L-3_Vol_3_Price_Summary.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
DRAFT DSP Inverter Presolicitation
Solicitation number
N00019-19-R-0030
Issued by

About this file

This draft solicitation and related documents provide details for a potential Digital Signal Processor Inverter procurement for the UH-1Y aircraft. The Naval Air Systems Command intends to award a firm fixed price contract including non-recurring engineering, delivery of flight test and verification assets, and production options. Production options estimated include 200 retrofit units in FY2021, 120 retrofit units in FY2022, 60-100 spares units in FY2022, and 15-25 potential foreign military sales units. Completion of non-recurring engineering is desired within 12 months of award, with flight test assets due 8 months and verification assets 10 months after award. Production unit deliveries are desired starting 16 months after award at a rate of 25 per month. The draft solicitation requests comments by June 28, 2019 and anticipates award in the second quarter of FY2020.

L-3 Pricing Summary

View the file

Other files

File Type Posted
L-2_Vol_2_T-1_SB_Goals.xlsx XLSX spreadsheet
Draft_N0001919R0030.docx DOCX document
L-1_Vol_1_ES_Tables.xlsx XLSX spreadsheet
L-4_Vol_3_GFE_Summary.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

Section L Cost - Attachment L-3
Price Summary Table
DIRECT LABORMATERIALODCSUBCONTRACT
CLINHRSCOSTO/HSUBTLCOSTO/HSUBTLSUBTLSUBTLSUBTLG&ATOTALFCCMFEEEst. PRICE
CLIN 00010.000.000.000.000.00
CLIN 00020.000.000.000.000.00
CLIN 00030.000.000.000.000.00
CLIN 00040.000.000.000.000.00
CLIN 10010.000.000.000.000.00
CLIN 20010.000.000.000.000.00
CLIN 20020.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Qty 60-80 Unit Price0.000.000.000.000.00
Qty 81-100 Unit Price0.000.000.000.000.00
CLIN 30010.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Qty 15-25 Unit Price0.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Calcualted Fields, please do not change

Sheet1

Section L Cost - Attachment L-3
Cost Summary Table
DIRECT LABORMATERIALODCSUBCONTRACT
WBSNomenclatureHRSCOSTO/HSUBTLCOSTO/HSUBTLSUBTLSUBTLSUBTLG&ATOTALFCCMFEEEst. PRICE
1.0UH-1Y DSP Inverter Redesign0000.00000.00000.0000.00000.00
1.1DSP Inverter0000.00000.00000.0000.00000.00
1.1.1Integration, Assembly, Test, and Checkout0.000.000.000.000.00
1.1.2Hardware0.000.000.000.000.00
1.1.3Firmware0.000.000.000.000.00
1.2Platform Integration, Assembly, Test, and Checkout0.000.000.000.000.00
1.3Systems Engineering0000.00000.00000.0000.00000.00
1.3.1Integrated Logistics Support (ILS) Systems Engineering0.000.000.000.000.00
1.3.2Core Systems Engineering0.000.000.000.000.00
1.4Program Management0000.00000.00000.0000.00000.00
1.4.1Integrated Logistics Support (ILS) Program Management0.000.000.000.000.00
1.4.2Core Program Management0.000.000.000.000.00
1.5System Test and Evaluation0000.00000.00000.0000.00000.00
1.5.1Development Test and Evaluation0.000.000.000.000.00
1.5.2Operational Test and Evaluation0.000.000.000.000.00
1.5.3Test and Evaluation Support0.000.000.000.000.00
1.5.4Test Facilities0.000.000.000.000.00
1.6Training0000.00000.00000.0000.00000.00
1.6.1Equipment0.000.000.000.000.00
1.6.2Services0.000.000.000.000.00
1.7Data0000.00000.00000.0000.00000.00
1.7.1Data Deliverables CDRL A001-A009, A00A-A00H, A00J-A00N,A00P-A00W0.000.000.000.000.00
1.7.2Data Repository0.000.000.000.000.00
1.7.3Data Rights 1...n (Specify)0.000.000.000.000.00
1.8Peculiar Support Equipment0000.00000.00000.0000.00000.00
1.8.1Test and Measurement Equipment0.000.000.000.000.00
1.8.2Support and Handling Equipment0.000.000.000.000.00
1.9Common Support Equipment0000.00000.00000.0000.00000.00
1.9.1Test and Measurement Equipment0.000.000.000.000.00
1.9.2Support and Handling Equipment0.000.000.000.000.00
1.10Operational/Site Activation by Site 1...n (Specify)0.000.000.000.000.00
1.11Contractor Logistics Support (CLS)0.000.000.000.000.00
1.12Industrial Facilities0.000.000.000.000.00
1.13Initial Spares and Repair Parts0.000.000.000.000.00

Calcualted Fields, please do not change

File details come from the government source that posted it. Updated .