L-3_Vol_3_Price_Summary.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- DRAFT DSP Inverter Presolicitation
- Solicitation number
- N00019-19-R-0030
About this file
This draft solicitation and related documents provide details for a potential Digital Signal Processor Inverter procurement for the UH-1Y aircraft. The Naval Air Systems Command intends to award a firm fixed price contract including non-recurring engineering, delivery of flight test and verification assets, and production options. Production options estimated include 200 retrofit units in FY2021, 120 retrofit units in FY2022, 60-100 spares units in FY2022, and 15-25 potential foreign military sales units. Completion of non-recurring engineering is desired within 12 months of award, with flight test assets due 8 months and verification assets 10 months after award. Production unit deliveries are desired starting 16 months after award at a rate of 25 per month. The draft solicitation requests comments by June 28, 2019 and anticipates award in the second quarter of FY2020.
L-3 Pricing Summary
View the file
Other files
| File | Type | Posted |
|---|---|---|
| L-2_Vol_2_T-1_SB_Goals.xlsx | XLSX spreadsheet | |
| Draft_N0001919R0030.docx | DOCX document | |
| L-1_Vol_1_ES_Tables.xlsx | XLSX spreadsheet | |
| L-4_Vol_3_GFE_Summary.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| Section L Cost - Attachment L-3 | |||||||||||||||
| Price Summary Table | |||||||||||||||
| DIRECT LABOR | MATERIAL | ODC | SUBCONTRACT | ||||||||||||
| CLIN | HRS | COST | O/H | SUBTL | COST | O/H | SUBTL | SUBTL | SUBTL | SUBTL | G&A | TOTAL | FCCM | FEE | Est. PRICE |
| CLIN 0001 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| CLIN 0002 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| CLIN 0003 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| CLIN 0004 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| CLIN 1001 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| CLIN 2001 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| CLIN 2002 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Qty 60-80 Unit Price | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| Qty 81-100 Unit Price | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| CLIN 3001 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Qty 15-25 Unit Price | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Calcualted Fields, please do not change
Sheet1
| Section L Cost - Attachment L-3 | ||||||||||||||||
| Cost Summary Table | ||||||||||||||||
| DIRECT LABOR | MATERIAL | ODC | SUBCONTRACT | |||||||||||||
| WBS | Nomenclature | HRS | COST | O/H | SUBTL | COST | O/H | SUBTL | SUBTL | SUBTL | SUBTL | G&A | TOTAL | FCCM | FEE | Est. PRICE |
| 1.0 | UH-1Y DSP Inverter Redesign | 0 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0.00 | 0 | 0 | 0.00 |
| 1.1 | DSP Inverter | 0 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0.00 | 0 | 0 | 0.00 |
| 1.1.1 | Integration, Assembly, Test, and Checkout | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.1.2 | Hardware | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.1.3 | Firmware | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.3 | Systems Engineering | 0 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0.00 | 0 | 0 | 0.00 |
| 1.3.1 | Integrated Logistics Support (ILS) Systems Engineering | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.3.2 | Core Systems Engineering | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.4 | Program Management | 0 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0.00 | 0 | 0 | 0.00 |
| 1.4.1 | Integrated Logistics Support (ILS) Program Management | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.4.2 | Core Program Management | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.5 | System Test and Evaluation | 0 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0.00 | 0 | 0 | 0.00 |
| 1.5.1 | Development Test and Evaluation | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.5.2 | Operational Test and Evaluation | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.5.3 | Test and Evaluation Support | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.5.4 | Test Facilities | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.6 | Training | 0 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0.00 | 0 | 0 | 0.00 |
| 1.6.1 | Equipment | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.6.2 | Services | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.7 | Data | 0 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0.00 | 0 | 0 | 0.00 |
| 1.7.1 | Data Deliverables CDRL A001-A009, A00A-A00H, A00J-A00N,A00P-A00W | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.7.2 | Data Repository | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.7.3 | Data Rights 1...n (Specify) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.8 | Peculiar Support Equipment | 0 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0.00 | 0 | 0 | 0.00 |
| 1.8.1 | Test and Measurement Equipment | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.8.2 | Support and Handling Equipment | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.9 | Common Support Equipment | 0 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0.00 | 0 | 0 | 0.00 |
| 1.9.1 | Test and Measurement Equipment | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.9.2 | Support and Handling Equipment | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.10 | Operational/Site Activation by Site 1...n (Specify) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.11 | Contractor Logistics Support (CLS) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.12 | Industrial Facilities | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||
| 1.13 | Initial Spares and Repair Parts | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Calcualted Fields, please do not change
File details come from the government source that posted it. Updated .