The file's text, extracted by GovTribe without its formatting.
PRESOLICITATION NOTICE
N00189-13-T-PB19
PNS INTENDS TO SOLICIT FOR THE RENTAL OF TEMPORARY VENTILATION, HEATING AND COOLING EQUIPMENT FOR POINT LOMA NAVAL BASE, IN SAN DIEGO, CA. THE SIZE STATUS FOR THIS REQUIREMENT WILL BE UNRESTRICTED.
THE PERIOD OF PERFORMANCE IS 10/15/2013 TO 03/04/2014.
SEE BELOW FOR THE GENERAL DESCRIPTION.
| NO |
| DESCRIPTION |
| TYPE [STYLE] –SZ |
| START |
| END |
| V01 |
| Chiller Module |
| CHLR [ 3" ]–N |
| 10/15/13 |
| 03/04/14 |
| V02 |
| Pump |
| PUMP [ 3" ]–N |
| 10/15/13 |
| 03/04/14 |
| V03 |
| Desiccant Dehumidification Unit |
| DDU [ELEC]–N |
| 10/15/13 |
| 03/04/14 |
| V04 |
| Desiccant Dehumidification Unit |
| DDU [ELEC]–N |
| 10/15/13 |
| 03/04/14 |
| V05 |
| Heating Coil only |
| HTGC [ELEC]–M |
| 10/15/13 |
| 03/04/14 |
| V06 |
| Heating Coil only |
| HTGC [ELEC]–M |
| 10/15/13 |
| 03/04/14 |
| V07 |
| Cooling Coil |
| CLGC [~FAN]–N |
| 10/15/13 |
| 03/04/14 |
| V08 |
| Cooling Coil |
| CLGC [~FAN]–N |
| 10/15/13 |
| 03/04/14 |
| V09 |
| Air-Handling Unit |
| AHU [EXH]–N |
| 10/15/13 |
| 03/04/14 |
| V10 |
| Air-Handling Unit |
| AHU [EXH]–N |
| 10/15/13 |
| 03/04/14 |
| V11 |
| Temperature Conditioning Coil |
| TCC [H+C]–L / 2N |
| 10/15/13 |
| 03/04/14 |
| V11 Alt |
| Alternate Manifold |
| MANF [4":3"×2]–L |
| 10/15/13 |
| 03/04/14 |
| V12 |
| Temperature Conditioning Coil |
| TCC [H+C]–L / 2N |
| 10/15/13 |
| 03/04/14 |
| V12 Alt |
| Alternate Manifold |
| MANF [4":3"×2]–L |
| 10/15/13 |
| 03/04/14 |
| V13 |
| Chiller Module |
| CHLR [ 6" ]–X |
| 10/15/13 |
| 03/04/14 |
| V14 |
| Pump |
| PUMP [ 6" ]–X |
| 10/15/13 |
| 03/04/14 |
| V15 |
| Manifold |
| MANF [4":6"×2]–X |
| 10/15/13 |
| 03/04/14 |
| V16 |
| Manifold |
| MANF [4":6"×2]–X |
| 10/15/13 |
| 03/04/14 |
| V17 |
| Manifold |
| MANF [4":6"×2]–X |
| 10/15/13 |
| 03/04/14 |
| V18 |
| Manifold |
| MANF [4":3"×2]–L |
| 10/15/13 |
| 03/04/14 |
| V19 |
| Hose |
| HOSE [6"CAM]–X |
| 10/15/13 |
| 03/04/14 |
| V20 |
| Flexible Ducting |
| DUCT [WIRE]–G |
| 10/15/13 |
| 03/04/14 |
| V21 |
| Emergency Stop |
| E-STOP [AHU]–4 |
| 10/15/13 |
| 03/04/14 |
DETAILED SPECIFICATIONS AND SOLICITATION DOCUMENTS WILL BE PROVIDED SHORTLY.