20RJM40_sol_0002.pdf

PDF 25 KB Posted

Attached to
REGENERATIVE BATTERY TEST SYSTEM
Solicitation number
N0016420RJM40
Issued by

View the file

Other files

File Type Posted
20RJM40_SOL_0003.pdf PDF
20RJM40_sol_0002_att1.pdf PDF
20RJM40_SOL_0001_att1.pdf PDF
20RJM40_SOL_0001.pdf PDF
20RJM40_SOL_att1.zip ZIP file
20RJM40_SOL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to update Attachment 3 w ith additional answ ers to vendor questions, clarify the SOW, and extend the solicitation due date to 24 August 2020.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0016420RJM40

X 9B. DATED (SEE ITEM 11)

16-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Aug-2020

CODE

NAVAL SURFACE WARFARE CENTER CRANE DIV

L. SPARKS (812-854-5351)

BLDG 3373

300 HWY 360

CRANE IN 47522-5001

N00164 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0016420RJM40

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 4.0 - CLAUSES & OTHER FULL TEXT INFORMATION

SUMMARY OF CHANGES

SECTION 1.0 - SCHEDULE/INSPECTION & ACCEPTANCE/DELIVERY

The required response date/time has changed from 17-Aug-2020 01:00 PM to 24-Aug-2020 01:00 PM.

The following have been modified:

STATEMENT OF WORK

Naval Surface Warfare Center, Crane Division (NSWC Crane)

Code JXMT, BLDG 3287W

300 HWY 361

Crane, IN 47522-5001

Statement of Work for 40-48 Cells Battery Test System

1.0 SCOPE:

1.1 This statement of work (SOW) describes the requirements of

Regenerative Commercial Off-The-Shelf DC Battery Cycling test system that shall be one system with the capability to evaluate 40-48 cells/battery testing. The Battery Test System shall be used for continuous sourcing and loading up to 60 VDC at 4,500 amperes or power capability of 270kW. The Battery Test System shall be movable, being housed in cabinet structures that shall include casters, leveling feet, and crane eyelets. The total Battery Test

System shall be up to three cabinets stood side by side. The Battery

Test system is capable of constant current, constant voltage, constant power and constant resistance operational modes, and provide overvoltage, over current, over power and over temperature protection. The communications and control actions for the Battery

Test System are accomplished utilizing LabVIEW drivers over an

Ethernet interface. The Battery Test System will be installed in

Submarine Valve Regulated Lead Acid (SVRLA) Battery Test

Laboratory at NSWC Crane. The Battery Test System shall come with programmable safety and isolation features protecting the unit-under-test (UUT) from either user supplied limits or double isolating of the UUT from the Facility AC power should grid-related issues exist. These safety features are stored and activated within the system and may not rely on external software tools.

2.0 REQUIREMENTS:

2.1 The Battery Test System technical requirements are provided in the attached 40-48 Cells Battery Test System Specification.

2.2 BATTERY TEST SYSTEM CALIBRATION:

2.2.1 The Battery Test System shall include detailed system calibration procedures and an easily accessible calibration program. The

Battery Test System calibration shall be able to be performed by the user.

2.2.2 The Battery Test System calibration procedure shall be semi-automated and shall only require a calibrated multi meter, a calibrated current shunt, and an isolated voltage source.

2.2.3 For modular based proposed systems, It is acceptable for individual components to be calibrated one at a time

2.2.4 The Battery Test System shall be delivered calibrated or calibrated on site to NIST traceable standards with a calibration that is valid for a full year.

2.3 INSTALLATION:

2.3.1 The contractors shall be briefed to safety requirements and site requirements prior to start of work.

2.3.2 The Battery Test System connections to both power and cooling Air shall be available and installed.

2.3.3 NSWC Crane personnel will install the Battery Test System and connect required utilities.

2.3.4 The Battery Test System contractor shall ensure that the system is functioning properly after shipment and installation.

2.4 TRAINING:

2.4.1 A minimum of one full day of on-site class room training at NSWC

Crane, Indiana (B-3287) shall be provided by the contractor within

10 working days after the installation of the Battery Test system.

2.4.2 The Training shall include a minimum of three (3) vendor personnel.

The training material shall be provided for up to five (5) students.

2.4.3 The training shall cover all safety, operation, troubleshooting, and maintenance of the Battery Test System.

2.5 FINAL DELIVERY AND ACCEPTANCE:

2.5.1 A set of Operating manuals for each system shall be provided.

(CDRL A001)

2.5.2 The contractor shall provide documentation that proves system meets or exceeds all requirements in the 40-48 Battery Test System

Specification. (CDRL A002)

2.5.3 The contractor shall provide Battery Test System verification test results that prove compliance with required output voltage, current, power, and AC ripple voltage. (CDRL A003)

2.6 NOTES:

2.6.1 The supplier shall provide WITH ITS PROPOSAL technical

documentation such as commercial specifications and data sheets to verify that the software is able to meet the requirements in 2.2.

(End of Summary of Changes)