ATTACHMENT 7 OBIS COI.pdf

PDF 3 MB Posted

Attached to
O&M OF 5 TAGOS & 2 TAGM VESSELS Federal contract opportunity
Solicitation number
N00033-TAGOS-10-01MS
Issued by
Department of the Navy Military Sealift Command

About this file

USNS OBSERVATION ISLAND COI

View the file

Other files for this federal contract opportunity

Other files attached to O&M OF 5 TAGOS & 2 TAGM VESSELS, newest first.
File Type Posted
ATTACHMENT 10_Tech Manual.doc DOC document
ATTACHMENT 9 TAGOS SOW.doc DOC document
ATTACHMENT 4 ABLE COI.pdf PDF
ATTACHMENT 5 IMPECCABLE COI.pdf PDF
ATTACHMENT 2 LOYAL COI.pdf PDF
Market Survey TAGOS-TAGM 7 ships.doc DOC document
ATTACHMENT 1 VICTORIOUS COI.pdf PDF
ATTACHMENT 6 INVINCIBLE COI.docx DOCX document
ATTACHMENT 3 EFFECTIVE COI.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States of America Department of Homeland Security

United States Coast Guard

Certification Date:

Expiration Date:

IMO Number:

20 May 2005 20 May 2010 8835449

Official Number Call Sign

267046 NRPP

Hull Malerial Horsepower

Steel 19250

Delivery Dale Date Keel Laid Gross Tons Nel Tons

01Dec19S4 R-14029 R-6322 I- I-

Operator

Hailing Port

Not Documented Propulsion

Steam Turbine

DWT

14929

Length

R-529.6 1-

DEPARTMENT OF THE NAVY

MILITARY SEALIFT COMMAND

WASHINGTON NAVY YD, BLDG 210

WASHINGTON, DC 20398-5100

UNITED STATES

This vessel must be manned with the following licensed and unlicensed personnel. Included in which there must be

8 certified Iifeboatmen 0 certified tankermen 0 HSC t e ratin and 4 GMDSS 0 erators.

1 Master 0 Master & 1st Class pilot 0 Radio Officer(s) 1 Chief Engineer

1 Chief Mate 0 Mate & 1st Class Pilot 6 Able Seamen/ROANW 1 1st Asst. Engr/2nd Engr.

1 2nd Mate/OICNW 0 Lic. Mate/OICNW 3 Ordinary Seamen 1 2nd Asst. Engr/3rd Engr.

1 3rd Mate/OICNW 0 1st Class Pilot 0 Deckhands 1 3rd Asst. Engr.

o Lic. Engr.

MAERSK LINE LIMITED

ONE COMMERCIAL PLACE - 20TH FLOOR

NORFOLK, VA 23510-2103

UNITED STATES

3 QMED/Rating

3 Oilers

In addition, this vessel may carry 0 passengers, 57 other persons in crew, 0 persons in addition to crew, and 94 Technicans.

Total ersons allowed: 174 Route Permitted and Conditions of Operation:

NAVAL VESSEL, IN SERVICE, CIVILIAN MANNED. THIS VESSEL HAS BEEN INSPECTED AND

CERTIFICATED IN ACCORDANCE WITH THE STANDARDS APPLICABLE TO MILITARY SEALIFT COMMAND

VESSELS.

CERTIFICATED WITH REDUCED LIFEBOAT CAPACITY IN ACCORDANCE WITH THE STANDARDS APPLICABLE TO MSC VESSELS AS STATED IN MARINE SAFETY MANUAL, VOLUME II, CHAPTER 12.E.4.d

APPROVED FOR MINIMALLY ATTENDED MACHINERY OPERATION. THIS APPROVAL AND THE MINIMUM MANNING LEVEL SPECIFIED ON THIS CERTIFICATE OF INSPECTION ARE CONTINGENT UPON THE PROPER OPERATION OF THE AUTOMATED CONTROL/AUTOMATED MONITORING/AUTOMATED MACHINERY MANAGEMENT SYSTEMS. ANY

With this Inspection for Certification having been completed at Singapore, SINGAPORE, the Officer in Charge, Marine Inspection, Far East Detachment Singapore certified the vessel, in all respects, is in conformity with the applicable vessel inspection laws and the rules and re ulations rescribed thereunder.

Annual/Periodic/Quarterly Reinspections This Amen Date Zone AtP/Q Signature

19Jun2007 MID Sing P Bryson, Dennis 29Jul2008 MID Sing A Dila, Eric A.

Far East Detachment Singapore Inspection Zone

USNS OBSERVATION

ISLAND

Department of Homeland Security United States Coast Guard

Certificate of Inspection Page 2 of4

Certification Date:

20May2005

THREE (3) OF EITHER JR. ENGINEERS, ENGINEMEN, OR DECK ENGINEER MECHANICS MAY BE

SUBSTITUTED IN LIEU OF THREE OF THE REQUIRED UNLICENSED ENGINE DEPARTMENT PERSONNEL.

---Hull Exams--- Exam Type Drydock Internal structure

Next Exam 20May2010 20May2010

Last Exam 19Jun2007 19Jun2007

---Inspection Status--- *Fuel Tanks*

Internal Tank 10 Previous 5-172-2 5-143-1 25May2003 6-82-0, 1 & 2 25May2003 6-57-0, 1 & 2 - 6-36-1 & 2 6-14-0 6-106-0 & 1 6-160-1

Examinations Last - 2lApr2005 21Apr2005 21Apr2005 21Apr2005 21Apr2005 21Apr2005 21Apr2005 21Apr2005

*Boilers/Steam Piping* Maximum Steam Pressure Allowed/700

Boiler/Piping 10

AUX. BOILER

PORT

STBO

MAIN STEAM

Boiler/Piping 10

AUX. BOILER

PORT

STBD

MAIN STEAM

*Pressure Vessels* Type Air Receiver Air Receiver Air Receiver Air Receiver Air Receiver Air Receiver Air Receiver Air Receiver

Hydro/Last 31Jan2006 03May2005 03May2005 03May2005

Prior Exam 20May2005 20May2005

Next 21Apr2010 21Apr2010 21Apr2010 21Apr2010 21Apr2010 21Apr2010 2lApr2010 21Apr2010

Hydro/Next 31Jan2009 03May2010 03May2010 03May2010

Last 28Ju12008 28Ju12008 28Ju12008 28Ju12008 28Ju12008 28Ju12008 28Ju12008 28Ju12008

Mounts Opened 31Jan2004 03May2005 03May2005

Next 28Ju12013 28Ju12013 28Ju12013 28Ju12013 28Ju12013 28Ju12013 28Ju12013 28Ju12013

Mounts Removed 31Jan1999 03May2005 03May2005

Waterside Last Next Previous Last Next 31Jan2006 31Jan2009 31Jan2006 31Jan2009 05Jun2007 05Jun2010 25May2003 03May2005 03May2008 05Jun2007 05Jun2010 25May2003 03May2005 03May2008

25May2003 25May2003 25May2003

Fireside Previous

03May2005 03May2005

Location

ENGINE ROOM

FWD ENG ROOM

APC ROOM

APC ROOM

ENGINE ROOM

ENGINE ROOM

AUX DIESEL GEN RM

ENGINE ROOM

Previous 25May2003 25May2003 25May2003 25May2003 25May2003 25May2003 25May2003 25May2003 us S OBSERVATION

ISLA D

Department of Homeland Security United States Coast Guard

Certificate of Inspection Page 3 of4

Certification Date:

20May2005

DC Heater Air Receiver

*Tailshafts* Tailshaft ID

TAILSHAFT

*Lifesaving* Number of Davits/4 Lifeboat/Raft ID

ENGINE ROOM

AUX DIESEL GEN RM

Date Drawn 28Jul2008

25May2003 25May2003

28Jul2008 28Jul2008

Next Due Date 28Jul2013

Full Wgt Test Light Wgt Test 06May2005 06May2005 06May2005 06May2005 o o o

Falls Rnwd 06May2005 06May2005 06May2005 06May2005

---Lifesaving Equipment--- Number Persons

Total Equipment for Lifeboats (Total) Lifeboats(Port)* Lifeboats (Starbd) * Motor Lifeboats* Lifeboats W/Radio*

Rescue Boats/Platforms Inflatable Rafts Life Floats/Buoyant App

---Fire Fighting Equipment--- Number of Fireman Outfits/ 2

*Hose information* Qty Diameter 54 1.5

*Fixed Extinguishing Capacity

*Fire Qty

Length

Systems* Agent Carbon Dioxide Carbon Dioxide Carbon Dioxide Carbon Dioxide Carbon Dioxide Carbon Dioxide Carbon Dioxide Other Carbon Dioxide Carbon Dioxide

Life Preservers (Adult) Life Preservers (Child) Ring Buoys (Total) With Lights* With Line Attached* Other*

Immersion Suits Portable Lifeboat Radios Equipped with EPIRB?

(* included in totals)

28Ju12013 28Ju12013

Required o Yes

Space Protected

BOW THRUSTER & AUX. ROOM 1

ENGINE ROOM 1

FLAMMABLE LIQUID STORAGE AFT

FORWARD FLAMMABLE STORES

FORWARD PAINT LOCKER

04 DECK TRANSMITTER X BAND

PAINT MIXING & ISSUE AFT

GALLEY

500 KV'JGENERATOR

TURRET LEVEL (01-160-1) 1

Extinguishers - Hand portable and semi-portab1e* Class Type

A-II

B-II

DepaJ1ment of Homeland Security

United States Coast Guard

USNS OBSERVATION

ISLAND

Certificate of Inspection Page 4 of4

Certification Date:

20May2005

B-V

C-II

*Current Amendment* Port Amending/ Marine Inspection Detachment Singapore Date Amended/ 31Ju12008 -Remarks- COMPLETED ANNUAL EXAMINATION. UPDATED INSPECTION AND OPERATION CONDITIONS DETAILS.

United States Coast Guard work-list

USNS OBSERVATION ISLAND

31 JULY 2008

1. Renew fire extinguisher bracket on C02 portable fire extinguishers were needed.

2. Secure all fire screen door closure devices to make them not readily detachable.

3. Properly close fuse boxes where they are open throughout the vessel.

4. Close all holes in A-Class bulkheads. Pay particular attention to Galley, Laundry, Stair tower, and machinery spaces.

Blk 42 just below deck in the stair tower.

Vestibule 1-83-4 Many others

5. Double valve close or proper cap steam lines where heat elements are removed in the accommodation spaces.

6. Make proper repairs to secure exhaust insulation in the APU Room.

7. Install ventilation screens in the ducts in the APU Room.

8. Properly mark C02 sirens in APU Room.

9. Identify and properly label umnarked shutdown in the E/R emergency shutdown panel. .'

10. Repair hole in fire screen door 2-116-3.

11.Install eye guard on wire wheel in the engineer's workshop.

12. Properly display maneuvering information in the pilot house.

13. Make permanent repairs to the port side light.

14. Mark life boats with vessel call sign or name to be visible from the air.

15. Make pennanent repairs to wasted kick pipes on the bridge wing and 01 level penetrations.

16. Properly stow life jackets in the hospital ward.

17. Properly mark item 16 locations.

18. Hydrostatically test small oxygen bottle in the hospital.

19. Renew life buoy line with line that is dark in color.

20. Mark GMDSS station with vessel call sign.

21. Properly mark pfd location in pilot house with the number of jackets required to be stowed at that location. Ensure similar marking are on other locations.

United States Coast Guard work-list

USNS OBSERVATION ISLAND

31 mLY2008

1. Renew fire extinguisher bracket on C02 portable fire extinguishers were needed.

2. Secure all fire screen door closure devices to make them not readily detachable.

3. Properly close fuse boxes where they are open throughout the vessel.

4. Close all holes in A-Class bulkheads. Pay particular attention to Galley, Laundry, Stair tower, and machinery spaces.

Blk 42 just below deck in the stair tower.

Vestibule 1-83-4 Many others

5. Double valve close or proper cap steam lines where heat elements are removed in the accommodation spaces.

6. Make proper repairs to secure exhaust insulation in the APU Room.

7. Install ventilation screens in the ducts in the APU Room.

8. Properly mark C02 sirens in APU Room.

9. Identify and properly label unmarked shutdown in the E/R emergency shutdown panel. .,

10. Repair hole in fire screen door 2-116-3.

11.Install eye guard on wire wheel in the engineer's workshop.

12. Properly display maneuvering information in the pilot house.

13. Make permanent repairs to the port side light.

14. Mark life boats with vessel call sign or name to be visible from the air.

15. Make pennanent repairs to wasted kick pipes on the bridge wing and 01 level penetrations.

16. Properly stow life jackets in the hospital ward.

17. Properly mark item 16 locations.

18. Hydrostatically test small oxygen bottle in the hospital.

19. Renew life buoy line with line that is dark in color.

20. Mark GMDSS station with vessel call sign.

21. Properly mark pfd location in pilot house with the number of jackets required to be stowed at that location. Ensure similar marking are on other locations.

File details come from the government source that posted it. Updated .