services For Propulsion and Power Department (AIR-4.4)
1.0 SCOPE
This Statement of Work (SOW) sets forth the requirements for the Contractor to provide program management, engineering, and technical support services for the Propulsion and Power Department (AIR-4.4).
1.1 BACKGROUND
AIR-4.4 is the lead activity for research, systems engineering and integration, engineering analysis and evaluation, test and evaluation, and in-service engineering support of naval air propulsion and power systems, including:
• Air breathing engines (except for ramjets) and engine integration for manned and unmanned aircraft and missiles
• Auxiliary, secondary and emergency power systems
• Helicopter transmissions and drive systems
• Aircraft and engine fuel systems, and ground refueling systems
• Fuel, oil and greases for propulsion system engines, gearboxes, propellers and transmissions
• Propulsion system performance
2.0 RESERVED
1. GENERAL REQUIREMENTS
The following describes the types of efforts (functional areas) to be performed in support of this acquisition. The contractor shall make available personnel to Propulsion and Power Department at the level of effort set within this contract and shall perform the tasks set forth below:
3.1 PROGRAM MANAGEMENT SUPPORT
(CLINs 0004, 0104, 0204, 0304, 0404) (NWCF Funded)
The contractor shall provide program management support to the Navy’s Propulsion and Power Department for propulsion efforts. Typical tasks will include:
3.1.1 Monitor programs within the Propulsion and Power Department to cost, schedule, business, and performance standards.
3.1.2 Maintain an interface with the COR in order to understand objectives and milestones.
3.1.3 Provide requirements analysis, systems analysis, requirements integration, system development, implementation, training, monitoring, and metrics development for propulsion and power systems in the areas of critical items management and competency training. The contractor shall review and input data into databases for various members of the competency and Integrated Program Team (IPT). The contractor will ensure timely transfer of information in accordance with IPT requirements.
3.1.4 Provide strategic planning, business development and marketing services for Navy propulsion and power test and evaluation facilities, products and services. The contractor will develop strategic planning documents, identify and track potential business targets, qualify opportunities, develop business and capture plans, identify teaming opportunities, attend customer meetings, participate in marketing initiatives and proposal development, and post proposal follow-up.
3.1.5 Develop and review process standards in accordance with applicable instructions and guidance documents.
3.1.6 Track projects and budgets; prepare financial reports, and track contract status.
3.1.7 Provide typing/word processing and maintain office files, records and instructions.
CDRLS: A001, A002, A004, A005
3.2 INTEGRATED PROGRAM TEAM SUPPORT
(CLINs 0001, 0101, 0201, 0301, 0401) (RDT&E Funded)
The contractor shall provide integrated program team support to the Navy’s Propulsion and Power Department for propulsion efforts involving research, development, test and evaluation. Tasks will include:
3.2.1 Review detailed design documents to evaluate quality assurance aspects of proposed Naval and Marine Corps aircraft propulsion and power systems installation designs and implementation approaches.
3.2.2 Contribute inputs during the development of test plans, methods and procedures for the evaluation of aircraft propulsion and power systems.
3.2.3 Provide engineering support for the Engine Reliability Assessment Program (ERAP). The contractor will provide engineering assistance to update the model with current fleet data and assess the accuracy of the information being received from other databases. The contractor will ensure that the interface programs can communicate with modified government logistics databases.
3.2.4 The contractor will provide engineering support in the development of reliability metrics for Propulsion and Power subsystems such as auxiliary power units (APU’s), starters, generators and electrical systems. This effort may require the development of interface software to assess accuracy of data and support future trending efforts.
3.2.5 The contractor will provide technical experts in the areas of failure analysis and components such as bearing and gearbox to support testing and development in the Propulsion Systems Evaluation Facility (PSEF).
3.2.6 Monitor and inspect in-process fabrication, assembly and installation processes of propulsion and power systems to ensure quality of workmanship and conformance with applicable standards and specifications.
3.2.7 Monitor and investigate adverse trends affecting developmental Naval and Marine Corps aircraft propulsion and power systems quality, reliability and basic mission performance.
3.2.8 Perform inspections of Naval and Marine Corps aircraft to support quality assurance programs.
3.2.9 Conduct technical assessments of advanced technology air breathing propulsion and power components and systems in terms of performance, technical risk, soundness of design, and cost.
3.2.10 Perform engineering evaluations of structural data submitted by the Original Equipment Manufacturer (OEM). Analyzing advanced component structures, coatings, and cooling schemes and identity promising technologies to pursue.
3.2.11 Develop requirements document and test plans for engine oil ratio test and endurance test; analyzing test and failure data to determine cause and mode of failure; recommending composite test plan including all weather propeller test performance mapping test, oil ratio test and endurance test.
3.2.12 Conduct particle analysis of oil debris generated from testing facility components to include weight measurement, Scanning Electron Microscope (SCM) and X-ray diffraction analysis.
3.2.13 Provide engineering support in the areas of design, operational performance, structural integrity, alternate part suitability, failure investigation and analysis, testing and data analysis for all Navy turbofan, turboprop, turboshaft, and reciprocating engines.
3.2.14 Evaluate fuel lubricity and low temperature fuel properties, provide process for handling and disposal of contaminated wastewater, and evaluating fuel “freezing” and low temperature viscosity effects on aircraft/engine performance.
3.2.15 Develop the testing method and data necessary to correlate various tests into a useable protocol to evaluate fuels to coke in laboratory test with its actual installed aircraft performance.
3.2.16 Perform engineering evaluations, inspections and investigations defining technical requirements, identifying shortfalls, and monitoring performance related to all Navy helicopter power drive systems and their components, engine mechanical systems and their components and auxiliary power systems and their components.
3.2.17 Perform test set-up, operation, data collection, reporting and data analysis to support military specification tests of fuels, lubricants, greases and solvents.
3.2.17.1 Maintain laboratory equipment. Perform calibrations as needed and report results to the laboratory manager. Make small repairs and modifications to existing laboratory test equipment and support equipment as necessary.
3.2.17.2 Perform sophisticated analytical tests using standard and non- standard test methods to investigate service related problems and/or study physical and chemical properties of alternative fuels and lubricants.
3.2.17.3 Prepare and provide recommendations, via Standard Work Packages, for laboratory test methods and/or processes.
3.2.17.4 Conduct round robin tests with other Navy laboratories to maintain and/or improve repeatability and reproducibility test requirements.
3.2.17.5 Make recommendations to Laboratory Manager to improve test efficiency and accuracy.
3.2.17.6 Maintain records for all tests conducted and report results using the LIMS system.
3.2.17.7 Maintain and upgrade as necessary the Laboratory Information Management System (LIMS).
3.2.18 Support critical project management, technical, or business analysis of Naval Air Systems Command’s (NAVAIR) Strategic Propulsion Materials Reclamation Program and similar emergent Special Projects designed to improve affordability, maintain readiness, and reduce operational/sustainment costs.
3.2.18.1 Provide exchange/sale authority policy and procedural recommendations/support to facilitate the overall management and direction of a cross-competency technical team responsible for management, expansion, and development of current and future Government/Propulsion OEM Reclamation Programs, contracts, and agreements.
3.2.18.2 Provide support for task execution, products, and deliverables, provide liaison with NAVAIR Contracting Officer’s Representative (COR).
3.2.18.3 Provide interface for inter-service DoD leads and government and contractor Integrated Program Team leads/members, responds to time-sensitive task requirements, monitor overall quality and metrics, maintain responsibility for customer satisfaction, analyze material and cost data, assist in conducting project reviews and program reviews, identifies risks, and analyze mitigation plans.
3.2.19 Support engineering investigations
3.2.19.1 Make recommendations for maintenance and repair processes and procedures for propulsion and power systems and subsystems.
3.2.19.2 Inspect service hardware and make recommendations for improvement in design and manufacturing.
3.2.19.3 Support engineering change introductions into the Field Repair Centers.
3.2.19.4 Provide field service support. Devise, implement and report all corrective actions taken to maximize propulsion system operational capability and troubleshooting for technical publication updates/corrections. Perform troubleshooting, analysis of specific propulsion system problems, and on-site operator informal training.
3.2.19.5 Provide configuration management support.
3.2.19.6 Conduct quality inspections of manufacturing sites.
3.2.20 Advise designated Propulsion and Power Systems’ teams on implementation and execution of reliability roadmaps and propulsion and power systems management plans.
3.2.20.1 Coordinate with teams and provide monthly updates on status to goal to Propulsion Management Board (PMB) leadership for Measures of Effectiveness (MOEs).
3.2.20.2 Provide rapid response to readiness tasks from Office of the Chief of Naval Operations (OPNAV) and Propulsion Management Board.
3.2.20.3 Provide inputs and recommendations to the requirements generation process.
CDRLS: A006, A007, A008
3.3 INTEGRATED PROGRAM TEAM SUPPORT
(CLINs 0002, 0102, 0202, 0302, 0402) (O&MN Funded)
The contractor shall provide integrated program team support to the Navy’s Propulsion and Power Department for propulsion efforts in support of in-service and fielded systems. Tasks will include:
3.3.1 Review detailed design documents to evaluate quality assurance aspects of proposed Naval and Marine Corps aircraft propulsion and power systems installation designs and implementation approaches.
3.3.2 Contribute inputs during the development of test plans, methods and procedures for the evaluation of aircraft propulsion and power systems.
3.3.3 Provide engineering support for the maintenance and updates for the Engine Reliability Assessment Program (ERAP). The contractor will provide engineering assistance to update the model with current fleet data and assess the accuracy of the information being received from other databases. The contractor will ensure that the interface programs can communicate with modified government logistics databases.
3.3.4 The contractor will provide engineering support in the development of reliability metrics for Propulsion and Power subsystems such as auxiliary power units (APU’s), starters, generators and electrical systems. This effort may require the development of interface software to assess accuracy of data and support future trending efforts.
3.3.5 The contractor will provide technical experts in the areas of failure analysis and components such as bearing and gearbox to support testing and development in the Propulsion Systems Evaluation Facility (PSEF).
3.3.6 Monitor and inspect in-process fabrication, assembly and installation processes of propulsion and power systems to ensure quality of workmanship and conformance with applicable standards and specifications.
3.3.7 Monitor and investigate adverse trends affecting developmental and production Naval and Marine Corps aircraft propulsion and power systems quality, reliability and basic mission performance.
3.3.8 Perform inspections of Naval and Marine Corps aircraft to support production, in-service and overhaul quality assurance programs.
3.3.9 Conduct technical assessments of advanced technology air breathing propulsion and power components and systems in terms of performance, technical risk, soundness of design, and cost.
3.3.10 Perform engineering evaluations of structural data submitted by the Original Equipment Manufacturer (OEM). Analyzing advanced component structures, coatings, and cooling schemes and identity promising technologies to pursue.
3.3.11 Develop requirements document and test plans for engine oil ratio test and endurance test; analyzing test and failure data to determine cause and mode of failure; recommending composite test plan including all weather propeller test performance mapping test, oil ratio test and endurance test.
3.3.12 Conduct particle analysis of oil debris generated from testing facility components to include weight measurement, Scanning Electron Microscope (SCM) and X-ray diffraction analysis.
3.3.13 Provide engineering support in the areas of design, operational performance, structural integrity, alternate part suitability, failure investigation and analysis, testing and data analysis for all Navy turbofan, turboprop, turboshaft, and reciprocating engines.
3.3.14 Evaluate fuel lubricity and low temperature fuel properties, provide process for handling and disposal of contaminated wastewater, and evaluating fuel “freezing” and low temperature viscosity effects on aircraft/engine performance.
3.3.15 Develop the testing method and data necessary to correlate various tests into a useable protocol to evaluate fuels to coke in laboratory test with its actual installed aircraft performance.
3.3.16 Perform engineering evaluations, inspections and investigations recommending technical requirements, identifying shortfalls, and monitoring performance of fielded systems related to all Navy helicopter power drive systems and their components, engine mechanical systems and their components and auxiliary power systems and their components.
3.3.17 Perform test set-up, operation, data collection, reporting and data analysis to support military specification tests of fuels, lubricants, greases and solvents.
3.3.17.1 Maintain laboratory equipment. Perform calibrations as needed and report results to the laboratory manager. Make small repairs and modifications to existing laboratory test equipment and support equipment as necessary.
3.3.17.2 Perform sophisticated analytical tests using standard and non- standard test methods to investigate service related problems and/or study physical and chemical properties of alternative fuels and lubricants.
3.3.17.3 Prepare and provide recommendations, via Standard Work Packages, for laboratory test methods and/or processes.
3.3.17.4 Conduct round robin tests with other Navy laboratories to maintain and/or improve repeatability and reproducibility test requirements.
3.3.17.5 Make recommendations to Laboratory Manager to improve test efficiency and accuracy.
3.3.17.6 Maintain records for all tests conducted and report results using the LIMS system.
3.3.17.7 Maintain and upgrade as necessary the Laboratory Information Management System (LIMS).
3.3.18 Support critical program management, technical, or business analysis of Naval Air Systems Command’s (NAVAIR) Strategic Propulsion Materials Reclamation Program and similar emergent Special Projects designed to improve affordability, maintain readiness, and reduce operational/sustainment costs for fielded systems.
3.3.18.1 Provide exchange/sale authority policy and procedural recommendations/support to facilitate the overall management and direction of a cross-competency technical team responsible for management, expansion, and development of current and future Government/Propulsion OEM Reclamation Programs, contracts, and agreements.
3.3.18.2 Provide support for task execution, products, and deliverables, provide liaison with NAVAIR Contracting Officer’s Representative (COR).
3.3.18.3 Provide interface for inter-service DoD leads and government and contractor Integrated Program Team leads/members, responds to time-sensitive task requirements, monitor overall quality and metrics, maintain responsibility for customer satisfaction, analyze material and cost data, assist in conducting project reviews and program reviews, identifies risks, and analyze mitigation plans.
3.3.19 Support engineering investigations
3.3.19.1 Make recommendations for maintenance and repair processes and procedures for propulsion and power systems and subsystems.
3.3.19.2 Inspect service hardware and make recommendations for improvement in design and manufacturing.
3.3.19.3 Support engineering change introductions into the Field Repair Centers.
3.3.19.4 Provide field service support. Devise, implement and report all corrective actions taken to maximize propulsion system operational capability and troubleshooting for technical publication updates/corrections. Perform troubleshooting, analysis of specific propulsion system problems, and on-site operator informal training.
3.3.19.5 Provide configuration management support.
3.3.19.6 Conduct quality inspections of manufacturing sites.
3.3.20 Advise designated Propulsion and Power Systems’ teams on implementation and execution of reliability roadmaps and propulsion and power systems management plans.
3.3.20.1 Coordinate with teams and provide monthly updates on status to goal to Propulsion Management Board (PMB) leadership for Measures of Effectiveness (MOEs).
3.3.20.2 Provide rapid response to readiness tasks from Office of the Chief of Naval Operations (OPNAV) and Propulsion Management Board.
3.3.20.3 Provide inputs and recommendations to the requirements generation process.
3.4 INTEGRATED PROGRAM TEAM SUPPORT
(CLINs 0003, 0103, 0203, 0303, 0403) (AP(N) Funded)
The contractor shall provide integrated program team support to the Navy’s Propulsion and Power Department for propulsion efforts related to modification of in-service aircraft or deploying production systems. Tasks will include:
3.4.1 Review detailed design documents to evaluate quality assurance aspects of proposed Naval and Marine Corps aircraft propulsion and power systems installation designs and implementation approaches.
3.4.2 Contribute inputs during the development of test plans, methods and procedures for the evaluation of aircraft propulsion and power systems.
3.4.3 Provide engineering support for the Engine Reliability Assessment Program (ERAP). The contractor will provide engineering assistance to update the model with current fleet data and assess the accuracy of the information being received from other databases. The contractor will ensure that the interface programs can communicate with modified government logistics databases.
3.4.4 The contractor will provide engineering support in the development of reliability metrics for Propulsion and Power subsystems such as auxiliary power units (APU’s), starters, generators and electrical systems. This effort may require the development of interface software to assess accuracy of data and support future trending efforts.
3.4.5 The contractor will provide technical experts in the areas of failure analysis and components such as bearing and gearbox to support testing and development in the Propulsion Systems Evaluation Facility (PSEF).
3.4.6 Monitor and inspect in-process fabrication, assembly and installation processes of propulsion and power systems to ensure quality of workmanship and conformance with applicable standards and specifications.
3.4.7 Monitor and investigate adverse trends affecting production Naval and Marine Corps aircraft propulsion and power systems quality, reliability and basic mission performance.
3.4.8 Perform inspections of Naval and Marine Corps aircraft to support production, in-service and overhaul quality assurance programs.
3.4.9 Conduct technical assessments of advanced technology air breathing propulsion and power components and systems in terms of performance, technical risk, soundness of design, and cost.
3.4.10 Perform engineering evaluations of structural data submitted by the Original Equipment Manufacturer (OEM). Analyzing advanced component structures, coatings, and cooling schemes and identity promising technologies to pursue.
3.4.11 Develop requirements document and test plans for engine oil ratio test and endurance test; analyzing test and failure data to determine cause and mode of failure; recommending composite test plan including all weather propeller test performance mapping test, oil ratio test and endurance test.
3.4.12 Conduct particle analysis of oil debris generated from testing facility components to include weight measurement, Scanning Electron Microscope (SCM) and X-ray diffraction analysis.
3.4.13 Provide engineering support in the areas of design, operational performance, structural integrity, alternate part suitability, failure investigation and analysis, testing and data analysis for all Navy turbofan, turboprop, turboshaft, and reciprocating engines.
3.4.14 Analyze fuel lubricity and low temperature fuel properties, provide process for handling and disposal of contaminated wastewater, and evaluating fuel “freezing” and low temperature viscosity effects on aircraft/engine performance.
3.4.15 Construct the testing method and data necessary to correlate various tests into a useable protocol to evaluate fuels to coke in laboratory test with its actual installed aircraft performance.
3.4.16 Perform engineering evaluations, inspections and investigations defining technical requirements, identifying shortfalls, and monitoring performance of fielded systems related to all Navy helicopter power drive systems and their components, engine mechanical systems and their components and auxiliary power systems and their components.
3.4.17 Perform test set-up, operation, data collection, reporting and data analysis to support military specification tests of fuels, lubricants, greases and solvents.
3.4.17.1 Maintain laboratory equipment. Perform calibrations as needed and report results to the laboratory manager. Make small repairs and modifications to existing laboratory test equipment and support equipment as necessary.
3.4.17.2 Perform sophisticated analytical tests using standard and non- standard test methods to investigate service related problems and/or study physical and chemical properties of alternative fuels and lubricants.
3.4.17.3 Prepare and provide recommendations, via Standard Work Packages, for laboratory test methods and/or processes.
3.4.17.4 Conduct round robin tests with other Navy laboratories to maintain and/or improve repeatability and reproducibility test requirements.
3.4.17.5 Make recommendations to Laboratory Manager to improve test efficiency and accuracy.
3.4.17.6 Maintain records for all tests conducted and report results using the LIMS system.
3.4.17.7 Maintain and upgrade as necessary the Laboratory Information Management System (LIMS).
3.4.18 Support critical program management, technical, or business analysis of Naval Air Systems Command’s (NAVAIR) Strategic Propulsion Materials Reclamation Program and similar emergent Special Projects designed to improve affordability, maintain readiness, and reduce operational/sustainment costs for fielded systems.
3.4.18.1 Provide exchange/sale authority policy and procedural recommendations/support to facilitate the overall management and direction of a cross-competency technical team responsible for management, expansion, and development of current and future Government/Propulsion OEM Reclamation Programs, contracts, and agreements.
3.4.18.2 Provide support for task execution, products, and deliverables, provide liaison with NAVAIR Contracting Officer’s Representative (COR).
3.4.18.3 Provide interface for inter-service DoD leads and government and contractor Integrated Program Team leads/members, responds to time-sensitive task requirements, monitor overall quality and metrics, maintain responsibility for customer satisfaction, analyze material and cost data, assist in conducting project reviews and program reviews, identifies risks, and analyze mitigation plans.
3.4.19 Support engineering investigations
3.4.19.1 Make recommendations for maintenance and repair processes and procedures for propulsion and power systems and subsystems.
3.4.19.2 Inspect service hardware and make recommendations for improvement in design and manufacturing.
3.4.19.3 Support engineering change introductions into the Field Repair Centers.
3.4.19.4 Provide field service support. Devise, implement and report all corrective actions taken to maximize propulsion system operational capability and troubleshooting for technical publication updates/corrections. Perform troubleshooting, analysis of specific propulsion system problems, and on-site operator informal training.
3.4.19.5 Provide configuration management support.
3.4.19.6 Conduct quality inspections of manufacturing sites.
3.4.20 Advise designated Propulsion and Power Systems’ teams on implementation and execution of reliability roadmaps and propulsion and power systems management plans.
3.4.20.1 Coordinate with teams and provide monthly updates on status to goal to Propulsion Management Board (PMB) leadership for Measures of Effectiveness (MOEs).
3.4.20.2 Provide rapid response to readiness tasks from Office of the Chief of Naval Operations (OPNAV) and Propulsion Management Board.
3.4.20.3 Provide inputs and recommendations to the requirements generation process.
4.0 Other Direct Costs (ODC)
ODCs are based on a per annum Not to Exceed (NTE) amount. The Contracting Officer’s Representative (COR) approval shall be obtained prior to the purchase of any ODCs. ODCs may include general and administrative expenses, but shall not include profit.
5.0 Travel
Travel in support of the Statement of Work task performance shall require approval from the Contracting Officer’s Representative (COR) prior to the travel. Reimbursement for travel performed shall be in accordance with established Joint Travel Regulation rates.
6.0 Technical Data
Technical data shall be provided in accrodnace with Exhibit A – DD1423 – Contract Data Requirements List.
7.0 Non-Disclosure Agreements
In the performance of the contract, the contractor may have access to non-public proprietary information. The contractor shall require that any employee performing services under the contract execute a non-disclosure agreement satisfactory to the Contracting Officer. The non-disclosure agreement shall acknowledge the contractor and employees’ duties with respect to non-public information and promise to comply with those obligations. A copy of the executed non-disclosure agreements shall be provided to the Government.
8.0 Identification Badges
Contractor Identification (ID) badges will be issued by the Government to on-site contractor personnel. In accordance with NASPAXRIV Instruction 5510.15Q, 07 March 2012, identification badges shall be displayed at all times. The contractor shall furnish all required information required to facilitate issuance of identification badges and shall conform to all applicable regulations concerning their use and possession. ID media is U.S. Government property and shall be surrendered to the Pass and ID Office upon expiration or termination of employment. The Government will not process contractor personnel during check out unless all media including CAC cards are returned in accordance with instructions identified previously in this paragraph.
9.0 Identification of Contractor Personnel
Corporation affiliation shall be referenced on all written documentation that refers to contractor personnel. This is required for all internal and external communication. Similarly, contractor affiliation shall be identified when answering phone calls and at the beginning of any meeting or conference (in person or on phone) where contractor personnel are in attendance.
| 5252.211-9509 | INCORPORATION OF THE CONTRACTOR'S TECHNICAL PROPOSAL (NAVAIR)(OCT 2005) |
| The Contractor's Technical Proposal Number [Enter technical proposal number], dated [Enter document date], and any amendments/addendums thereof, is incorporated herein by reference, unless otherwise specified, with the same force and effect as if set forth in full text. Nothing in the Contractor's proposal shall constitute a waiver of any of the provisions of the contract, including the Statement(s) of Work and Specification. For purposes of FAR Clause 52.215-8, “Order of Precedence”, the Contractor's technical proposal shall be considered a "Specification" but the Government's Specification shall take precedence over the Contractor's technical proposal. |
C-TXT-ECMRA REQUIRED ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA) INFORMATION
| The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the [NAMED COMPONENT] via a secure data collection site. Contracted services, excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are: | |
| (1) W, Lease/Rental of Equipment; | |
| (2) X, Lease/Rental of Facilities; | |
| (3) Y, Construction of Structures and Facilities; | |
| (4) D, Automatic Data Processing and Telecommunications, IT and Telecom - Telecommunications Transmission (D304) and Internet (D322) ONLY. | |
| (5) S, Utilities ONLY; | |
| (6) V, Freight and Shipping ONLY. | |
| The contractor is required to completely fill in all required data fields using the following web address "https://doncmra.nmci.navy.mil". | |
| Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at "https://doncmra.nmci.navy.mil". |
Section D - Packaging and Marking
| 5252.247-9507 | PACKAGING AND MARKING OF REPORTS (NAVAIR)(OCT 2005) | |
| (a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry Security Program Operating Manual, DoD 5220.22-M. | ||
| (b) The contractor shall prominently display on the cover of each report the following information: | ||
| (1) Name and business address of contractor. | ||
| (2) Contract Number/Delivery/Task order number. | ||
| (3) Contract/Delivery/Task order dollar amount. | ||
| (4) Whether the contract was competitively or non-competitively awarded. | ||
| (5) Name of sponsoring individual. | ||
| (6) Name and address of requiring activity. |
| 5252.247-9514 | TECHNICAL DATA PACKING INSTRUCTIONS (NAVAIR)(SEP 1999) |
| Technical Data and Information shall be packed and packaged for domestic shipment in accordance with best commercial practices. The package or envelope should be clearly marked with any special markings specified in this contract (or delivery/task order), e.g., Contract Number, CLIN, Device No., and document title must be on the outside of the package. Classified reports, data and documentation, if applicable, shall be prepared for shipment in accordance with Defense Industrial Manual for Safeguarding Classified Information, DoD 5220.22M. |
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
| 0005 |
| Destination |
| Government |
| Destination |
| Government |
| 0006 |
| Destination |
| Government |
| Destination |
| Government |
| 0007 |
| Destination |
| Government |
| Destination |
| Government |
| 0101 |
| Destination |
| Government |
| Destination |
| Government |
| 0102 |
| Destination |
| Government |
| Destination |
| Government |
| 0103 |
| Destination |
| Government |
| Destination |
| Government |
| 0104 |
| Destination |
| Government |
| Destination |
| Government |
| 0105 |
| Destination |
| Government |
| Destination |
| Government |
| 0106 |
| Destination |
| Government |
| Destination |
| Government |
| 0107 |
| Destination |
| Government |
| Destination |
| Government |
| 0201 |
| Destination |
| Government |
| Destination |
| Government |
| 0202 |
| Destination |
| Government |
| Destination |
| Government |
| 0203 |
| Destination |
| Government |
| Destination |
| Government |
| 0204 |
| Destination |
| Government |
| Destination |
| Government |
| 0205 |
| Destination |
| Government |
| Destination |
| Government |
| 0206 |
| Destination |
| Government |
| Destination |
| Government |
| 0207 |
| Destination |
| Government |
| Destination |
| Government |
| 0301 |
| Destination |
| Government |
| Destination |
| Government |
| 0302 |
| Destination |
| Government |
| Destination |
| Government |
| 0303 |
| Destination |
| Government |
| Destination |
| Government |
| 0304 |
| Destination |
| Government |
| Destination |
| Government |
| 0305 |
| Destination |
| Government |
| Destination |
| Government |
| 0306 |
| Destination |
| Government |
| Destination |
| Government |
| 0307 |
| Destination |
| Government |
| Destination |
| Government |
| 0401 |
| Destination |
| Government |
| Destination |
| Government |
| 0402 |
| Destination |
| Government |
| Destination |
| Government |
| 0403 |
| Destination |
| Government |
| Destination |
| Government |
| 0404 |
| Destination |
| Government |
| Destination |
| Government |
| 0405 |
| Destination |
| Government |
| Destination |
| Government |
| 0406 |
| Destination |
| Government |
| Destination |
| Government |
| 0407 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-3 |
| Inspection Of Supplies Cost-Reimbursement |
| MAY 2001 |
| 52.246-5 |
| Inspection Of Services Cost-Reimbursement |
| APR 1984 |
| 52.246-15 |
| Certificate of Conformance |
| APR 1984 |
| 252.246-7000 |
| Material Inspection And Receiving Report |
| MAR 2008 |
| 5252.246-9512 | INSPECTION AND ACCEPTANCE (NAVAIR) (OCT 2005) |
| (a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by COR/ACOR. | |
| (b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements. |
| 5252.246-9514 | INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION (NAVAIR) (FEB 1995) |
| Inspection and acceptance of technical data and information will be performed by the Procuring Contracting Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250, Material Inspection and Receiving Report, as appropriate, and/or upon receipt of a second endorsement acceptance by the PCO on the attachment to this contract entitled N/A. The attached form will not be used for high cost data such as drawings, specifications, and technical manuals. |
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
| 0001 |
| POP 01-OCT-2016 TO |
30-SEP-2017
| N/A |
| N/A |
| 0002 |
| POP 01-OCT-2016 TO |
30-SEP-2017
| N/A |
| N/A |
| 0003 |
| POP 01-OCT-2016 TO |
30-SEP-2017
| N/A |
| N/A |
| 0004 |
| POP 01-OCT-2016 TO |
30-SEP-2017
| N/A |
| N/A |
| 0005 |
| POP 01-OCT-2016 TO |
30-SEP-2017
| N/A |
| N/A |
| 0006 |
| POP 01-OCT-2016 TO |
30-SEP-2017
| N/A |
| N/A |
| 0007 |
| POP 01-OCT-2016 TO |
30-SEP-2017
| N/A |
| N/A |
| 0101 |
| POP 01-OCT-2017 TO |
30-SEP-2018
| N/A |
| N/A |
| 0102 |
| POP 01-OCT-2017 TO |
30-SEP-2018
| N/A |
| N/A |
| 0103 |
| POP 01-OCT-2017 TO |
30-SEP-2018
| N/A |
| N/A |
| 0104 |
| POP 01-OCT-2017 TO |
30-SEP-2018
| N/A |
| N/A |
| 0105 |
| POP 01-OCT-2017 TO |
30-SEP-2018
| N/A |
| N/A |
| 0106 |
| POP 01-OCT-2017 TO |
30-SEP-2018
| N/A |
| N/A |
| 0107 |
| POP 01-OCT-2017 TO |
30-SEP-2018
| N/A |
| N/A |
| 0201 |
| POP 01-OCT-2018 TO |
30-SEP-2019
| N/A |
| N/A |
| 0202 |
| POP 01-OCT-2018 TO |
30-SEP-2019
| N/A |
| N/A |
| 0203 |
| POP 01-OCT-2018 TO |
30-SEP-2019
| N/A |
| N/A |
| 0204 |
| POP 01-OCT-2018 TO |
30-SEP-2019
| N/A |
| N/A |
| 0205 |
| POP 01-OCT-2018 TO |
30-SEP-2019
| N/A |
| N/A |
| 0206 |
| POP 01-OCT-2018 TO |
30-SEP-2019
| N/A |
| N/A |
| 0207 |
| POP 01-OCT-2018 TO |
30-SEP-2019
| N/A |
| N/A |
| 0301 |
| POP 01-OCT-2019 TO |
30-SEP-2020
| N/A |
| N/A |
| 0302 |
| POP 01-OCT-2019 TO |
30-SEP-2020
| N/A |
| N/A |
| 0303 |
| POP 01-OCT-2019 TO |
30-SEP-2020
| N/A |
| N/A |
| 0304 |
| POP 01-OCT-2019 TO |
30-SEP-2020
| N/A |
| N/A |
| 0305 |
| POP 01-OCT-2019 TO |
30-SEP-2020
| N/A |
| N/A |
| 0306 |
| POP 01-OCT-2019 TO |
30-SEP-2020
| N/A |
| N/A |
| 0307 |
| POP 01-OCT-2019 TO |
30-SEP-2020
| N/A |
| N/A |
| 0401 |
| POP 01-OCT-2020 TO |
30-SEP-2021
| N/A |
| N/A |
| 0402 |
| POP 01-OCT-2020 TO |
30-SEP-2021
| N/A |
| N/A |
| 0403 |
| POP 01-OCT-2020 TO |
30-SEP-2021
| N/A |
| N/A |
| 0404 |
| POP 01-OCT-2020 TO |
30-SEP-2021
| N/A |
| N/A |
| 0405 |
| POP 01-OCT-2020 TO |
30-SEP-2021
| N/A |
| N/A |
| 0406 |
| POP 01-OCT-2020 TO |
30-SEP-2021
| N/A |
| N/A |
| 0407 |
| POP 01-OCT-2020 TO |
30-SEP-2021
| N/A |
| N/A |
| 52.242-15 Alt I |
| Stop-Work Order (Aug 1989) - Alternate I |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
| 52.247-55 |
| F.O.B. Point For Delivery Of Government-Furnished Property |
| JUN 2003 |
| 5252.211-9507 | PERIOD OF PERFORMANCE (NAVAIR)(SEP 2013) |
| (a) The contract shall commence on 01 October 2016 and shall continue for a period of one (1) year. However, the period of performance may be extended in accordance with the option provisions contained herein. | |
| (b) If DFAR Clause 252.216-7006, “Ordering”, is incorporated into this contract, then the period in which the Government can issue orders under the contract will be extended at the exercise of an option, and extended to the end of that option period. |
| 5252.245-9509 | PLACE OF DELIVERY - GOVERNMENT FURNISHED MATERIAL (NAVAIR) (MAR 1999) | ||
| (a) The Government will furnish to the contractor for use in connection with this contract the following material at the time specified: | |||
| Material | Quantity | Date | |
| [NONE] | |||
| (b) The material will be delivered at the Government's expense to the location designated in the contractor's proposal for performance. Delivery includes delivery either directly to the factory/warehouse street location, or to a designated private siding if delivery is by rail. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .