N_PD_8720_001C__main.pdf

PDF 277 KB Posted

Attached to
Near Space Network (NSN) Services, elibrary Federal contract opportunity
Solicitation number
80GSFC22R0029-elibrary
Issued by
National Aeronautics and Space Administration Goddard Space Center

View the file

Other files for this federal contract opportunity

Other files attached to Near Space Network (NSN) Services, elibrary, newest first.
File Type Posted
Lunar Relay SRD 12-05-2022 (Rev B with DCN001).pdf PDF
Exhibit B - NSN Services Pricing Model (Ref Only).pdf PDF
NIST.SP.800-171r2.pdf PDF
N_PR_1600_002A_.pdf PDF
N_PD_8720_001C__main.pdf PDF
Lunar Relay SRD 12-05-2022 (Rev B).pdf PDF
2021-03-11_nasa-hdbk-1005_baseline.pdf PDF
LunaNet Interoperability Specification (LNIS V4).pdf PDF
Mission_Data_Workbook_Final_20230221.pdf PDF
N_PD_2190_001B__main.pdf PDF
NIST.SP.800-53r5.pdf PDF
N_PR_2570_001C_.pdf PDF
N_PR_7123_001C_.pdf PDF
STO1 DTE Ops Services.pdf PDF
N_PR_2810_001.pdf PDF
NPR_8715_003D.pdf PDF
N_PR_8705_006D_.pdf PDF
STO2 Space Relay Ops Services.pdf PDF
Use Cases.pdf PDF
N_PR_2810_0007_.pdf PDF
N_PD_2810_001F__main.pdf PDF
Mission Data Workbook (MDWB) 1-27-23.pdf PDF
LunaNet Interoperability Specification (LNIS V4).pdf PDF
Lunar Relay Services Requirements Document (SRD) 12-05-2022 (Rev B).pdf PDF
Lunar Relay Services Requirements Document (SRD) 11-4-2022 (Rev A).pdf PDF
LCRNS SRD 10-18-2022.pdf PDF
LunaNet Interoperability Specification Document Version 4 (ESC-LCRNS-SPEC-0015).pdf PDF
NSNS Use Cases 8-3-22.pdf PDF
MDWB_20220614 (002).pdf PDF
N_PR_2570_001C_.pdf PDF
N_PR_8715_003D_.pdf PDF
STO 1 DTE Ops Services.pdf PDF
N_PR_2810_001F_.pdf PDF
N_PD_2190_001B__main.pdf PDF
N_PD_2810_001F__main.pdf PDF
NIST.SP.800-53r5.pdf PDF
2021-03-11_nasa-hdbk-1005_baseline.pdf PDF
MDWB_20220614 (002).pdf PDF
STO 2 Relay Ops Services.pdf PDF
NIST.SP.800-171r2.pdf PDF
N_PR_7123_001C_.pdf PDF
N_PR_1600_002A_.pdf PDF
LCRNS SRD.pdf PDF
Draft LunaNet Interoperability Specification.pdf PDF
N_PR_8705_006D_.pdf PDF
N_PR_2810_0007_.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

a. This NPD is applicable to NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers. This NPD applies to the Jet Propulsion Laboratory, a Federally Funded Research and Development Center, other contractors, recipients of grants, cooperative agreements, and other agreements only to the extent specified or referenced in the contracts, grants, and agreements.

b. This NPD does not apply to facility projects. For implementation of R&M on facilities see NPD 8831.1, NPR 8820.2, and NPR 8831.2.

c. In this directive, all mandatory actions (i.e., requirements) are denoted by statements containing the term "shall."

The terms: "may" or "can" denote discretionary privilege or permission, "should" denotes a good practice and is recommended, but not required, "will" denotes expected outcome, and "are/is" denotes descriptive material.

d. In this directive, all document citations are assumed to be the latest version unless otherwise noted.

3. AUTHORITY

NPD 8700.1, NASA Policy for Safety and Mission Success.

4. APPLICABLE DOCUMENTS

a. NPD 8831.1, Maintenance and Operations of Institutional and Program Facilities and Related Equipment.

b. NPR 8820.2, Facility Project Requirements (FPR).

c. NPR 8831.2, Facilities Maintenance and Operations Management.

d. NASA-STD-8729.1, NASA Reliability and Maintainability (R&M)Standard For Spaceflight and Support Systems

5. RESPONSIBILITY

a. The Chief, Safety and Mission Assurance:

(1) Oversees the implementation of R&M activities to assure that they are properly implemented on all Agency programs and projects.

(2) Oversees, by use of audits or other measures, the performance of the R&M design and operational requirements in all major programs and project.

(3) Informs Mission Directorate Associate Administrators regarding the performance of the R&M design and operational requirements in all major programs and projects under their cognizance.

b. Mission Directorate Associate Administrators shall:

(1) Evaluate the effectiveness of R&M activities and the R&M performance measures of programs and projects under their cognizance.

(2) Ensure that R&M data and experience are shared across programs and projects.

c. Program managers shall:

(1) Ensure that program-level R&M design and operational performance requirements (qualitative and quantitative) are established.

In addition to reliability performance measures, R&M requirements should address availability measures where applicable.

(2) Ensure that project-level system R&M design and operational performance requirements (qualitative and quantitative) are allocated and coordinated such that they are consistent with program-level R&M requirements.

(3) Assess the compliance with program-level R&M requirements, including the identification of areas for improvement, in a timely and continuous manner.

(4) Identify and pursue opportunities for collaboration between projects.

(5) Ensure the allocation of funding for R&M activities (including staffing, tools, and training) required to achieve compliance with R&M policies by the program.

(6) Ensure that R&M data and experience are shared across projects.

NPD 8720.1C -- main This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc nasa.gov.

NPD 8720.1C -- main Verify Current version before use at:

http://nodis3.gsfc nasa.gov/ Page 2 of 4

d. Project managers shall:

(1) Integrate all R&M activities with systems engineering, risk management, and other processes, assessments, and analyses including, but not limited to, safety, security, quality assurance, logistics, probabilistic risk assessment, life-cycle cost, configuration management, and maintenance.

(2) Establish a maintenance framework and approach early in the system's development.

(3) Ensure that compatibility is sustained among system design, maintenance planning, and logistics support activities.

(4) Establish and maintain a repository of R&M data and analyses that provides a basis for the assessment of R&M performance measures throughout the system's life cycle.

(5) Coordinate with the Center Safety and Mission Assurance (SMA) functional manager to ensure that R&M data is available for use as heritage data.

(6) Ensure that system R&M design and operational performance requirements (qualitative and quantitative) are established.

Note: In addition to reliability performance measures, R&M requirements should address availability measures where applicable.

(7) Ensure that R&M activities (addressing hardware, software, firmware, human elements, and interactions between them) are planned and implemented. R&M activities include, but are not limited to, requirements specification, failure mode identification, design validation, data collection, quantitative and qualitative modeling and analysis, and testing and demonstration (and the management of these activities). Guidance on R&M program management is provided in NASA-STD-8729.1.

(8) Ensure that R&M activities of contractor organizations are subject to requirements that enable compliance by programs and projects with applicable R&M policies and requirements.

(9) Ensure the availability of credible R&M data and analyses to support the assessment of compliance with R&M requirements.

(10) Assess the compliance with the R&M requirements, including the identification of areas for improvement, in a timely and continuous manner.

(11) Allocate funding for R&M activities (including staffing, tools, and training) required to achieve compliance by projects with R&M policies.

e. The Center SMA functional manager (as defined in NPD 8700.1) shall ensure that R&M data is available for use as heritage data to support the formulation of R&M goals and requirements, quantitative and qualitative reliability analysis, and other R&M engineering activities as part of current, follow-on, or new programs and projects, both at the local Center, and other Centers.

6. DELEGATION OF AUTHORITY

None.

7. MEASUREMENTS/VERIFICATION

Compliance with the requirements contained in this NPD is continuously monitored by the Centers and by the SMA Technical Authority. Compliance may also be verified as part of selected life cycle reviews, and by assessments, reviews, and audits of the requirements and processes defined within this NPD.

8. CANCELLATION

NPD 8720.1B, NASA Reliability and Maintainability (R&M) Program Policy, dated April 29, 2004.

REVALIDATED APRIL 06, 2018, WITH CHANGE 2, ORIGINAL SIGNED BY:

NPD 8720.1C -- main This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc nasa.gov.

http://nodis3.gsfc nasa.gov/ Page 3 of 4

/s/ Michael D. Griffin Administrator

ATTACHMENT A: REFERENCES

A.1 NPD 1200.1, NASA Internal Control.

A.2 NPD 1210.2, NASA Surveys, Audits, and Reviews Policy.

A.3 NPR 8705.6, Safety and Mission Assurance, Audits, Reviews, and Assessments.

(URL for Graphic)

None.

DISTRIBUTION:

NODIS

This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS)

Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.

NPD 8720.1C -- main This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc nasa.gov.

http://nodis3.gsfc nasa.gov/ Page 4 of 4

File details come from the government source that posted it. Updated .