16RGS55_sol_ATT1.pdf

PDF 240 KB Posted

Attached to
2M Kits and Parts
Solicitation number
N0016416RGS55
Issued by

About this file

ATTACHMENT 1

View the file

Other files

File Type Posted
N00164_16016_FBO.pdf PDF
Exhibit_D_CLIN_0020_Pricing_Matrix-Rev04212016.xlsx XLSX spreadsheet
EXHIBIT_B_Kits-Rev04212016.xlsx XLSX spreadsheet
16-R-GS55_Sol_Amend_0001.pdf PDF
Attachment_1_PPQ.doc DOC document
Exhibit_D_Sol_V1.xlsx XLSX spreadsheet
EXHIBIT_C_CLINs_0001-0019_Price_Matrix.xlsx XLSX spreadsheet
EXHIBIT_B_Kits.xlsx XLSX spreadsheet
GS55_SOW_11Jan2016_Exhibit_A.docx DOCX document
EXHIBIT_F_IDIQ_N00164-16-R-GS55_SALIENT_CHARACTERISTICS__OF_OR_EQUIVALENT_ITEMS.xlsx XLSX spreadsheet
Attachment_2_Past_Performance_Matrix.docx DOCX document
16RGS55_sol.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A ____TDP ____ TM __X___ OTHER _____ADMIN/MANAGEMENT DATA

D. SYSTEM/ITEM

2M Repair Kits

E. CONTRACT/PR NO.

F. CONTRACTOR

N00164-16-R-GS55

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A001

Status Report

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

SOW Para 4.0

6. REQUIRING OFFICE

DI-MGMT-80368A GXST

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT MONTHLY 30 DAYS ARO

b. COPIES

(e-mail)

8. APP CODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

N N/A N/A Reg Repro

The following paragraphs are applicable: 2, 3, 3.1, and 3.24.

Deliver to:

Crane_2M@navy.mil

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

DESTRUCTION NOTICE – For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

GOVERNMENT DOCUMENTATION SHALL BE DESTROYED UPON COMPLETION OF THE

CONTRACT OR PURCHASE ORDER, USE OF GOVERNMENT DOCUMENTATION FOR

COMMERCIAL PURPOSES IS FORBIDDEN.

Crane_2M@navy.mil 1

15. TOTAL

G. PREPARED BY

A. Ganster

H. DATE

1/11/16

I. APPROVED BY

N. Abrams

J. DATE

1/11/16 DD Form 1423-1, 1 Jun 90 page 1 of 1

Bill of Material 2M Hardware KIT P/N HK-2M

Fastenal SKU 93202 ¼”-20 x 5/8” ASTM A574 Hex Drive Zinc Finish 4 EA Alloy Steel Socket Cap Screw

Fastenal SKU 37620 ¼”-20 Grade A Zinc Finish Steel Regular Square Nut 4 EA

Fastenal SKU 33618 ¼” Zinc Finish Medium Split Lock Washer 4 EA

Fastenal SKU 0303195 ½”-13 Thread 5/8” Slot 1-1/4”L x 5/8”H Quarter Turn 6 EA T-Slot Nut

Fastenal SKU 23403 ½”-13 x ¾” ASTM A574 Hex Drive Black Oxide Finish 6 EA Alloy Steel Socket Cap Screw

Fastenal SKU 33625 ½” Plain Finish Medium Lock Washer 6 EA

DISTRIBUTION STATEMENT A. APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED.

nathan.heikkinen Typewritten Text Enclosure 1

File details come from the government source that posted it. Updated .