Minnechaug Boiler Addenda No. 1.pdf

PDF 85 KB Posted

Attached to
MRHS Boiler Replacement
Solicitation number
BD-27-1965-MT161-MT161-131284
Issued by
Hampden County, Massachusetts

About this file

This is an addendum to contract documents for a boiler replacement project at Minnechaug Regional High School in Wilbraham, Massachusetts, issued by Robt. W. Hall Consulting Engineers, Inc. on July 28, 2026. The addendum specifies critical operational constraints for the project execution: the school will remain in session and fully occupied during the contract period, with rigging operations over occupied spaces strictly prohibited. To accommodate these restrictions, three specific dates are designated as available for rigging activities during normal business hours: November 3, November 11, and November 25, 2026. This constraint significantly impacts project scheduling and logistics planning for bidders responding to the August 3, 2026 bid deadline.

The addendum addresses a key operational concern for a $125,000 estimated HVAC general contracting project involving the replacement of one boiler among five existing units at the school. Bidders must account for these limited rigging windows and occupancy restrictions when developing their project schedules and cost estimates. The constraint necessitates careful coordination with school administration and may require phased work sequences or alternative installation methodologies to maintain safety and minimize disruption to the educational environment during the school year.

View the file

Other files

File Type Posted
MRHS Boiler Replacement Invitation to Bid.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROBT. W. HALL CONSULTING ENGINEERS, INC

540 MEADOW STREET EXTENSION

AGAWAM, MASSACHUSETTS 01001-0002

(413) 789-0960 • (413) 798-3295

July 28, 2026

Boiler Replacement

Minnechaug Regional High School

Wilbraham, Ma 01095

Addenda No. 1

Item No. 1 School will be in session and the building occupied during the period of the contract. Rigging over occupied spaces will not be allowed. The dates of November

3, November 11 and November 25 are available for rigging during normal business hours.

End of Addenda No. 1

File details come from the government source that posted it. Updated .