N00014-17-S-B010_Amendment_0003_Attachment_2_(Industry_Day_Contracts_Slides).pdf
PDF 580 KB Posted
- Solicitation number
- N00014-17-S-B010
About this file
Amendment 0003, Attachment 2 - Industry Day Contracts Slides 31 MAR 2017
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION STATEMENT A. Approved for public release 1
Late-stage Software Customization and Complexity Reduction S&T for Legacy Naval Systems
Solicitation # - N00014-17-S-B010
Industry Day Briefing - ONR Contracts
Agenda
• Provide a high level background of the ONR contract process
• Provide examples of contract “showstoppers”
• Provide tips for preparing proposals
• Review the proposal due date
DISTRIBUTION STATEMENT A. Approved for public release 2
Science and Technology (S&T) Opportunities/Solicitations
• ONR solicits proposals for most of our S&T research using Broad Agency Announcements (BAAs):
– Long Range BAA
• Current LR BAA #: N00014-17-S-B001
– Special Notices
– Program-Specific BAAs
• This solicitation is an example of a specific BAA
• All ONR solicitations can be found on the ONR website, as well as FBO.gov and Grants.gov (when applicable).
DISTRIBUTION STATEMENT A. Approved for public release 3
• BAAs are for the acquisition of Basic and Applied Research and that part of development not related to the development of specific system or hardware.
As such, they normally utilize Budget Activities 1-3.
– Basic Research (BA1)…directed toward greater knowledge or understanding of fundamental aspects of phenomena and of observable facts…
– Applied Research (BA2)…to understand the means to meet a recognized and specific need…
– Advanced Technology Development (BA3)…to integrate subsystems & components into system prototypes for field experiments and/or tests in simulated environment.
DISTRIBUTION STATEMENT A. Approved for public release 4
• BAA processes differ markedly from traditional solicitation process for services and supplies
– Evaluation factors focus on technical, importance to agency programs and fund availability
» Refer to pages 25-26 of the BAA for the specific evaluation criteria and their relative importance.
– Source selection through Peer or Scientific Review
– Proposals need not be evaluated against each other
– Contracts are awarded either as:
» Fixed price
» Cost-reimbursement, completion-type
– Debriefs are informal, managed by Program Officer
DISTRIBUTION STATEMENT A. Approved for public release 5
• BAA Awards take the form of Grants and Contracts
– Grant: Principal purpose to transfer a thing of value to the recipient to carry out a public purpose of support of stimulation. Not appropriate to acquire property or services for DoD’s direct benefit or use.
– Contract: Principle purpose to acquire property or services for the direct benefit or use of the Federal Government.
DISTRIBUTION STATEMENT A. Approved for public release 6
• Grants are used for BA1 and (early) BA2 efforts
• Grants are not appropriate if:
– Prototype or deliverable other than reports is required
– Fee is proposed
– Effort is clearly for Navy-only
– DD254 is required (classified work)
– Effort involved Export Control issues
DISTRIBUTION STATEMENT A. Approved for public release 7
• Proposals received by Program Office and evaluated in accordance with BAA criteria
• Program Office reviews proposals for conformance with BAA
• Offers selected for award
• Package prepared for submission to Contracts
• Package assigned to Contract Specialist
• Package reviewed to ensure proposal is adequate for contract action
• Proposals with “Showstoppers” are held up until corrected
BAA Process
DISTRIBUTION STATEMENT A. Approved for public release
BAA Process - Showstoppers
• Proposal is missing required documentation:
– Proposal Checklist
– Technical Proposal Template
– Statement of Work Template
– Cost Proposal Spreadsheet (in the ONR template)
– Preaward Survey of Prospective Contractor Accounting System Checklist (if applicable)
– ONR-contract specific representations and certifications
DISTRIBUTION STATEMENT A. Approved for public release 9
BAA Process - Showstoppers
• Submission is incomplete or inadequate
– Missing subcontractor cost proposal and associated prime contractor’s cost/price analysis
– Missing copy of Consultant agreement or supporting documentation
– Missing supporting documentation for material and other direct costs
– Vague or incomplete Data Rights Assertions
DISTRIBUTION STATEMENT A. Approved for public release 10
• Follow the BAA solicitation proposal instructions
• Do not send zip files or passwords for documents
• Provide requested supporting documentation with your proposal
• Submit a Subcontracting Plan as required (over $700K and other than a small business) with positive goals
• Avoid proposing equipment or facilities unless special circumstances apply
Proposal Tips
• Prepare your statement of work in accordance with the SOW template
• Address work for each period (base, option) in separate sections
• Describe the research and tasks to be pursued/completed under the contract
• Ensure deliverables in SOW are consistent with CDRLs (if submitted) and information in Proposal Checklist
• There should be no proprietary markings on the statement of work
• Submit Proposal on Time: (Page 23 of BAA):
Any proposal…received at the designated Government office after the exact time specified for receipt of proposals is “late” and will not be considered unless it is received before award is made, the contracting officer determines that accepting the late proposal would not unduly delay the acquisition and
If it was transmitted through an electronic commerce method authorized by the announcement, it was received at the initial point of entry to the
Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
There is acceptable evidence to establish that it was received at the
Government installation designated for receipt of proposals and was under the Government’s control prior to the time set for receipt of proposals; …
• Full Proposals are due by Monday, May 1st, 2017 at 15:00 (Local Time, Washington, D.C.)
• This includes both the 5 required hard copies and the soft copy of the proposal.
• Review Section IV (pages 12-25) of the BAA for all application and submission information
Proposal Due Date
• For any business-related questions, please e-mail:
• Matthew Murray, Contract Specialist (Code 252)
• Matthew.Murray1@navy.mil
• My PoC information is also located on pages 6-7 of the BAA, along with the Security and Technical PoCs
Contact Information mailto:Matthew.Murray1@navy.mil
File details come from the government source that posted it. Updated .