N0024423R0070-0 Attachments.pdf
PDF 2 MB Posted
- Solicitation number
- N0024423R0070
About this file
This document package contains technical exhibits and a quality assurance surveillance plan (QASP) for food services at Naval Air Station Lemoore in California. The Navy seeks food services support for the galley, which provides breakfast from 0500-0730 Monday through Friday, lunch from 1030-1300 Monday through Friday, and dinner from 1630-1800 Sunday through Thursday. The incumbent contractor must staff one cashier station for breakfast, lunch, and dinner on weekdays and one cashier for Sunday dinner. The galley facilities encompass approximately 9,220 square feet, including dining, food preparation, dishwashing, and storage areas. The technical exhibits describe the galley equipment inventory, which includes 74 dining tables, 306 chairs, steam tables, griddles, and smallwares. The QASP establishes methodology for monitoring contractor performance across eight critical areas to ensure contract standards are met.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q1 Response.pdf | ||
| N0024423R0070-1 SF30.pdf | ||
| N0024423R0070-1 SF1449.pdf | ||
| N0024423R0070-0 SF1449.pdf | ||
| CBA Lemoore 2022 ITPEU Supplemental.pdf | ||
| CBA Eff 1-Oct-23.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 4 – LIST OF GALLEY MEAL HOURS
LEMOORE OPERATIONS GALLEY
GENERAL MESS MEAL HOURS
NORMAL MEAL HOURS
WEEKDAYS SATURDAYS SUNDAY/HOLIDAYS
BREAKFAST 0500-0730 (MON-FRI) CLOSED CLOSED
LUNCH 1030-1300 (MON-FRI) CLOSED CLOSED
DINNER 1630-1800 (MON-THU) CLOSED 1630-1800 (SUN)
SERVING LINES
WEEKDAYS
MAXIMUM/NORMAL
SATURDAYS
MAXIMUM/NORMAL
SUNDAY/ HOLIDAYS
MAX/NORM
BREAKFAST 1 (MON-FRI) CLOSED CLOSED
LUNCH 2 (MON-FRI) CLOSED CLOSED
DINNER 1 (MON-THU) CLOSED 1 (SUN)
CASHIER STATIONS #*
WEEKDAYS
MAXIMUM / NORMAL
SATURDAYS
MAXIMUM / NORMAL
SUNDAYS &
HOLIDAYS
MAXIMUM / NORMAL
BREAKFAST 1 (MON-FRI) CLOSED CLOSED
LUNCH 1 (MON-FRI) CLOSED CLOSED
DINNER 1 (MON-THU) CLOSED 1 (SUN)
*Required number of Cashiers
Note: 1. Galley is closed Friday Dinner, Saturday all meals and Sunday Breakfast and Lunch.
2. Midrats are provided for a small number of RIK personnel from 2300-0100. All services are provided by military personnel during midrats.
3. Galley is closed on holidays. If the holiday falls on a Monday, the galley will be closed Sunday and Dinner will be served on Monday (observed holiday).
TECHNICAL EXHIBIT 5- GALLEY SPACES MEASUREMENTS
SPACE NOMENCLATURE L (ft) W (Ft)
AREA
(Sq Ft)
FLOOR
MATERIAL
DINING ROOM INCLUDING
SERVING AREA 6,800
CERAMIC TILE /
QUARRY TILE
DISHWASHING ROOM
(SCULLERY) 1,520 QUARRY TILE
TRASH & GARBAGE ROOM 70 CONCRETE
UTENSILS WASHING ROOM
(DEEP SINK) 200 QUARRY TILE
LOCKER ROOM, LAVATORIES 406
CERAMIC TILE,
CONCRETE,
VINYL TILE
REAR PLATFORM 224 CONCRETE
TOTAL 9220
NAVAL AIR STATION LEMOORE
MAIN ENTRANCE
FEMALE
HEAD
MALE
HEAD
FOOD
SERVICE
OFFICE
SCULLERY
CASHIER
SALAD
BAR
DESSERT
BAR
BEV
BAR
BEV
BAR
DESSERT
BAR
e
SPEED LINE MAIN LINE
UTILITY
FREEZER CHILL
FSO OFFICE
WATCH CAPTAIN
OFFICE
DEEP
SINK
DRY
STORE
ROOM
MALE
HEAD
FEMALE HEAD
CHILL
CHILL CHILL
VEGS
PREP BACK DOCK FREEZER
BOILER
ROOM
GALLEY FOOD PREP AREA
EXIT
EXIT
EXIT
EXIT
EXIT EXIT
EXIT EXIT
DINING
AREA
DINING
AREA
DINING
AREA
DINING
AREA
Note: Highlighted in Green are areas that will be maintained by the contractors.
Highlighted in Red are areas that will be maintained by the military personnel.
TECHNICAL EXHIBIT 7 – EQUIPMENT/FURNITURE LIST
LEMOORE OPERATIONS GALLEY BLDG 10
DINING AREA
ITEM NAME MANUFACTURER MODEL # SERIAL #
BEVERAGE BAR CHICO SALES
BEVERAGE BAR CHICO SALES
MILK DISPENSER SILVER KING SKMAJ2 NBAC00416C
MICROWAVE OVEN AMANA RCS10DSE 1406611336
COFFEE/AIR POT BREWER COFFEE PRO ALCH-AP CP00005588
COFFEE/AIR POT BREWER COFFEE PRO ALCH-3 CP00005757
MILK DISPENSER SILVER KING SKMAJ2 NBAC00410A
SODA MACHINE PEPSI PBDIDC255 74A1928P5018
SODA MACHINE PEPSI PBDIDC255 74A1915P5068
JUICE MACHINE NESTLE EX-48EPH 105970047
JUICE MACHINE EXPRESSE EXTRAPH 62A1049EX02
COFFEE MACHINE DUNKIN
COFFEE MACHINE DUNKIN
DESSERT BAR CHICO SALES
DESSERT BAR CHICO SALES
SALAD BAR CHICO SALES
SALAD BAR CHICO SALES
BREAD TOASTER AVANTCO CTA7001 51000914T140
SERVING LINES
FOOD WARMER CABINET METRO C519-CFC-4 C5-CM-009006
FOOD WARMER CABINET METRO C519-CFC-4 C5-CM-009004
STEAM TABLE DUKE E6CBDGM 5111179
STEAM TABLE RANDELL RAN HTD-4S W288881-1-4
STEAM TABLE RANDELL RAN HTD-4S W288881-1-3
GRIDDLE IMPERIAL CFETG-72-E 4567812
GRIDDLE VULCAN HEG72D CF-1006096 F06
GRIDDLE LANG 172T GT1720816A0013
TOASTER OVEN MENU MASTER MXP22 1508101224
PANINI GRILL ADCRAFT SG-813B 3140230010
DEEP SINK / POTS
AND PAN ROOM
ITEM NAME MANUFACTURER QTY CONDITION
POT WASHER HOBART 1 GOOD
RESTROOM
Male/Female 2/2
Commode 2/5
Sink 3/4 Urinal 2/0
SCULLERY ROOM
DISHWASHER ECOLAB 1
DELI LINE
VEGETABLE
PREPARATION
ROOM
TECHNICAL EXHIBIT 8 – MESS GEAR INVENTORY
ITEM QTY
DINING ROOM:
Dining Tables 74 Chairs 306 Salt & Pepper Shaker, Set 127 Lazy Susan 74 Napkin Holder/Dispensers 74 Toothpick Dispensers 1 Cashier Counter 1 Electronic Cash Register 1 Safety & Operating Instructions 1 Clock 2 Cashier Chair 1 Double Doors 2 Exit Sign 7 Floor Vent 14 Menu Board/TV Monitors 2 Cereal Cart 0 Coat & Hat Wall Rack 1 Pictures 8 Fly Fans 10 Overhead Speakers 8 Plaque “Pledge of Service to Patrons” 1 Microwave Oven 1 Table Top Fake Plants 0 Flat Screen TV 4 Display Awards Case Cabinet 1
MASTER-AT-ARMS SHACK:
Chair 1 Counter/Desk 1 Trash Can 1 POW Display Table 1
SERVICE AREA:
Counter 2 Food Holding/Warming Cabinet 2
Ice Machine 2 Deep Fat Fryer 0 Mobile Plate Dispenser 3 Mobile Griddle 3 Hot Food Serving Counter 4 Cold Food Counter 2 Grill Counter 0 Exhaust Ventilator 4 Silverware Dispenser Holders 12 Tray Dispensers 2 Toaster 1 Coffee Dispensers “Dunkin” 2 Soup Station 2 Carbonated Beverage Dispensers “Pepsi” 2 Coffee Makers 2 Iced Tea, Dispensers 2 Bulk Milk Dispensers 2 Sandwich Oven 1 Beverage Counters 2 Salad Bars 2 Bowl/Plate Dispensers 10 Bussing Cart 10 Water Hose & Spray Nozzle 1
VESTIBULE:
Trash Can 1 Light Fixture 1
LAVATORY, MEN:
Lockers 18 Trash Can 1 Mirror 1 Urinals 2 Commode 1 Paper Towel Dispenser 1 Sink 1 Hand Soap Dispenser 1
LAVATORY, WOMEN:
Lockers 16 Sinks 2 Mirrors 4 Trash Can 1 Commodes 3 Paper Towel Dispenser 1 Light Fixtures 4 Hand Soap Dispenser 1 Chairs 3
TRASH & GARBAGE ROOM:
Swab Rack 1 Garden Hose 0
VEGS PREP AREA:
Work Tables 1 Vegetable Prep Sink 2 Vegetable Cutter 0 Vegetable Mobile Reefer 2 Hand Wash Sink 0 Utility Sink 0 Mobile Carts 0 Light Fixtures 4
POTS, PANS DEEP SINK AREA:
Sinks 3 Garbage Grinder 1 Sink 0 Sink Heater/Booster Heater 0 Wall Shelf 0 Trash Can 1 Work Table 1 Light Fixtures 5 Counter 1 Vent Duct 1
DISHWASHING ROOM/SCULLERY:
Dishwasher Machine 1 Garbage Grinder 1
Sinks 2 Vent Ducts 6 Floor Drain 4 Work Tables 3 Light Fixtures 8 Hand Soap Dispenser 1 Swabs 0 Push Broom 0
DINNERWARE:
Service Trays 543 Dinner Plates 9” 252 Dessert Plates 4” 115 Bowl, Soup 5 5/8” 210 Cup, Coffee 10oz 45 Cup, Tumbler 220 Knifes 148 Forks 239 Spoons 168
MISCELLANEOUS UTENSILS:
Pan Racks 2 Roasting Pans 9 Sheet Pans 50 Colanders 2 Dish Pans 0 Sifter 0 Bowl, Mixing 3 Measuring Cups 13 Cutting Board Rack 1 Serving Line Covers 15 Scale 2 Insert, Pan 2” 34 Insert, Pan 4” 20 Insert, Pan 6” 2 Tongs 20 Skimmer Spoon 1 Perforated Spoons 15 Garbage Cans 4
Serving Spoons 10 Ladles 14 Wire Whips 6 Ice Cream Scoops 8 Spatulas 7 Dough Cutter 0 Can Opener 1 Paddle 10
JANITORIAL EQUIPMENT:
Vacuum Cleaner 1 Buffer 1 Buckets 6 Brooms 6 Swabs 6
QUALITY ASSURANCE SURVEILLANCE PLAN
QUALITY ASSURANCE PLAN
1. INTRODUCTION
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to monitor and evaluate contractor performance in connection with the Commander Navy Region Southwest (CNRSW) Support. The QASP establishes the methodology for measuring key performance in the stated performance work areas and establishes the standard of performance for each.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the QASP and the contractor’s quality control plan (QCP), and to ensure that the Government pays only the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members associated with the QASP, identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e. results, not compliance). This QASP will define the performance management approach taken by the COR to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the QASP are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessments. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the contract are being achieved by the contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of the work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. The QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction and other performance requirements in the QASP. The contractor will develop and implement a performance management system with processes to assess and report its performance to the COR. This QASP enables the Government to take advantage of the contractor’s QC program.
1.3.2 The COR will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against performance objectives. The Government will notify the contractor when performance is less than satisfactory. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2. ROLES AND RESPONSIBILITIES
2.1 Contracting Officer
The Contracting Officer is responsible for monitoring contract compliance, contract administration and cost control and for resolving any differences between the observations by the COR and the contractor. The Contracting Officer has designated the COR as the Government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the Contracting Officer.
2.2 Contracting Officer’s Representative (COR)
The Contracting Officer’s Representative (COR) is designated in writing by the Contracting Officer to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the contract and ensures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action. The COR will be responsible for documenting the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
2.3 Designated Acceptance Officials
Personnel authorized to submit or accept deliverables are designated below. While other personnel may physically deliver or receive deliverables and perform the reviews to determine acceptability, only designated personnel may authorize the submission of deliverables or approve/reject deliverables.
Government personnel authorized to submit or accept/reject deliverables: CSCS SCOTT T.
SCHAARE, CNRSW, NAS Lemoore, COR
3. IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/ QUALITY
LEVELS
The required performance standards and/or quality levels are included herein in the QASP, as specified in Attachment 1, “Performance Requirements Summary Tables”. The four critical areas items defined herein are also identified within the Statement of Work as subject to monitoring under this QASP. The eight critical areas that will be used to measure performance success are:
compliance with sanitation requirements of the food code and state and local laws/regulations;
timely delivery of services and courteous employees, good communication with the Government, cleanliness of the facility;
accurate cashier services;
timely delivery of services and food production in accordance with the daily menu;
food cost control; and accurate monthly provision inventory.
The “Performance Requirements Summary Tables” identify each of the eight areas in more detail and includes the specific method of surveillance, inspection cycle, performance requirements, performance standard/AQL, sampling procedure and inspection procedure.
4. METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the Government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
Random Monitoring - Random monitoring shall be conducted if and when specified in the Contractor periodically as defined by the COR. The random monitoring shall be performed by the COR.
One Hundred–Percent Inspection – This surveillance type is preferred for those tasks that occur infrequently. It is also used frequently for those tasks having very stringent performance requirements. When this type surveillance is used, the COR must inspect and evaluate the contractor’s performance each time it is performed. The results of the contractor’s overall performance are then evaluated to determine the acceptability of the lot.
Periodic Inspection - Periodic inspections shall be conducted if and when specified in the
Contract. The COR typically performs the periodic inspection on a monthly basis.
4.2 Observing Contractor Performance
The COR must inspect task performance by either watching actual task performance, physically checking an attribute of the completed task, checking a management report, or otherwise inspecting the task or its results to determine whether or not the performance meets the standards contained in the contract. The COR should become familiar with the standards and requirements of compliance documentation set forth in the contract and incorporate surveillance of such requirements onto the overall plan. It is suggested that technical experts, who are most familiar with compliance requirements, be utilized as an extension of the COR.
4.3 Customer Feedback
The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction.
Customer satisfaction is the most significant indicator of success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR, as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and must be forwarded to the COR. The COR will accept those customer complaints and investigate further.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
4.4 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in “Performance Requirements Summary Table”, are structured to allow the contractor to manage how the work is performed.
5. QUALITY ASSURANCE DOCUMENTATION
5.1 Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards/AQLs are expressed in the QASP and are assessed using the performance monitoring techniques shown in Attachment 1.
CNRSW is a field activity will be participating in the exchange of deliverables and will be subject to deliverable acceptance process. Items such as system documentation, reports, and test results are examples of deliverables that the Contractor might provide to the Government for review and acceptance. Examples of Government deliverables are items such as review comments, marked-up documents returned to the Contractor, reference material, or other Government Furnished Information/Equipment (GFI/E). Deliverable Acceptance provides an opportunity for the receiving party to formally review a product and assess whether or not it conforms to specifications or will satisfy the requirements for its intended use. Some products are complete as is when delivered while others will be work product inputs into the creation of other deliverables or form part of the baseline for subsequent work to be performed. For example GFI such as test data would be a work product input to a testing process and a design specification would become part of the baseline. Aspects of the Deliverable Acceptance process are detailed in the remainder of this section.
Final inspection and acceptance of all deliverables shall be performed at the place of delivery.
The government requires a period not to exceed 30 days after receipt of the final deliverable item(s) for inspection and acceptance or rejection. All deliverables must be submitted directly to the COR. The COR will monitor the contractor efforts to ensure technical suitability. If the deliverable does not meet the specified criteria, it will be returned by the government. After notification that the deliverable did not meet the acceptance criteria, the contractor shall re-submit the deliverable within 14 calendar days. Upon re-submission by the contractor, the government will reapply the same acceptance criteria. If the deliverable does not meet the acceptance criteria a second time the government might consider the Contractor as having deficient performance. The Contractor shall permit the Contracting Officer or designated representatives’ access at any reasonable time to all records, data, and facilities used in the performance of contemplated services.
6. ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.1.1 An individual authorized to accept/reject deliverables will need to complete Section 3 of the Deliverable Submission/Acceptance Form by acknowledging the acceptance of the deliverable, conditional acceptance of the deliverable, or rejecting the deliverable.
a. Acceptance of a deliverable means that the deliverable conforms to specifications or will satisfy the requirements for its intended use and will be considered completed by the submitting party. Accepted deliverables may become part of the baseline for subsequent work or may be work product inputs for future tasks. As important as it is to complete the review and acceptance of deliverables in a timely manner so as not to impede schedules, it is equally important that a thorough review be done so as not to overlook critical aspects that could adversely affect subsequent deliverables. Additional work on or changes to accepted deliverables will be considered to be new deliverables and may affect scope, cost, and or schedule.
b. Conditional acceptance means that the deliverable essentially conforms to specifications or will satisfy the requirements for its intended use but some non-critical changes may need to be made. The reason(s) for the conditional acceptance and actions that may be deemed necessary to make the deliverable acceptable must be detailed in the Comments block of Section 3 of the Deliverable Submission/Acceptance Form. This will form a basis for discussion and understanding between the two parties of the steps necessary to make the deliverable acceptable.
In some instances the conditional acceptance may not require any corrective action but full acceptance may be contingent upon some future event. The actions necessary to attain acceptance should represent low risk because conditionally accepted deliverables may become part of the baseline for subsequent work or may be work product inputs for future tasks.
c. Rejection of a deliverable means that it fails to conform to specifications or will not satisfy the requirements for its intended use. The reason(s) for rejection and actions necessary that may be deemed necessary to make the deliverable acceptable must be detailed in the Comments block of Section 3 of the Deliverable Submission/Acceptance Form. This will form a basis for discussion and understanding between the two parties of the steps necessary to make the deliverable acceptable.
d. The Deliverable Submission/Acceptance Form will always reflect the date that the deliverable was submitted for acceptance as well as the number of business days to review and accept or reject the deliverable. A default of five business days will be used. Of course it may not be realistic to expect that all deliverables can be reviewed and accepted within five business days. Whenever possible the parties involved should agree upon those cases where more or less review time will be required for planned deliverables. This will allow these expected review durations to be used in project plans to more accurately project the start and completion dates of dependent activities. Circumstances may arise such that a review cannot be completed within the time agree to and reflected on the Deliverable Submission/Acceptance Form. In such cases an extension of the review period should be discussed and agreed to by the parties before the scheduled review completion date. If project milestone dates are to be met, deliverable reviews cannot be allowed to continue for indeterminate periods of time. Therefore, deliverables not reviewed within the specified review period will be considered accepted.
6.2 Reporting
The Government will use the results of the Deliverable Submission/Acceptance to demonstrate whether the contractor is meeting the stated objectives and/or performance standards/AQLs.
6.2.1 The COR will, in addition to providing documentation to the Contracting Officer, maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’ s performance of the quality assurance function. All such records will be retained for the life of this contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
6.3 Reviews and Resolution
6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the COR or other Government personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor. However, if the need arises, the contractor will meet with the COR as often is required or per the contractor’s request. The agenda of the reviews may include:
Monthly performance assessment data and trend analysis
Issues and concerns of both parties
Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis.
Recommendations for improved efficiency and/or effectiveness.
Issues arising from the performance monitoring processes.
6.3.2 The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance in any critical area.
6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action.
Decisions regarding changes to metrics, thresholds or service levels should be clearly documented. Changes to service levels, procedures and metrics may be incorporated as a contract modification at the convenience of the Contracting Officer.
7.0 Notification of Deficient Performance
Contractor performance deficiencies identified during the 6 month evaluation periods will be brought to the immediate attention of the COR. When contractor performance in any area approaches or reaches below the performance standard, or is not fully compliant with the requirements of the contract, the COR will notify the Program manager of the discrepancy in writing. The contractor will then have no more than one week to implement corrective action and to explain the corrective action in writing to the COR. If the contractor’s response resolves the problem, no further action will be taken. If the problem continues after implementation of corrective action, the COR will submit a Contract Discrepancy Report (CDR) to the contractor.
Unsatisfactory contractor performance that causes significant injury or damage to personnel or equipment, which puts personnel or equipment unnecessarily at risk, or which results from gross negligence or inattention to standing procedures may result in an immediate Contract Discrepancy Report (CDR) with no advance notification by the COR. When the COR submits a CDR, the contractor is required to prepare a formal reply delineating corrective action. If the reply satisfies the COR, no further action will be taken. If replies are unsatisfactory and resolution cannot be obtained, the COR will forward the contractor’s reply along with the recommended action to the Contracting Officer to initiate formal action against the contractor for unsatisfactory contract performance.
| NASL TE 4 List of Galley Meal Hours Updated 28JUN23 |
| NASL TE 5 Galley Space Measurements |
| NASL TE 6 Galley Layout |
| NASL TE 7 EquipmentFurniture List UPDATED 28JUN23 |
| NASL TE 8 Mess Gear Inventory UPDATED 28JUN23 |
| QASP Lemoore Food Service |
File details come from the government source that posted it. Updated .