Attachment_5_Phase_II_Evaluation_Factors.pdf
PDF 13 KB Posted
- Attached to
- MK 5 Velocimeter
- Solicitation number
- N00024-16-R-5369
About this file
Attachment 5
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5 – Phase II Evaluation Criteria
In determining which awardee’s Phase II CLIN to exercise, if the Government decides to exercise any Phase II CLINs, the Government will evaluate the contractor in accordance with the following factors for Phase II:
- Factor 1 – First Article Unit Acceptance Testing Results
- Factor 2 – Total Price
The FAU acceptance test results will be evaluated to determine the contractor’s ability to satisfy the requirements of this contract, including but not limited to: system accuracy, system reliability, system design, and system interface/integration.
BASIS FOR PHASE II AWARD
For Phase II, the Government expects the best value to result from selection of the technically acceptable First Article Units produced during Phase I at the lowest evaluated price and will thus use the Lowest Price Technically Acceptable (LPTA) source selection procedures
Factor 1 – First Article Unit Acceptance Testing Results
Factor 1 will be characterized as acceptable or unacceptable as follows:
Factor 2 – Total Price
The Total Price used to make the Phase II down-select will be the CLIN 0101 price included in Section B at Phase I award.
Evaluation Determination Description Acceptable Test results of First Article Units meet all requirements of the contract.
Unacceptable Test results of the First Article Units do not meet all requirements of the contract.
File details come from the government source that posted it. Updated .