About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Final RFP - Program Management, Engineering and Technical Support Services for Power and Propulsion Department (AIR 4. 4), newest first.
File Type Posted
N00421-16-R-0006-0002.docx DOCX document
Attachment_P5_Past_Performance_Questionnaire_Package_for_Services.doc DOC document
P7_-_CPARS_UPDATE_QUESTIONNAIRE.doc DOC document
Attachment_P4_-_Past_Performance_Information_Sheet.docx DOCX document
Attachment_J1_Organizational_Conflict_of_Interest_List.docx DOCX document
Attachment_P2_Workforce_Hour_Matrix_(2).xls XLS spreadsheet
N00421-16-R-0006_CDRLS_A001-A007.doc DOC document
Attachment_P4_Past_Performance_Matrix.doc DOC document
Attachment_P1_Workforce_Qualifications.xls XLS spreadsheet
N00421-16-R-0006_(Final_RFP).docx DOCX document
Attachment_P5_Past_Performance_Questionnaire_Package_for_Services.doc DOC document
Attachment_P6_CLIN_Breakout_spreadsheet_N00421-16-R-0006.xlsx XLSX spreadsheet
N00421-16-R-0006.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00421-16-R-0006

Section A - Solicitation/Contract Form

GENERAL INFORMATION

Points of Contact:

Jeffrey S. Boyce Contract Specialist Code 2.5.1.7.4

(301) 757-0015 Jeffrey.s.boyce@navy.mil

Rebecca J. Wathen Contracting Officer Code 2.5.1.7

(301) 757-0013 Rebecca.wathen@navy.mil

1. The Contract is for a total period of performance of five (5) years (Base year plus four (4) one-year options.)

2. This includes Cost Plus Fixed Fee (CPFF) Level of Effort (LOE) contract line item numbers (CLINs) for labor and cost reimbursement (no fee) CLINs for Other Direct Costs (ODCs), including material and travel.

3. Funding for each CLIN will be obligated at the sub-CLIN level.

4. The contractor will not be authorized to access any classified information under this contract unless a DD Form 254 is incorporated.

AMEND 0001 QUESTIONS & ANSWERS

N00421-16-R-0006 Questions and Answers Amendment 0001

1. A. The labor hours shown in the tables on pages 17 and 110 specify 41,816 hours per year and 209,080 hours total. When adding the hours by skill by year, one gets 42,136 hours per year and 210,680 hours total.

Question: Is it the Government's intention for the offeror to propose 210,680 hours?

B. L Part B 4.6.2, page 110 - The labor matrix was revised to adjust the labor hours by LCAT and labor categories to add an “Engineer/Scientist III”. However, when summed, the total hours listed by LCAT does not match the total hours listed in the last “Total” line (42,136 annually for 210,680 total versus the 41,816 annually and 209,080 currently listed).

Request for Clarification: Please clarify the Government estimated labor hours.

ANSWER: The correct total for each year should read 42,136 and the total number of hours for the five-year period should read 210,680. The matrices on Pages 17 and 110 will be revised by this amendment.

2. In Section L PART B 4.1(a) on page 106 of the RFP, the Government states, "This Volume shall contain the information requested below and shall include a copy of Section B with the Contract Line Item (CLIN) and Sub-CLIN Unit Prices and, for evaluation purposes, the Total Prices filled in using the estimated quantities value in the solicitation and the instructions below." In Section L, PART B, 4.6.2 on page 110 of the RFP the Government states, "Offerors should price the total labor hours at a single CLIN level (i.e. 0001, 0101, 0201, 0301 and 0401) for each year. At award, the Government will allocate labor costs to the labor CLINs in Section B as follows:"

Question: Please clarify if the offeror is to propose all the labor hours in Section L, PART B, 4.6.2 to be priced just in CLIN 0X01. Can the Government please clarify if the prices in Section B should also represent the hours only in CLIN 0X01?

ANSWER: Offerors should price the total labor costs at a single CLIN level (i.e. 0001, 0101, 0201, 0301, and 0401) for each year. At award, the Government will allocate labor costs to the labor CLINs in Section B as shown on Page 110 of the RFP. Page 106 language will be changed to reflect this by this amendment.

3. When creating the Summary Tab for all years in Attachment P6, should the offeror include the 6-month Extension Option as part of the Total Price?

ANSWER: No the offeror should not include the 6-month extension. The Government will calculate the 6-month extension during the evaluation process.

4. Due to proprietary nature of the information required by Sections L, PART B, 4.3(c) and 4.3(h) on page 108 of the RFP, may the offeror’s proposed subcontractors submit sealed packages directly to the Government?

ANSWER: Yes – Subcontractors are encouraged to submit their sealed packages directly to the Government. Paragraph 4.3 Cost/Price Information has been clarified by this amendment.

5. In Section L, PART B, 4.3(i) on page 109 of the RFP the Government states, “In preparing the cost/price proposal, the Offeror shall ensure the submittal is easy to understand and includes the following:”

Question: Can the Government please clarify to what “the following:” refers?

ANSWER: Paragraph 4.3 (i) has been marked reserved by this amendment.

6. Please confirm that the Engineer/Scientist III labor category falls under the Engineering Functional Labor Area in regards to tripwire rates listed in Section L, PART B, 3.0 on page 125 of the RFP.

ANSWER: Yes – the Engineer/Scientist III labor category should fall under the Engineering Functional Labor Area. Section M, Part B, Paragraph 3.0 Table has been revised by this amendment.

7. A. Please specify where in the proposal the offeror should insert the Proposal Adequacy Checklist appearing on page 114 of the RFP.

B. Page 114, Proposal Adequacy Checklist - RFP states “The Offeror shall complete the following checklist, providing location of requested information, or an explanation of why the requested information is not provided.”

Questions: 1) Which proposal volume should this checklist be incorporated into?

2) Does the checklist count toward the page limitations of that volume?

ANSWER: The Proposal Adequacy Checklist should be included in Volume IV – Cost Proposal. SECTION L – PART B – Paragraph 4.1 has been clarified by this amendment.

8. Please clarify which labor category title the offeror should use in its proposal: Page 96 references Senior Engineer Tech VI; page 100 references Engineering Tech VI; and page 110 references Senior Engineering Tech VI.

ANSWER: The Labor Category has been changed throughout Section L to read Engineering Technician VI by this amendment

9. A. In Section L, PART A, 4.0 on page 94 of the RFP, the Government requests that Volume 3 Past Performance information be submitted fourteen (14) calendar days prior to the submission date specified in Block 9 of the Standard Form SF 33 of the RFP." The instruction in Attachment P5 Past Performance Questionnaire Package for Services requests the questionnaire by 04 June 2016. Please clarify if the questionnaire is due at the same time as the other past performance information (14 calendar days prior to submission of the proposal) or if it is due on 04 June 2016 per the instructions in the attachment.

B. L Part A 4.0, page 94 - RFP states “Volume 3 Past Performance information shall be submitted fourteen (14) calendar days prior to the submission date specified in Block 9 of the Standard Form SF 33 (12:00 AM, 07 June 2016).

Requests for clarification:

1) Please confirm that the Government will accept Volume 3 Past Performance information received through Tuesday, 24 May 2016.

2) Due to the short time frame available for providing Volume 3 Past Performance information, can the Government expedite responses to questions received related to Volume 3 Past Performance information?

ANSWER: Past Performance Information shall be submitted by May 24, 2016. The Attachment P5 Past Performance Questionnaire Package shall be updated to correct the date by this amendment.

10. A. Section L, PART B, 3.1(a) titled “Contract Data” on page 104 of the RFP instructs the offeror to, “Provide all the information identified below separately for each contract."

Does this statement mean that the offeror should complete a separate past performance matrix for each past performance citation or does it mean that that there are to be one past performance matrix combining all past performance citations?

B. L Part B 3.1 a, page 104, 106 - The RFP identifies the requirement for Offerors to submit the completed the Attachment P4 (Past Performance Matrix) (L.3.1.), separate Past Performance Matrix (L.3.1(a) on page 104), and Past Performance Data Requirements table (L.3.2. on page 106).

Request for Clarification:

Please confirm that all three items are required.

Questions:

1) Does the Past Performance Matrix (L.3.1(a) on page 104) count towards the 10 page limit for Volume 3 or can we include as an Appendix to the Volume 3 that does not count towards the 10 page limit?

2) Does the Past Performance Data Requirements table (L.3.2. on page 106) count towards the 10 page limit for Volume 3 or can we include as an Appendix to the Volume 3 that does not count towards the 10 page limit?

C. Concerning page limits identified in Section L, PART A, 3.0 on page 93 of the RFP: Would the Government consider revising the page limit for Vol. 3 Past Performance to allow for (2) two pages per citation and excluding Attachment P4 and the table required by Section L, PART B, 3.2 on page 106 of the RFP from the page count?

ANSWER: The offeror should complete a Past Performance Information Sheet for each contract reference that is being used for this requirement. A revised Attachment P4 is being provided by this amendment. Section L – Part B – Paragraph 3.0 has been revised to eliminate multiple matrices, which have now been combined into a single form. The page limitation will be one past Performance Information Sheet for each reference. Supplemental Sheets should be limited to one (1) sheet per reference.

11. A. Concerning the page limits specified in Section L, PART A, 3.0 on page 93 of the RFP, is the SF33 included in the 2-page limit for the Executive Summary?

B. L Part A 3.0, page 93 - Volume 1, Executive Summary, is limited to 2 pages.

Question: Will the government allow Offerors to submit the following items as attachments/appendices to the Volume 1 and be excluded from the page count?

· Signed SF33 or SF 1449

· Signed Reps and Certs

· Written Consent from Principal Subcontractors and Critical Team Members

ANSWER: Section L – Part B, Paragraph 1.0 will be updated by this amendment to exclude the following from the page limitations of Volume 1 – Executive Summary:

* Signed SF33 or SF1449 for basic solicitation and acknowledgement of each amendment, including completion of any RFP clause or provision that requires a fill-in or response.
* Signed Representations, Certifications, and Acknowledgements or Online Representations and Certifications Application (ORCA) reference.
* Written consent from principal subcontractors and critical team members that will allow the Government to coordinate potential past performance and/or cost/price issues with the Offeror.

12. A. Concerning the page limits specified in Section L, PART A, 3.0 on page 93 of the RFP, please clarify if the resumes required by Section L, PART B, 2.1.1(a) on page 96 of the RFP are included in the 20-page limit for this section.

B. L Part B 2.1.1d, Key Labor Categories, page 96- Section 2.1 Staffing and Personnel requires resume submission.

Questions:

(1) What is the page limitation for resumes?

(2) Will the Government allow Offerors to submit resumes and letters of intent as an attachment/appendix to the Volume 2 and be excluded from the page count?

ANSWER: The page limitation for Volume 2.0, Section 2.1.1 shall be changed to 30 pages by this amendment. There is no limitation on the number of pages per resume so long as the total number of pages is within the 30-page limitation. . Letters of Intent are excluded from the page limitation.

13. A. Will the Government allow 10 pt. Arial or Times New Roman font for figures and tables?

B. L Part A 2.0, page 92 - RFP states “Written proposals must be formatted using a Times New Roman 12 pt. normal font (no reduction permitted)” and “Graphs shall be presented in no smaller than a 10 pt. font…” The RFP does not clarify font requirements for tables and graphics.

Questions:

1) Are past performance tables and resume tables acceptable in 10 pt. Times New Roman?

2) Will the Government accept 8 point font for graphics?

ANSWER: The Government will accept 10 pt. font for figures and tables. Section L – Part A – Paragraph 2.0 has been revised to reflect this change.

14. A. Reference Section L, Part B, 3.1 on page 104 of the RFP: The Government references a “CPARS Update Questionnaire”.

Will the Government provide the questionnaire?

B. L Part B 3.1, page 104 - RFP states “The Past Performance Information Reporting System (PPIRS) will be used to evaluate Past Performance. For contracts that have CPARS or similar reports that are more than six months old, e.g., the completion date is more than six months before the due date for this Past Performance Volume, the Offeror will forward a copy of the CPARS Update Questionnaire to that contract customer’s Program Manager.” The template for the CPARS Update Questionnaire is not included as an attachment to the solicitation.

Request for clarification:

Please confirm this requirement and, if required, provide a copy of the CPARS Update Questionnaire template.

C. L Part A 3.0, page 104 – Question:

Will the Government accept the latest CPAR, including those older than 6 months, in lieu of a CPAR Update Questionnaire or a Past Performance Questionnaire?

ANSWER: The CPARS Update Questionnaire is being provided at Attachment P7 by this amendment. If the CPARS is older than 6 months, a CPAR Update Questionnaire or a Past Performance Questionnaire is required.

15. Concerning the SF 294s/Individual Subcontracting Reports (ISRs) required by Section L, Part B, 3.1(e) on page 105 of the RFP: Will the Government consider excluding these reports from the page limit?

ANSWER: Yes – The SF294s shall be excluded from the Page Limitation for the Past Performance Volume. Section L – Part B – Section 3.1 Past Performance General has been revised.

16. Reference Part B, Paragraph 2.2.5, page 103 – The Government has directed offerors to state their SB percentage goals in terms of total contract value and total subcontract value. FAR 52.219-9(d)(1) directs that SB subcontracting plans express goals in terms of subcontract value. Please indicate which value (contract or subcontract) the Government’s 20% goals address.

ANSWER: Section L – Part B – Section 2.2.5 paragraph b has been revised. The Government requirement is to encourage small business goals and participation at a higher level, that being 20%. If the successful awardee is a large business, it is expected that there be a minimum of 20% participation by small businesses in their proposal. In the event that the successful awardee is an other than large business, then this 20% requirement shall have presumed to have been met.

17. L Part B, 5.0, page 111 - The RFP states “The Offeror shall specifically identify the portion of the solicitation and the Offeror's proposal which are affected. If there are no exceptions, deviations, or waivers, the Offeror shall provide a one page Volume 6 in the Executive Summary stating so.”

Request for clarification:

Please confirm that if an Offeror requests no exceptions, deviations, or waivers, the Offeror shall provide a statement in the Volume 1, Executive Summary, vice submitting a Volume 6.

ANSWER: In the event there are no exceptions, deviations, or waivers, the offeror shall provide a statement to that effect and place that statement in Volume 1 under a Tab marked as Volume 6.

18. L Part A 3.0, page 93-94 - RFP states, “The Offeror shall submit a Cross Reference Matrix (CRM) for the Technical Volume, similar to the example below, to help ensure that all solicitation requirements are addressed and to facilitate the evaluators’ review of the Offeror’s proposal. The CRM should be a single integrated matrix and cross-reference the proposal volumes and paragraphs to specific RFP requirements, as well as other parts of the proposal that contain relevant information.”

Question:

Should the CRM reflect the technical volume only, or should all volumes be addressed in the technical volume?

ANSWER: The CRM should address the technical volume only.

19. H. Clause 5252.228-9501 LIABILITY INSURANCE (NAVAIR) (MAR 1999) - Paragraph (d) of NAVAIR Clause 5252.228-9501 requires the provision of:

“(d) Aircraft public and passenger liability: $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability; $200,000 per occurrence for property damage. Passenger bodily injury liability limits of $200,000 per passenger, multiplied by the number of seats or number of passengers, whichever is greater.”

Question:

Can this requirement be deleted as not applicable to the scope of the solicitation?

ANSWER: The clause is a valid requirement and shall remain as stated.

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

4.4 Labor (RDT&E)

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

FOB: Destination

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

4.4 Labor (O&MN)

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

4.4 Labor (AP(N))

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

4.4 Labor (NWCF)

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Travel in support of CLINs 0001-0004

COST

Travel in support of Program Management, Engineering and Technical Support Services.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Materials in Support of CLINs 0001-0004

Materials in support of Program Management, Engineering and Technical Support Services.

PURCHASE REQUEST NUMBER: 1300387768

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Technical Data CLINs 0001-0004

*NOT SEPARATELY PRICED* Technical Data in accordance with CDRLs in support of Engineering and Technical Services.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (RDT&E)

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (O&MN)

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (AP(N))

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (NWCF)

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Travel in support of CLINs 0101-0104

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Materials in Support of CLINs 0101-0104

COST

Materials in support of Program Management, Engineering and Technical Support Services.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Technical Data CLINs 0101-0104

COST

*NOT SEPARATELY PRICED* Technical Data in accordance with CDRLs in support of Engineering and Technical Services.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (RDT&E)

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (O&MN)

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (AP(N))

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (NWCF)

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Travel in support of CLINs 0201-0204

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Materials in Support of CLINs 0201-0204

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Technical Data CLINs 0201-0204

COST

*NOT SEPARATELY PRICED* Technical Data in accordance with CDRLs in support of Engineering and Technical Services.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (RDT&E)

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (O&MN)

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (AP(N))

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (NWCF)

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Travel in support of CLINs 0301-0304

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Materials in Support of CLINs 0301-0304

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Technical Data CLINs 0301-0304

COST

*NOT SEPARATELY PRICED* Technical Data in accordance with CDRLs in support of Engineering and Technical Services.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (RDT&E)

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (O&MN)

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (AP(N))

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
4.4 Labor (NWCF)

CPFF

Labor for Program Management, Engineering and Technical Support Services in accordance with the Statement of Work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Travel in support of CLINs 0401-0404

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Materials in Support of CLINs 0401-0404

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Technical Data CLINs 0401-0404

COST

*NOT SEPARATELY PRICED* Technical Data in accordance with CDRLs in support of Engineering and Technical Services.

ESTIMATED COST

CLAUSES INCORPORATED BY FULL TEXT

5252.211-9503LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR)(DEC 2012) - ALT I (JUN 2013)
(a) The level of effort estimated to be ordered during the term of this contract is 210,680 man-hours of direct labor including authorized subcontract labor, if any. The estimated composition of the total man-hours of direct labor by classification is as follows:
Location
BASE
OY 1
OY 2
OY 3
OY 4
Total
Labor Category
On / Off
Hours
Hours
Hours
Hours
Hours
Hours
Senior Program Manager *
Off-site
1920
1920
1920
1920
1920
9600
Training Specialist III *
On-site
1920
1920
1920
1920
1920
9600
Engineer/Scientist V *
On-Site
7680
7680
7680
7680
7680
38,400
Engineer/Scientist V
Off-Site
7710
7710
7710
7710
7710
38,550
Engineer/Scientist IV
On-Site
1920
1920
1920
1920
1920
9600
Engineer/Scientist IV
Off-site
9630
9630
9630
9630
9630
48,150
Engineer/Scientist III
On-site
1920
1920
1920
1920
1920
9600
Senior Engineering Tech V
Off-site
4300
4300
4300
4300
4300
21,500
Senior Engineering Tech VI *
Off-site
3840
3840
3840
3840
3840
19,200
Systems Analyst
Off-site
1296
1296
1296
1296
1296
6480

TOTAL

42,136
42,136
42,136
42,136
42,136
210,680

* denotes Key Personnel labor categories

(b) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22.
(c) It is agreed that while the contractor's performance during the period set forth in paragraph (a) above is based upon an anticipated level of effort consisting of man-hours of direct labor (as may be described or defined elsewhere herein), such level of effort may fluctuate, either upward or downward, by no more than ten (10%) percent of the total anticipated man-hours. This fixed fee is agreed to be paid for man-hours expended from ninety (90%) percent to one hundred ten (110%) percent of the total anticipated man-hours. The fixed fee shall not vary with the cost of the actual effort supplied within this range. In the event that less than ninety (90%) percent of the anticipated level of effort is actually expended by the expiration date of the contract, the Government shall have the option of:
(1) requiring the contractor to continue to perform until the level of effort expended equals ninety (90%) percent of the anticipated level of effort; or
(2) effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than ninety (90%) percent of the anticipated level of effort.
(d) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations.

Section C - Descriptions and Specifications

STATEMENT OF WORK

STATEMENT OF WORK

Program Management, Engineering and Technical Support Services For Propulsion and Power Department (AIR-4.4)

1.0 SCOPE

This Statement of Work (SOW) sets forth the requirements for the Contractor to provide program management, engineering, and technical support services for the Propulsion and Power Department (AIR-4.4).

1.1 BACKGROUND

AIR-4.4 is the lead activity for research, systems engineering and integration, engineering analysis and evaluation, test and evaluation, and in-service engineering support of naval air propulsion and power systems, including:

• Air breathing engines (except for ramjets) and engine integration for manned and unmanned aircraft and missiles

• Auxiliary, secondary and emergency power systems

• Helicopter transmissions and drive systems

• Aircraft and engine fuel systems, and ground refueling systems

• Fuel, oil and greases for propulsion system engines, gearboxes, propellers and transmissions

• Propulsion system performance

2.0 RESERVED

1. GENERAL REQUIREMENTS

The following describes the types of efforts (functional areas) to be performed in support of this acquisition. The contractor shall make available personnel to Propulsion and Power Department at the level of effort set within this contract and shall perform the tasks set forth below:

3.1 PROGRAM MANAGEMENT SUPPORT

(CLINs 0004, 0104, 0204, 0304, 0404) (NWCF Funded)

The contractor shall provide program management support to the Navy’s Propulsion and Power Department for propulsion efforts. Typical tasks will include:

3.1.1 Monitor programs within the Propulsion and Power Department to cost, schedule, business, and performance standards.

3.1.2 Maintain an interface with the COR in order to understand objectives and milestones.

3.1.3 Provide requirements analysis, systems analysis, requirements integration, system development, implementation, training, monitoring, and metrics development for propulsion and power systems in the areas of critical items management and competency training. The contractor shall review and input data into databases for various members of the competency and Integrated Program Team (IPT). The contractor will ensure timely transfer of information in accordance with IPT requirements.

3.1.4 Provide strategic planning, business development and marketing services for Navy propulsion and power test and evaluation facilities, products and services. The contractor will develop strategic planning documents, identify and track potential business targets, qualify opportunities, develop business and capture plans, identify teaming opportunities, attend customer meetings, participate in marketing initiatives and proposal development, and post proposal follow-up.

3.1.5 Develop and review process standards in accordance with applicable instructions and guidance documents.

3.1.6 Track projects and budgets; prepare financial reports, and track contract status.

3.1.7 Provide typing/word processing and maintain office files, records and instructions.

CDRLS: A001, A002, A004, A005

3.2 INTEGRATED PROGRAM TEAM SUPPORT

(CLINs 0001, 0101, 0201, 0301, 0401) (RDT&E Funded)

The contractor shall provide integrated program team support to the Navy’s Propulsion and Power Department for propulsion efforts involving research, development, test and evaluation. Tasks will include:

3.2.1 Review detailed design documents to evaluate quality assurance aspects of proposed Naval and Marine Corps aircraft propulsion and power systems installation designs and implementation approaches.

3.2.2 Contribute inputs during the development of test plans, methods and procedures for the evaluation of aircraft propulsion and power systems.

3.2.3 Provide engineering support for the Engine Reliability Assessment Program (ERAP). The contractor will provide engineering assistance to update the model with current fleet data and assess the accuracy of the information being received from other databases. The contractor will ensure that the interface programs can communicate with modified government logistics databases.

3.2.4 The contractor will provide engineering support in the development of reliability metrics for Propulsion and Power subsystems such as auxiliary power units (APU’s), starters, generators and electrical systems. This effort may require the development of interface software to assess accuracy of data and support future trending efforts.

3.2.5 The contractor will provide technical experts in the areas of failure analysis and components such as bearing and gearbox to support testing and development in the Propulsion Systems Evaluation Facility (PSEF).

3.2.6 Monitor and inspect in-process fabrication, assembly and installation processes of propulsion and power systems to ensure quality of workmanship and conformance with applicable standards and specifications.

3.2.7 Monitor and investigate adverse trends affecting developmental Naval and Marine Corps aircraft propulsion and power systems quality, reliability and basic mission performance.

3.2.8 Perform inspections of Naval and Marine Corps aircraft to support quality assurance programs.

3.2.9 Conduct technical assessments of advanced technology air breathing propulsion and power components and systems in terms of performance, technical risk, soundness of design, and cost.

3.2.10 Perform engineering evaluations of structural data submitted by the Original Equipment Manufacturer (OEM). Analyzing advanced component structures, coatings, and cooling schemes and identity promising technologies to pursue.

3.2.11 Develop requirements document and test plans for engine oil ratio test and endurance test; analyzing test and failure data to determine cause and mode of failure; recommending composite test plan including all weather propeller test performance mapping test, oil ratio test and endurance test.

3.2.12 Conduct particle analysis of oil debris generated from testing facility components to include weight measurement, Scanning Electron Microscope (SCM) and X-ray diffraction analysis.

3.2.13 Provide engineering support in the areas of design, operational performance, structural integrity, alternate part suitability, failure investigation and analysis, testing and data analysis for all Navy turbofan, turboprop, turboshaft, and reciprocating engines.

3.2.14 Evaluate fuel lubricity and low temperature fuel properties, provide process for handling and disposal of contaminated wastewater, and evaluating fuel “freezing” and low temperature viscosity effects on aircraft/engine performance.

3.2.15 Develop the testing method and data necessary to correlate various tests into a useable protocol to evaluate fuels to coke in laboratory test with its actual installed aircraft performance.

3.2.16 Perform engineering evaluations, inspections and investigations defining technical requirements, identifying shortfalls, and monitoring performance related to all Navy helicopter power drive systems and their components, engine mechanical systems and their components and auxiliary power systems and their components.

3.2.17 Perform test set-up, operation, data collection, reporting and data analysis to support military specification tests of fuels, lubricants, greases and solvents.

3.2.17.1 Maintain laboratory equipment. Perform calibrations as needed and report results to the laboratory manager. Make small repairs and modifications to existing laboratory test equipment and support equipment as necessary.

3.2.17.2 Perform sophisticated analytical tests using standard and non- standard test methods to investigate service related problems and/or study physical and chemical properties of alternative fuels and lubricants.

3.2.17.3 Prepare and provide recommendations, via Standard Work Packages, for laboratory test methods and/or processes.

3.2.17.4 Conduct round robin tests with other Navy laboratories to maintain and/or improve repeatability and reproducibility test requirements.

3.2.17.5 Make recommendations to Laboratory Manager to improve test efficiency and accuracy.

3.2.17.6 Maintain records for all tests conducted and report results using the LIMS system.

3.2.17.7 Maintain and upgrade as necessary the Laboratory Information Management System (LIMS).

3.2.18 Support critical project management, technical, or business analysis of Naval Air Systems Command’s (NAVAIR) Strategic Propulsion Materials Reclamation Program and similar emergent Special Projects designed to improve affordability, maintain readiness, and reduce operational/sustainment costs.

3.2.18.1 Provide exchange/sale authority policy and procedural recommendations/support to facilitate the overall management and direction of a cross-competency technical team responsible for management, expansion, and development of current and future Government/Propulsion OEM Reclamation Programs, contracts, and agreements.

3.2.18.2 Provide support for task execution, products, and deliverables, provide liaison with NAVAIR Contracting Officer’s Representative (COR).

3.2.18.3 Provide interface for inter-service DoD leads and government and contractor Integrated Program Team leads/members, responds to time-sensitive task requirements, monitor overall quality and metrics, maintain responsibility for customer satisfaction, analyze material and cost data, assist in conducting project reviews and program reviews, identifies risks, and analyze mitigation plans.

3.2.19 Support engineering investigations

3.2.19.1 Make recommendations for maintenance and repair processes and procedures for propulsion and power systems and subsystems.

3.2.19.2 Inspect service hardware and make recommendations for improvement in design and manufacturing.

3.2.19.3 Support engineering change introductions into the Field Repair Centers.

3.2.19.4 Provide field service support. Devise, implement and report all corrective actions taken to maximize propulsion system operational capability and troubleshooting for technical publication updates/corrections. Perform troubleshooting, analysis of specific propulsion system problems, and on-site operator informal training.

3.2.19.5 Provide configuration management support.

3.2.19.6 Conduct quality inspections of manufacturing sites.

3.2.20 Advise designated Propulsion and Power Systems’ teams on implementation and execution of reliability roadmaps and propulsion and power systems management plans.

3.2.20.1 Coordinate with teams and provide monthly updates on status to goal to Propulsion Management Board (PMB) leadership for Measures of Effectiveness (MOEs).

3.2.20.2 Provide rapid response to readiness tasks from Office of the Chief of Naval Operations (OPNAV) and Propulsion Management Board.

3.2.20.3 Provide inputs and recommendations to the requirements generation process.

CDRLS: A006, A007, A008

3.3 INTEGRATED PROGRAM TEAM SUPPORT

(CLINs 0002, 0102, 0202, 0302, 0402) (O&MN Funded)

The contractor shall provide integrated program team support to the Navy’s Propulsion and Power Department for propulsion efforts in support of in-service and fielded systems. Tasks will include:

3.3.1 Review detailed design documents to evaluate quality assurance aspects of proposed Naval and Marine Corps aircraft propulsion and power systems installation designs and implementation approaches.

3.3.2 Contribute inputs during the development of test plans, methods and procedures for the evaluation of aircraft propulsion and power systems.

3.3.3 Provide engineering support for the maintenance and updates for the Engine Reliability Assessment Program (ERAP). The contractor will provide engineering assistance to update the model with current fleet data and assess the accuracy of the information being received from other databases. The contractor will ensure that the interface programs can communicate with modified government logistics databases.

3.3.4 The contractor will provide engineering support in the development of reliability metrics for Propulsion and Power subsystems such as auxiliary power units (APU’s), starters, generators and electrical systems. This effort may require the development of interface software to assess accuracy of data and support future trending efforts.

3.3.5 The contractor will provide technical experts in the areas of failure analysis and components such as bearing and gearbox to support testing and development in the Propulsion Systems Evaluation Facility (PSEF).

3.3.6 Monitor and inspect in-process fabrication, assembly and installation processes of propulsion and power systems to ensure quality of workmanship and conformance with applicable standards and specifications.

3.3.7 Monitor and investigate adverse trends affecting developmental and production Naval and Marine Corps aircraft propulsion and power systems quality, reliability and basic mission performance.

3.3.8 Perform inspections of Naval and Marine Corps aircraft to support production, in-service and overhaul quality assurance programs.

3.3.9 Conduct technical assessments of advanced technology air breathing propulsion and power components and systems in terms of performance, technical risk, soundness of design, and cost.

3.3.10 Perform engineering evaluations of structural data submitted by the Original Equipment Manufacturer (OEM). Analyzing advanced component structures, coatings, and cooling schemes and identity promising technologies to pursue.

3.3.11 Develop requirements document and test plans for engine oil ratio test and endurance test; analyzing test and failure data to determine cause and mode of failure; recommending composite test plan including all weather propeller test performance mapping test, oil ratio test and endurance test.

3.3.12 Conduct particle analysis of oil debris generated from testing facility components to include weight measurement, Scanning Electron Microscope (SCM) and X-ray diffraction analysis.

3.3.13 Provide engineering support in the areas of design, operational performance, structural integrity, alternate part suitability, failure investigation and analysis, testing and data analysis for all Navy turbofan, turboprop, turboshaft, and reciprocating engines.

3.3.14 Evaluate fuel lubricity and low temperature fuel properties, provide process for handling and disposal of contaminated wastewater, and evaluating fuel “freezing” and low temperature viscosity effects on aircraft/engine performance.

3.3.15 Develop the testing method and data necessary to correlate various tests into a useable protocol to evaluate fuels to coke in laboratory test with its actual installed aircraft performance.

3.3.16 Perform engineering evaluations, inspections and investigations recommending technical requirements, identifying shortfalls, and monitoring performance of fielded systems related to all Navy helicopter power drive systems and their components, engine mechanical systems and their components and auxiliary power systems and their components.

3.3.17 Perform test set-up, operation, data collection, reporting and data analysis to support military specification tests of fuels, lubricants, greases and solvents.

3.3.17.1 Maintain laboratory equipment. Perform calibrations as needed and report results to the laboratory manager. Make small repairs and modifications to existing laboratory test equipment and support equipment as necessary.

3.3.17.2 Perform sophisticated analytical tests using standard and non- standard test methods to investigate service related problems and/or study physical and chemical properties of alternative fuels and lubricants.

3.3.17.3 Prepare and provide recommendations, via Standard Work Packages, for laboratory test methods and/or processes.

3.3.17.4 Conduct round robin tests with other Navy laboratories to maintain and/or improve repeatability and reproducibility test requirements.

3.3.17.5 Make recommendations to Laboratory Manager to improve test efficiency and accuracy.

3.3.17.6 Maintain records for all tests conducted and report results using the LIMS system.

3.3.17.7 Maintain and upgrade as necessary the Laboratory Information Management System (LIMS).

3.3.18 Support critical program management, technical, or business analysis of Naval Air Systems Command’s (NAVAIR) Strategic Propulsion Materials Reclamation Program and similar emergent Special Projects designed to improve affordability, maintain readiness, and reduce operational/sustainment costs for fielded systems.

3.3.18.1 Provide exchange/sale authority policy and procedural recommendations/support to facilitate the overall management and direction of a cross-competency technical team responsible for management, expansion, and development of current and future Government/Propulsion OEM Reclamation Programs, contracts, and agreements.

3.3.18.2 Provide support for task execution, products, and deliverables, provide liaison with NAVAIR Contracting Officer’s Representative (COR).

3.3.18.3 Provide interface for inter-service DoD leads and government and contractor Integrated Program Team leads/members, responds to time-sensitive task requirements, monitor overall quality and metrics, maintain responsibility for customer satisfaction, analyze material and cost data, assist in conducting project reviews and program reviews, identifies risks, and analyze mitigation plans.

3.3.19 Support engineering investigations

3.3.19.1 Make recommendations for maintenance and repair processes and procedures for propulsion and power systems and subsystems.

3.3.19.2 Inspect service hardware and make recommendations for improvement in design and manufacturing.

3.3.19.3 Support engineering change introductions into the Field Repair Centers.

3.3.19.4 Provide field service support. Devise, implement and report all corrective actions taken to maximize propulsion system operational capability and troubleshooting for technical publication updates/corrections. Perform troubleshooting, analysis of specific propulsion system problems, and on-site operator informal training.

3.3.19.5 Provide configuration management support.

3.3.19.6 Conduct quality inspections of manufacturing sites.

3.3.20 Advise designated Propulsion and Power Systems’ teams on implementation and execution of reliability roadmaps and propulsion and power systems management plans.

3.3.20.1 Coordinate with teams and provide monthly updates on status to goal to Propulsion Management Board (PMB) leadership for Measures of Effectiveness (MOEs).

3.3.20.2 Provide rapid response to readiness tasks from Office of the Chief of Naval Operations (OPNAV) and Propulsion Management Board.

3.3.20.3 Provide inputs and recommendations to the requirements generation process.

3.4 INTEGRATED PROGRAM TEAM SUPPORT

(CLINs 0003, 0103, 0203, 0303, 0403) (AP(N) Funded)

The contractor shall provide integrated program team support to the Navy’s Propulsion and Power Department for propulsion efforts related to modification of in-service aircraft or deploying production systems. Tasks will include:

3.4.1 Review detailed design documents to evaluate quality assurance aspects of proposed Naval and Marine Corps aircraft propulsion and power systems installation designs and implementation approaches.

3.4.2 Contribute inputs during the development of test plans, methods and procedures for the evaluation of aircraft propulsion and power systems.

3.4.3 Provide engineering support for the Engine Reliability Assessment Program (ERAP). The contractor will provide engineering assistance to update the model with current fleet data and assess the accuracy of the information being received from other databases. The contractor will ensure that the interface programs can communicate with modified government logistics databases.

3.4.4 The contractor will provide engineering support in the development of reliability metrics for Propulsion and Power subsystems such as auxiliary power units (APU’s), starters, generators and electrical systems. This effort may require the development of interface software to assess accuracy of data and support future trending efforts.

3.4.5 The contractor will provide technical experts in the areas of failure analysis and components such as bearing and gearbox to support testing and development in the Propulsion Systems Evaluation Facility (PSEF).

3.4.6 Monitor and inspect in-process fabrication, assembly and installation processes of propulsion and power systems to ensure quality of workmanship and conformance with applicable standards and specifications.

3.4.7 Monitor and investigate adverse trends affecting production Naval and Marine Corps aircraft propulsion and power systems quality, reliability and basic mission performance.

3.4.8 Perform inspections of Naval and Marine Corps aircraft to support production, in-service and overhaul quality assurance programs.

3.4.9 Conduct technical assessments of advanced technology air breathing propulsion and power components and systems in terms of performance, technical risk, soundness of design, and cost.

3.4.10 Perform engineering evaluations of structural data submitted by the Original Equipment Manufacturer (OEM). Analyzing advanced component structures, coatings, and cooling schemes and identity promising technologies to pursue.

3.4.11 Develop requirements document and test plans for engine oil ratio test and endurance test; analyzing test and failure data to determine cause and mode of failure; recommending composite test plan including all weather propeller test performance mapping test, oil ratio test and endurance test.

3.4.12 Conduct particle analysis of oil debris generated from testing facility components to include weight measurement, Scanning Electron Microscope (SCM) and X-ray diffraction analysis.

3.4.13 Provide engineering support in the areas of design, operational performance, structural integrity, alternate part suitability, failure investigation and analysis, testing and data analysis for all Navy turbofan, turboprop, turboshaft, and reciprocating engines.

3.4.14 Analyze fuel lubricity and low temperature fuel properties, provide process for handling and disposal of contaminated wastewater, and evaluating fuel “freezing” and low temperature viscosity effects on aircraft/engine performance.

3.4.15 Construct the testing method and data necessary to correlate various tests into a useable protocol to evaluate fuels to coke in laboratory test with its actual installed aircraft performance.

3.4.16 Perform engineering evaluations, inspections and investigations defining technical requirements, identifying shortfalls, and monitoring performance of fielded systems related to all Navy helicopter power drive systems and their components, engine mechanical systems and their components and auxiliary power systems and their components.

3.4.17 Perform test set-up, operation, data collection, reporting and data analysis to support military specification tests of fuels, lubricants, greases and solvents.

3.4.17.1 Maintain laboratory equipment. Perform calibrations as needed and report results to the laboratory manager. Make small repairs and modifications to existing laboratory test equipment and support equipment as necessary.

3.4.17.2 Perform sophisticated analytical tests using standard and non- standard test methods to investigate service related problems and/or study physical and chemical properties of alternative fuels and lubricants.

3.4.17.3 Prepare and provide recommendations, via Standard Work Packages, for laboratory test methods and/or processes.

3.4.17.4 Conduct round robin tests with other Navy laboratories to maintain and/or improve repeatability and reproducibility test requirements.

3.4.17.5 Make recommendations to Laboratory Manager to improve test…