Mohawk Valley PC - HVAC & Refrigeration #C202964 Bid Quote Sheet.xlsx
XLSX spreadsheet 92 KB Posted
- Solicitation number
- 2136897
- Issued by
- Oneida County, New York
About this file
This is a bid quote sheet for Mohawk Valley PC related to HVAC and Refrigeration services under contract number C202964. The document appears to be an Excel-based quotation template designed to collect pricing information from bidders for heating, ventilation, air conditioning, and refrigeration work. The sheet establishes a structured format for vendors to submit their pricing proposals, likely for equipment, materials, labor, or a combination thereof related to HVAC and refrigeration services that Mohawk Valley PC requires.
The bid quote sheet serves as a standardized tool for competitive bidding, enabling Mohawk Valley PC to collect and compare multiple vendor quotations on a consistent basis. The document structure suggests it includes line items for various HVAC and refrigeration components or services, allowing bidders to provide itemized pricing. This format facilitates transparent price comparison across multiple responses and supports Mohawk Valley PC's procurement process for selecting qualified vendors to provide the requested HVAC and refrigeration services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C202964 - BP Final 7.726.pdf | ||
| C202964 - IFB Final 7.7.26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MVPC HVAC #C202964
| ATTACHMENT D - BID QUOTE SHEET: MOHAWK VALLEY PSYCHIATRIC CENTER #OMH01-C202964-3650433 |
| Provide Preventive Maintenance Service for the HVAC & Refrigeration Systems and Ancillary Equipment per Appendix D of the Contract. The FACILITY reserves the right to alter the scheduling of the services as necessary. There is no reimbursement for travel time and/or travel expenses including mileage and fuel costs. |
Subcontractors Costing: The prices/rates quoted include all direct and indirect costs of any subcontractors, including those used to meet any stated M/WBE/SDVOB participation goals.
| Directions: 1) Insert the Unit Cost in the Unit Cost ($) column for each preventive maintenance service task listed (unless blocked); 2) The Annual Cost for each Contract Year, which is equal to the Bid Unit x Service Frequency per Year x Unit Cost will be calculated automatically; 3) The Total Amount (Years 1 – 5) for each preventive maintenance service task listed, which is equal to the total sum of the Annual Costs for each Contract Year (1 through 5) will be calculated automatically; 4) The Subtotal Bid for Preventive Maintenance Tasks, which is equal to the sum of the Total Amount (Years 1 – 5) column will be calculated automatically. | |||||
| Failure to follow these directions exactly may result in your bid being disqualified. Please be advised that only actual services performed may be invoiced at the Unit Costs quoted as per Appendix C of the contract. The Unit Cost for each item must be completed for each item listed (unless blocked). Do not leave any areas blank or the bid may be disqualified. Bidders are bound by the Unit Costs provided and cannot be changed after the Bid Opening. | |||||
| Page 1: Preventive Maintenance Services for the HVAC & Refrigeration Systems and Ancillary Equipment | |||||
| Item / Building | Maintenance Task | Bid Unit | Service Freq. per Year | Year 1 | |
| Unit Cost ($) | Year 1 | ||||
| Annual Cost ($) | Year 2 | ||||
| Unit Cost ($) | Year 2 | ||||
| Annual Cost ($) | Year 3 | ||||
| Unit Cost ($) | Year 3 | ||||
| Annual Cost ($) | Year 4 | ||||
| Unit Cost ($) | Year 4 | ||||
| Annual Cost ($) | Year 5 | ||||
| Unit Cost ($) | Year 5 | ||||
| Annual Cost ($) | Total Amount |
(Years 1-5)
| Controls - Pneumatic Air Compressors & Ancillaries / Bldg. 36, 63 & 64 | Semi-Annual PM | 3 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Air Handling Units (AHU)/ Make-Up Air Hadling Units / Bldgs. 31, 36, 62, 63 & 64 | Quarterly PM | |||||||||||
| (No Pre-Filter Replacement) | 39 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Quarterly PM | ||||||||||||
| (Pre-Filter Replacement Only) | 5 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Quarterly PM | ||||||||||||
| (Single Final Filter Section Unit Replacement Only) | 34 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Annual PM | ||||||||||||
| (No Final Filter Replacement) | 39 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Annual PM | ||||||||||||
| (Final Filter Replacement Only) | 5 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Roof Top Units (RTU) | ||||||||||||
| (with Direct Expansion (DX) Cooling Coil) / Bldg. 44 | Quarterly PM | |||||||||||
| (No Pre-Filter or Mesh Filter Section Service) | 3 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Quarterly PM | ||||||||||||
| (Pre-Filter or Mesh Filter Section Service Only) | 3 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Semi-Annual PM | ||||||||||||
| (Spring Seasonal) | 3 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Semi-Annual PM | ||||||||||||
| (Fall Seasonal) | 3 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Annual PM | ||||||||||||
| (No Final Filter Replacement) | 3 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Annual PM | ||||||||||||
| (Final Filter Replacement Only) | 3 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Page 1: Subtotal Bid for Preventive Maintenance Tasks ($) | $0.00 | |||||||||||
| Page 2: Preventive Maintenance Services for the HVAC & Refrigeration Systems and Ancillary Equipment | ||||||||||||
| Please refer to the instructions above on Page 1 of the Bid Quote Sheet. The Unit Cost for each item must be completed for each item listed (unless blocked). Do not leave any areas blank or the bid may be disqualified. | ||||||||||||
| Item / Building | Maintenance Task | Bid Unit | Service Freq. per Year | Year 1 | ||||||||
| Unit Cost ($) | Year 1 | |||||||||||
| Annual Cost ($) | Year 2 | |||||||||||
| Unit Cost ($) | Year 2 | |||||||||||
| Annual Cost ($) | Year 3 | |||||||||||
| Unit Cost ($) | Year 3 | |||||||||||
| Annual Cost ($) | Year 4 | |||||||||||
| Unit Cost ($) | Year 4 | |||||||||||
| Annual Cost ($) | Year 5 | |||||||||||
| Unit Cost ($) | Year 5 | |||||||||||
| Annual Cost ($) | Total Amount |
(Years 1-5)
| Heat Pump System (Compressor Unit, Coils & Air Handling Unit) / Bldg. 64 | Quarterly PM | |||||||||||
| (No Pre-Filter or Mesh Filter Section Service) | 2 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Quarterly PM | ||||||||||||
| (Mesh Filter Section Service Only) | 2 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Quarterly PM | ||||||||||||
| (Single Final Filter Section Unit Replacement Only) | 2 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Semi-Annual PM | 2 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Annual PM | ||||||||||||
| (No Final Filter Replacement) | 2 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Air Cooled Condensing Unit (ACCU) - (AHU Associated) / Bldgs. 62 & 64 | Annual PM | 2 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Energy Recovery Ventilator (AHU Associated) / Bldgs. 62 & 63 | Quarterly PM | 3 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Semi-Annual PM | 3 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Natural Gas-Fired Duct Heater (AHU Associated) / Bldg. 31 | Annual PM | 4 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Split System Air Conditioning System / Bldgs. 12, 15, 17, 21, 36, 63, 64, 71 & 951 | Annual PM | 17 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Variable Air Volume Box / Bldg. 64 | One-Time PM Service | |||||||||||
| (Year 1) | 39 | 1 | $0.00 | $0.00 | ||||||||
| Reheat Coils / Bldg. 63 | One-Time PM Service | |||||||||||
| (Year 1) | 27 | 1 | $0.00 | $0.00 | ||||||||
| Reheat Coils / Bldg. 64 | One-Time PM Service | |||||||||||
| (Year 1) | 234 | 1 | $0.00 | $0.00 | ||||||||
| Page 2: Subtotal Bid for Preventive Maintenance Tasks ($) | $0.00 | |||||||||||
| Page 3: Preventive Maintenance Services for the HVAC & Refrigeration Systems and Ancillary Equipment | ||||||||||||
| Please refer to the instructions above on Page 1 of the Bid Quote Sheet. The Unit Cost for each item must be completed for each item listed (unless blocked). Do not leave any areas blank or the bid may be disqualified. | ||||||||||||
| Item / Building | Maintenance Task | Bid Unit | Service Freq. per Year | Year 1 | ||||||||
| Unit Cost ($) | Year 1 | |||||||||||
| Annual Cost ($) | Year 2 | |||||||||||
| Unit Cost ($) | Year 2 | |||||||||||
| Annual Cost ($) | Year 3 | |||||||||||
| Unit Cost ($) | Year 3 | |||||||||||
| Annual Cost ($) | Year 4 | |||||||||||
| Unit Cost ($) | Year 4 | |||||||||||
| Annual Cost ($) | Year 5 | |||||||||||
| Unit Cost ($) | Year 5 | |||||||||||
| Annual Cost ($) | Total Amount |
(Years 1-5)
| Cabinet Unit Heaters, Fan Coil Units, Unit Heaters, Unit Ventilators / Bldgs. 12, 15, 17, 36, 62, 63 & 64 | Semi-Annual PM | 105 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Annual PM | 105 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Unit Heater (Gas-Fired) (includes infrared radiant heaters) / Bldgs. 17, 59, 60 & 71 | Annual PM | 18 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Variable Frequency Drives / Bldgs. 36, 63 & 64 | Annual PM | 18 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Fans, Belt-Driven & Direct-Driven / 11, 17, 36, 63 & 64 | Semi-Annual PM | 60 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Heat Exchangers / Bldgs. 36 & 64 | Semi-Annual PM | 2 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Plate & Frame - One-Time PM (Year 1 Only) | 2 | 1 | $0.00 | $0.00 | |||||||
| Domestic Water Heaters – Gas-Fired / Bldgs. 17, 36, 44, 53, 54, 55, 62, 63, 64, 80 & 951 | Semi-Annual PM | 15 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Domestic Water Heaters (Electric) / Bldgs. 12, 15 & 36 | Semi-Annual PM | 3 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Pumps, Seasonal Operation / Bldgs. 11, 12, 17, 36, 62, 63 & 64 | Semi-Annual PM | 44 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Pumps, Continuous Operation / Bldg. Bldgs. 12, 36, 63 & 64 | Quarterly PM | 11 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Expansion Tanks / Bldgs. 11, 12, 17, 36, 62, 63 & 64 | Annual PM | 13 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Air Separators / Bldgs. 11, 12, 17, 36, 63 & 64 | Annual PM | 7 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Page 3: Subtotal Bid for Preventive Maintenance Tasks ($) | $0.00 | ||||||||||
| Page 4: Preventive Maintenance Services for the HVAC & Refrigeration Systems and Ancillary Equipment | |||||||||||
| Please refer to the instructions above on Page 1 of the Bid Quote Sheet. The Unit Cost for each item must be completed for each item listed (unless blocked). Do not leave any areas blank or the bid may be disqualified. | |||||||||||
| Item / Building | Maintenance Task | Bid Unit | Service Freq. per Year | Year 1 | |||||||
| Unit Cost ($) | Year 1 | ||||||||||
| Annual Cost ($) | Year 2 | ||||||||||
| Unit Cost ($) | Year 2 | ||||||||||
| Annual Cost ($) | Year 3 | ||||||||||
| Unit Cost ($) | Year 3 | ||||||||||
| Annual Cost ($) | Year 4 | ||||||||||
| Unit Cost ($) | Year 4 | ||||||||||
| Annual Cost ($) | Year 5 | ||||||||||
| Unit Cost ($) | Year 5 | ||||||||||
| Annual Cost ($) | Total Amount |
(Years 1-5)
| Forced Hot Air Furnace / Bldgs. 9, 15 & 71 | Annual PM | 4 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Forced Hot Air Furnace & Air Conditioning Unit / Bldg. 80 | Semi-Annual PM | 2 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Refrigeration Units and Freezer Units, Walk-In / Bldg. 64 | Semi-Annual PM | 5 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Air Handling Units (AHU)/ Make-Up Air Hadling Units / Bldg. 11 | Quarterly PM | ||||||||||||||
| (No Pre-Filter Replacement) | 4 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Quarterly PM | |||||||||||||||
| (Pre-Filter Replacement Only) | 4 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Quarterly PM | |||||||||||||||
| (Single Final Filter Section Unit Replacement Only - If Units do not have Pre & Final Filters) | 4 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Annual PM | |||||||||||||||
| (No Final Filter Replacement) | 4 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Annual PM | |||||||||||||||
| (Final Filter Replacement Only) | 4 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Air Cooled Condensing Unit (ACCU) - (AHU Associated) / Bldgs. 11 | Annual PM | 4 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Cabinet Unit Heaters / Bldg. 11 | Semi-Annual PM | 4 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Annual PM | 4 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Variable Frequency Drives / Bldg. 11 | Annual PM | 8 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Fans, Belt-Driven & Direct-Driven / Bldg. 11 | Semi-Annual PM | 2 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Domestic Water Heaters – Gas-Fired / Bldg. 11 | Semi-Annual PM | 1 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Page 4: Subtotal Bid for Preventive Maintenance Tasks ($) | $0.00 | ||||||||||||||
| Page 5: Time and Material Rates | |||||||||||||||
| With respect to labor and material for repairs not covered under the routine maintenance (including emergency service), provide labor rate quote. If on-site emergency service is requested by the FACILITY, a CONTRACTOR Service Technician shall arrive on-site within two (2) hours of the FACILITY's request for an on-site CONTRACTOR Technician. Prior FACILITY approval is required for all repairs. Material markup will be fixed at 10%. Shipping costs are not to be included in the material markup. There is no reimbursement for travel time and/or travel expenses including mileage and fuel costs. | |||||||||||||||
| Straight Time is defined as an eight (8) hour day Monday thru Friday. Overtime includes all other times except hours/days indicated as Straight Time, i.e.: NY State Holidays, weekends, etc. | |||||||||||||||
| Directions: 1) Insert the Hourly Labor Rate in the Unit Cost ($) column for Straight Time, Overtime, and Training. Do not enter any pricing for the Material Allowance; 2) The Annual Cost for the Contract Year, which is equal to the Estimated Service Frequency per Year x Unit Cost is calculated automatically; 3) The Total Amount (Years 1 – 5) for Straight Time, Overtime, and Training for each Contract Year (1 through 5) is calculated automatically; 4) The Time & Material Allowance Subtotal which is equal to the sum of the Total Amount (Years 1 – 5) column (Total Material Allowance + Total Straight Time + Total Overtime + Total Training) is calculated automatically. | |||||||||||||||
| The Unit Cost for each item must be completed for each item listed (unless blocked). Do not leave any areas blank or the bid may be disqualified. Please be advised that only actual services performed may be invoiced at the Unit Costs quoted as per Appendix C of the contract. Bidders are bound by the Unit Costs provided and cannot be changed after the Bid Opening. | |||||||||||||||
| Item | Bid Unit | Est. Service Freq. Per Year | Year 1 | ||||||||||||
| Unit Cost ($) | Year 1 Annual Cost ($) | Year 2 | |||||||||||||
| Unit Cost ($) | Year 2 Annual Cost ($) | Year 3 | |||||||||||||
| Unit Cost ($) | Year 3 Annual Cost ($) | Year 4 Unit Cost ($) | Year 4 Annual Cost ($) | Year 5 | |||||||||||
| Unit Cost ($) | Year 5 Annual Cost ($) | Total Amount (Years 1-5) | |||||||||||||
| Material Allowance | LOT | 1 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $100,000.00 | ||
| HVAC Technician Straight Time | HRS. | 200 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| HVAC Technician Overtime | HRS. | 80 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Training Rate | HRS. | 8 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Page 5: Time and Material Allowance Subtotal ($) | $100,000.00 | ||||||||||||||
| Note: The material allowance and the number of straight time, overtime and training hours are estimated and are only used for purposes of determining the lowest responsible bidder and an estimated contract total cost. Payment will only be made on the actual number of hours for repairs and the cost of materials used. | |||||||||||||||
| Page 6: Bid Totals | |||||||||||||||
| Directions: When finished, be sure to sign and date the bottom of the Bid Totals sheet. Only the signed original Bid Quote Sheet can be submitted with the proposal. | |||||||||||||||
| Preventive Maintenance Task Sub-Total (Page 1) | $0.00 | ||||||||||||||
| Preventive Maintenance Task Sub-Total (Page 2) | $0.00 | ||||||||||||||
| Preventive Maintenance Task Sub-Total (Page 3) | $0.00 | ||||||||||||||
| Preventive Maintenance Task Sub-Total (Page 4) | $0.00 | ||||||||||||||
| Time and Material Allowance Sub-Total (Page 5) | $100,000.00 | ||||||||||||||
| TOTAL BID | $100,000.00 |
| When applicable, | |
| -The bidder’s signature below attests that they have reviewed the prevailing wage rates that apply to this solicitation. | |
| -The bidder’s signature below attests to the receipt and understanding of the questions & answers associated with this solicitation. | |
| -The bidder’s signature below attests that they will inform the OMH in writing of the name(s) of any individual(s) who will provide any service under the resulting contract who has not been off the New York State payroll for at a minimum of two years from the start date of the resulting contract. The bidder must notify the OMH of such individual(s) prior to the start of the contract or prior to that individual(s) providing any service in accordance with resulting contract. | |
| -The bidder’s signature below attests they have reviewed and understand the requirements stated in the IFB (section 17) and the OMH contract boilerplate (Appendix C) regarding the necessity to accept Electronic Payments for all invoices if awarded this contract, and certifies that it has already applied to participate in the State Comptroller’s Electronic Payment system, or will do so within 10 days of receiving notification of contract selection. | |
| -If award is to an individual: | |
| □ | The signature below attests that I have not been on the New York State payroll during the last two years. |
| OR | |
| □ | The signature below attests that I have been on the New York State payroll during the last two years and the N.Y. State Ethics Commission Approval Letter is attached. |
Name of Firm_______________________________________________________ Date _________________________
Authorized Representative (Print):_____________________________________ Authorized Signature________________________________________
&"Arial,Regular"ATTACHMENT D - BID QUOTE SHEET
MOHAWK VALLEY PSYCHIATRIC CENTER #OMH01-C202964-3650433
File details come from the government source that posted it. Updated .