This draft request for proposal (RFP) is for the Mission Enabling Services Contract (MESC) to provide specialized and highly specialized mission-enabling applications and services to the NASA Johnson Space Center (JSC) Flight Operations Directorate (FOD) and its affiliate organizations. The MESC requirements span flight support for NASA/JSC and external customers including other NASA centers, international partners, government organizations, and commercial partners.

The MESC includes two single-award baselines and a multiple-award indefinite delivery/indefinite quantity (IDIQ) component. Baseline A is for the NASA Aircraft Management Information System (NAMIS) and Baseline B is for Spaceflight Enabling Services. The IDIQ covers new work within the general scope of Baseline B where tasks are not identified in Baseline B. Proposals are due 30 calendar days after final RFP release on August 26, 2021. Award is anticipated on June 8, 2022 with a start date of October 1, 2022. The total contract value is to be determined. The document requests comments on all aspects of the draft RFP by August 2, 2021 and states the ombudsman point of contact.

View the file

Other files for this federal contract opportunity

Other files attached to Mission Enabling Services Contract (MESC) Draft RFP, newest first.
File Type Posted
MESC Draft Request for Proposal Q and A Round 2.pdf PDF
MESC Draft Request for Proposal Q and A.pdf PDF
Attachment L-08 Past Performance Relvancy Matrix.xlsx XLSX spreadsheet
Attachment L-03 Baseline EPM Template.xlsx XLSX spreadsheet
Attachment L-04 IDIQ EPM Template.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Aeronautics and Space Administration Lyndon B. Johnson Space Center 2101 NASA Parkway Houston, Texas 77058-3696

July 22, 2021

BR2-21-037

TO: All Potential Offerors

SUBJECT: Draft Request for Proposal (DRFP) 80JSC021R0009, for the Mission Enabling Services Contract (MESC)

You are invited to review and comment on the National Aeronautics and Space Administration (NASA) Johnson Space Center’s (JSC) Mission Enabling Services Contract (MESC) draft solicitation. The principal purpose of this requirement is to provide for development, sustaining, and maintenance for software, systems, and support for the Flight Operations Directorate (FOD).

This includes: highly-specialized operations systems technology, software, and support, specialized management and mission support services, as well as advanced research and development technology support.

Potential offerors are encouraged to comment on all aspects of the draft solicitation, including the requirements, schedules, proposal instructions, and evaluation approaches, any perceived safety, occupational health, security (including information technology security), environmental, export control, and/or other programmatic risk issues associated with performance of the work.

Potential offerors are also encouraged to comment on the scenario task order requirements and the Section L and M evaluation criteria. The Total Compensation Plan will be added in the Responsibility Consideration Factor of the final RFP. Throughout this draft solicitation, the term Offeror Fill In (OFI) designates areas that the Offeror should complete, and To Be Determined (TBD) designates areas that will be supplied by the Government.

The government anticipates awarding the following contract(s):

• Baseline A: Single Award, Cost-Plus-Fixed-Fee (CPFF) contract

• Baseline B: Single Award, Cost-Plus-Fixed-Fee (CPFF) contract

• IDIQ: Multi-Award with Firm-Fixed-Price (FFP) Task Orders (TOs)

The government anticipates the following periods of performance:

• Baseline A: NASA Aircraft Management Information System (NAMIS) (Full and Open)

– 2-year base period: October 1, 2022 – September 30, 2024

– Option 1: October 1, 2024 – September 30, 2026

– Option 2: October 1, 2026 – September 30, 2027

• Baseline B: Spaceflight Enabling Services (SES) (Small Business Set Aside)

– 2-year base period: October 1, 2022 – September 30, 2024

– Option 1: October 1, 2024 – September 30, 2026

– Option 2: October 1, 2026 – September 30, 2027

• Multiple-Award IDIQ Services (Small Business Set Aside)

– Ordering Period: October 1, 2022 – September 30, 2027

The North American Industry Classification System (NAICS) code for this acquisition is 541512, Computer Systems Design Services and the small business size standard is $30.0M.

Potential offerors should ensure their company is listed in the online database(s) for the following:

(1) System for award management: https://www.sam.gov/SAM/

(2) U.S. Department of Labor Veterans’ Employment and Training Service, VETS-4212

Reports: https://vets4212.dol.gov/vets4212/

(3) Date Universal Numbering System (and the transition to the US Government’s unique entity identifier (UEI)): https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment- iae/iae-information-kit/unique-entity-identifier-update

The successful offeror must pass an Equal Employment Opportunity (EEO) clearance before contract award (See FAR 22.805).

The current planned release date for the Final Request for Proposal (RFP) is on or about August 26, 2021, with proposals being due 30 calendar days later.

The anticipated contract award date is June 8, 2022, with an October 1, 2022 contract effective date. The contract will be performed onsite at NASA JSC. In addition, work may be performed at the contractor’s facility or at other locations as specified in the SOW or TO.

The following additional information is provided to assist in understanding this acquisition:

1. The government anticipates that a Phase-in period will be conducted for Baseline A and Baseline B.

• The phase-in is firm fixed priced

• 61-day phase-in period for the baseline contracts is: August 1, 2022 – September

30, 2022

• No phase-in is anticipated for IDIQ

2. The Government anticipates making available existing Installation-Accountable Government Property (IAGP) for onsite contract performance as described in the DRFP.

3. After release of the final RFP, the MESC Pre-proposal Conference is anticipated to be held on September 8, 2021. Notice will be posted on the acquisition website noted below.

4. NASA has determined that this acquisition may give rise to a potential organizational conflict of interest (OCI). Offerors should refer to NFS clause 1852.209-71 Limitation of Future Contracting, for a description of the potential conflict(s) and any restrictions on future contracting.

In order to control and protect sensitive data owned by the Government and its Contractors, NASA policy requires all acquisition-related documents be released in Adobe Portable Document Format (PDF).

Documents related to this acquisition, including this letter, the solicitation, attachments, exhibits, any amendments and links to online reference/technical/bidders library will be attainable electronically through the Government-wide Point of Entry (GPE). Potential offerors are requested to periodically monitor the website for updates.

NASA FAR Supplement (NFS) clause 1852.215-84, OMBUDSMAN, is applicable. The Ombudsman for this acquisition is Monica Foley, monica.lee.foley@nasa.gov, 281-244-0039.

This DRFP is not a solicitation and NASA is not requesting proposals. This DRFP does not commit NASA JSC to pay any proposal preparation costs, nor does it obligate NASA JSC to procure or contract for this requirement. This request is not an authorization to proceed, and does not authorize payment for any charges incurred by the offeror for performing any of the work called for in this solicitation.

Any comments regarding the DRFP should be submitted electronically in writing, to Catherine Staggs, Contracting Specialist, at mesc@mail.nasa.gov, within 10 calendar days after the release of this DRFP. If a respondent believes their comments contain confidential, proprietary, competition sensitive, or business information, those questions/comments shall be marked appropriately. However, questions that are marked as containing confidential, proprietary, competition sensitive or business information will not be provided a Government response. The Government will consider all comments received in preparation of the Final RFP. To the extent a comment leads the Government to revise the acquisition approach or requirements, the change will be reflected in the Final RFP. Some DRFP questions and comments may receive a posted response to the GPE if the Contracting Officer determines that a response would facilitate additional understanding of the solicitation. The Government may also respond via the GPE to comments and/or questions received following the issuance of the Final Request for Proposal

(RFP).

Rob Kolb Deputy Manager

Rob Kolb

Enclosure:

Draft RFP #80JSC021R0009

SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

RATING PAGE OF PAGES

4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. E-MAIL ADDRESS

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECS./WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)

DATEAMENDMENT NO.AMENDMENT NO. DATE

15A. NAME AND

ADDRESS

OF OFFEROR

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN

OFFER(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER SUCH

ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:

10 U.S.C. 2304 (c) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 6/2014)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB)

NEGOTIATED (RFP)

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

4200765523

JSC

2. CONTRACT NUMBER 3. SOLICITATION NUMBER

80JSC021R0009

Catherine E. Staggs mesc@mail.nasa.gov

A-1-6 B-1-10 C-1-37 D-1-2 E-1-2 F-1-4 G-1-11 H-1-7 M-1-14

L-1-77

J-1-209

I-1-27

281 792-7927

Scott A. Stephens

K-1-11

NASA/Johnson Space Center BR2/Scott A. Stephens 2101 NASA Parkway Houston, TX 77058

NASA Shared Services Center (NSSC) Financial Management Division(FMD) – Accounts Payable Bldg. 1111, C. Road Stennis Space Center, MS 39529

Refer to Section L.20.2.1 of this solicitation

1 426

Mission Enabling Services Contract (MESC) Section A: Table of Contents Solicitation# 80JSC021R0009

A-2

A.2 DETAILED TABLE OF CONTENTS

SECTION A. SOLICITATION/CONTRACT FORM, SF33 Page

A.1 Standard Form 33 A-1 A.2 Detailed Table of Contents A-2

SECTION B. SUPPLIES OR SERVICES AND PRICES/COSTS B-1

B.1 Listing Of Clauses Incorporated By Reference B-1 B.2 Services To Be Furnished B-1 B.3 Contract Type B-1 B.4 Phase-In And Contract Values B-2 B.5 NFS 1852.232-81 Contract Funding (Jun 1990) [Applicable Only To

Baselines A and B] B-2

B.6 JSC 52.216-90 IDIQ Minimum And Maximum Ordering Limits (Nov 2018) [Applicable Only To IDIQ]

B-3

B.7 FFP IDIQ Rates [Applicable Only To IDIQ] B-3

SECTION C. STATEMENT OF WORK C-1

C.1 Baseline A: NAMIS Services C-6 C.2 Baseline B: Spaceflight Enabling Services C-20

C.3 IDIQ C-33

SECTION D. PACKAGING AND MARKING D-1

D.1 Listing of Clauses Incorporated by Reference D-1 D.2 NFS 1852.245-74 Identification and Marking of Government Equipment (Jan 2011)

D-1

SECTION E. INSPECTION AND ACCEPTANCE E-1

E.1 Listing of Clauses Incorporated by Reference E-1 E.2 FAR 52.246-11 Higher-Level Contract Quality Requirement (Dec 2014)

E-1

SECTION F. DELIVERIES OR PERFORMANCE F-1

F.1 Listing of Clauses Incorporated by Reference F-1 F.2 Place of Performance F-1 F.3 Period of Performance [Applicable only to Baselines A and B]

F-1

A-3

F.4 Option To Extend Period Of Performance [Applicable Only to Baselines A and B] F-2

F.5 Shipping Instructions F-3 F.6 Contract Transition [Applicable only to Baselines A and B] F-3

SECTION G. CONTRACT ADMINISTRATION DATA G-1

G.1 Listing of Clauses Incorporated by Reference G-1 G.2 NFS 1852.232-80 Submission of Vouchers for Payment (April 2018) G-1 G.3 NFS 1852.245–71 Installation-Accountable Government Property (Jun 2018)

Alternate I (Jan 2011) [Applicable to Baseline A, Baseline B, and some IDIQ Task Orders as defined in the individual Task Order solicitation]

G-3

G.4 NFS 1852.245–73 Financial Reporting Of NASA Property In The Custody Of Contractors (Jan 2017)

G-5

G.5 NFS 1852.245-76 List Of Government Property Furnished Pursuant To FAR 52.245– 1 (Jan 2011)

G-7

G.6 NFS 1852.245-82 Occupancy Management Requirements (Sep 2017)) G-7 G.7 JSC 52.204-92 NASA Security Program and Identification of Employees.

(FEB 2021)

G-8

G.8 Technical Direction G-10

SECTION H. SPECIAL CONTRACT REQUIREMENTS H-1

H.1 Listing of Clauses Incorporated By Reference H-1 H.2 NFS 1852.209-71 Limitation Of Future Contracting (Dec 1988) H-1 H.3 NFS 1852.225-70 Export Licenses (Feb 2000) – Alternate 1 (Feb 2000) H-2 H.4 NFS 1852.232-77 Limitation Of Funds (Fixed-Price Contract) (Mar 1989) H-3 H.5 NFS 1852.235-71 Key Personnel And Facilities (Mar 1989) H-5 H.6 JSC 52.219-90 Small Business Subcontracting Goals

(Oct 2006) [Applies only to other than Small Business on Baseline A] H-5

H.7 JSC 52.223-94 Environmental and Energy Conservation Requirements and Hazardous Materials Use (Aug 2020)

H-6

H.8 Reserved

H-7

PART II -- CONTRACT CLAUSES

SECTION I. CONTRACT CLAUSES I-1

I.1 Listing of Clauses Incorporated by Reference I-1 I.2 FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Jun 2016)

I-6

I.3 FAR 52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment (Aug 2020)

I-8

A-4

I.4 FAR 52.215-13 Subcontractor Certified Cost or Pricing Data - Modifications (Jun 2020)

I-11

I.5 FAR 52.216-18 Ordering (Aug 2020) [Applicable Only To IDIQ] I-12 I.6 FAR 52.216-19 Order Limitations (Oct 1995) [Applicable Only to IDIQ] I-12 I.7 FAR 52.216-22 Indefinite Quantity (Oct 1995) [Applicable Only To IDIQ] I-13 I.8 FAR 52.217-9 Option To Extend The Term Of The Contract (Mar 2000)

[Applicable Only To Baselines A and B] I-14

I.9 FAR 52.219-14 Limitations on Subcontracting (Mar 2020) [Deviation 19- 02A]

I-14

I.10 FAR 52.222-19 Child Labor ---Cooperation with Authorities and Remedies (Apr 2021) [Deviations 20-02A]

I-15

I.11 FAR 52.222-35 Equal Opportunity for Veterans (Jun 2020) I-17 I.12 FAR 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) I-17 I.13 FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Products (May 2008)

I-18

I.14 FAR 52.230-2 Cost Accounting Standards (Jun 2020) I-18 I.15 FAR 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors (Apr 2021) [Deviation 20-03A] I-20

I.16 FAR 52.244-6 Subcontracts for Commercial Items (Apr 2021) [Deviation 20-03A]

I-21

I.17 FAR 52.252-2 Clauses Incorporated by Reference (Feb 1998) I-23 I.18 FAR 52.252-6 Authorized Deviations in Clauses (Nov 2020) I-23 I.19 Reserved I-23 I.20 NFS 1852.239-74 Information Technology System Supply Chain Risk Assessment (Deviation 15-03D)

I-24

I.21 Task Ordering Procedures [Applicable Only To IDIQ] I-25

PART III -- LIST OF DOCUMENTS, EXHIBITS, AND OTHER

ATTACHMENTS

SECTION J. LIST OF ATTACHMENTS J-1.1

J-1 Cover Sheet J-1.1 J-2 Data Requirements List J-2.1 J-3 Standard Labor Categories J-3.1 J-4 List of Government-Furnished Computer Software J-4.1 J-5 Installation Accountable Government Furnished Equipment J-5.1 J-6 List of Government-Provided Facilities J-6.1 J-7 List of Applicable Documents J-7.1 J-8 Contract Phase-In Plan J-8.1 J-9 Total Compensation Plan J-9.1 J-10 Management and Staffing Plan J-10.1 J-11 Small Business Subcontracting Plan J-11.1 J-12 Organizational Conflict of Interest (OCI) Mitigation Plan J-12.1 J-13 IT Security Management Plan J-13.1

A-5

J-14 Government Property Management Plan J-14.1 J-15 Safety and Health Plan J-15.1 J-16 Emergency Preparedness & Disaster Recovery / Continuity of Operations

Plan (DRCOP) J-16.1

J-17 Work Breakdown Structure (WBS) J-17.1 J-18 Equipment Replacement (ER) Plan J-18.1 J-19 Key Personnel J-19.1

PART IV -- REPRESENTATIONS AND INSTRUCTIONS

SECTION K. REPRESENTATIONS, CERTIFICATIONS, AND OTHER

STATEMENTS OF OFFERORS

K-1

K.1 Listing of Provisions Incorporated by Reference K-1 K.2 FAR 52.204-8 Annual Representations and Certifications [Deviation 20-02A]

K-1

K.3 FAR 52.209-7 Information Regarding Responsibility Matters (Oct 2018) K-5 K.4 Far 52.209-12 Certification Regarding Tax Matters (Oct 2020) K-7 K.5 FAR 52.230-1 Cost Accounting Standard Notices and Certification (Jun

2020) [Not applicable to small businesses] K-7

K.6 FAR 52.230-7 Proposal Disclosure—Cost Accounting Practice Changes (Apr 2005) [Applies to other than Small Business only]

K-10

K.7 NFS 1852.225-72 Restriction on Funding Activity with China-Representation (Feb 2012) (Deviation 12-01A)

K-11

SECTION L. INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS L-1

L.1 Listing of Provisions Incorporated by Reference L-1 L.2 FAR 52.215-20 Requirements For Certified Cost Or Pricing Data And Data

Other Than Certified Cost Or Pricing Data (Oct 2010) Alternate IV (Oct 2010)

L-2

L.3 FAR 52.216-1 Type Of Contract (Apr 1984) L-3 L.4 FAR 52.233-2 Service Of Protest (Sep 2006) L-3 L.5 FAR 52.252-1 Solicitation Provisions Incorporated By Reference (Feb 1998) L-3 L.6 FAR 52.252-5 Authorized Deviations In Provisions (Nov 2020) L-4 L.7 NFS 1852.215-77 Preproposal/Pre-Bid Conference (Apr 2015) L-4 L.8 NFS 1852.215-81 Proposal Page Limitations (Apr 2015) L-5 L.9 NFS 1852.239-73 Review of the Offeror’s Information Technology Systems Supply Chain (Jan 2020) (Deviation 15-03D)

L-6

L.10 NFS 1852.245-80 Government Property Management Information (Jan 2011)

L-7

L.11 NFS 1852.245-81 List of Available Government Property (Jan 2011) L-9 L.12 JPI 1852.231-71 Determination of Compensation Reasonableness (Jun 2020)

L-9

A-6

L.13 JSC 52.215-107 General Instructions For Preparation Of Proposal (Aug 2018)

L-10

L.14 JSC 52.215-123 Availability Of Specifications (Dec 2019) L-12 L.15 JSC 52.215-124 Communications Regarding This Solicitation (Aug 2018) L-12 L.16 JSC 52.215-125 Offeror Acceptance Period (Aug 2018) L-13 L.17 JSC 52.215-126 Period Covered By Procurement (Aug 2018) L-13 L.18 JSC 52.242-90 JSC Super-Flex Work Schedule (Aug 2020) L-14 L.19 Government Provided Facilities and Services [Applicable Only to IDIQ] L-14 L.20 Instructions For Proposal Preparation L-15 L.20.1 Introduction L-16 L.20.2 Proposal Arrangement, Page Limitations, Copies, and Due Dates L-17 L.20.3 Reserved L-22 L.20.4 Technical Acceptability Factor - Volume I L-22 L.20.5 Past Performance – Volume II L-29 L.20.6 Cost and Price Factor- Volume III L-32 L.20.7 Responsibility Considerations – Volume IV L.20.8 Model Contract - Volume V

L-42 L-45

SECTION L. ATTACHMENTS L1.1

L-1 Staffing Expectations L-1.1 L-2 IDIQ Technical Scenario L-2.1 L-3 Baseline EPM Template L-3.1 L-4 IDIQ EPM Template L-4.1 L-5 Government Resources Estimate (GRE) L-5.1 L-6 Past Performance Questionnaire L-6.1 L-7 Past Performance Consent Letters L-7.1 L-8 Past Performance Relevancy Matrix L-8.1 L-9 SF1408 Pre-award Survey of Prospective Contractor

Accounting System L-9.1

L-10 Small Business Subcontracting Tables – Baseline A

L-10.1

SECTION M.EVALUATION FACTORS FOR AWARD TO OFFERORS M-1

M.1 Listing of Provisions Incorporated by Reference M-1 M.2 JSC 52.215-122 Streamlined Procurement Evaluation Factors For Award

(Performance Price Tradeoff (PPT) Or Limited Tradeoff (LTO)) (Nov 2018) M-1

M.3 Technical Acceptability Factor (Volume I) M-3 M.4 Past Performance Factor (Volume II) M-4 M.5 Cost/Price Factor (Volume III) M-9 M.6 Responsibility Considerations (Volume IV) M-12 M.7 Model Contract (Volume V) M-14

Section B: Supplies or Services and Prices/Costs Solicitation# 80JSC021R0009

B-1

B. SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE

The following contract clauses pertinent to this section are hereby incorporated by reference:

I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)

CLAUSE

NUMBER DATE TITLE

NONE INCORPORATED BY REFERENCE

II. NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) PROVISIONS

CLAUSE

NUMBER DATE TITLE

NONE INCORPORATED BY REFERENCE

(End of Clauses Incorporated by Reference)

B.2 SERVICES TO BE FURNISHED

The Contractor shall provide all resources and services (except as may be expressly stated in this contract as furnished by the Government) necessary to accomplish requirements in accordance with the Statement of Work (SOW) set forth in Section C, as well as any information or actions required by other clauses or attachment incorporated in Sections A-J of this contract.

The Contractor shall perform phase-in period activities in accordance with the phase-in plan set forth in Attachment J-08, Contract Phase-in Plan (for Baseline A and B awards only).

(End of Clause)

B.3 CONTRACT TYPE

The MESC is a multiple award hybrid contract with two Cost type baselines and multi-award IDIQ component. The contract types for the MESC contracts are as follows:

(a) Baseline A: Cost-Plus-Fixed-Fee (CPFF)

(b) Baseline B: CPFF

(c) Multiple-Award IDIQ: Firm-Fixed-Price (FFP) task orders.

B-2

B.4 PHASE-IN AND CONTRACT VALUES

(a) Baseline A: NASA Aircraft Management Information System (NAMIS) Services

(1) The total FFP phase-in of Baseline A is $[Offeror Fill-In (OFI)]. This value is not included in the contract value in (a)(2).

(2) The estimated cost of Baseline A is $[OFI], exclusive of the fixed-fee of $[OFI]. The total estimated cost and fixed-fee of Baseline A is $[OFI].

(3) Fixed Fee for Baseline A is [OFI]%,

(b) Baseline B: Spaceflight Enabling Services

(1) The total FFP phase-in of Baseline B is $[OFI]. This value is not included in the contract value in (b)(2).

(2) The estimated cost of Baseline B is $[OFI], exclusive of the fixed-fee of $[OFI].

The total estimated cost and fixed-fee of Baseline B is $[OFI].

(3) Fixed Fee for Baseline B is [OFI]%.

(c) Indefinite Delivery/Indefinite Quantity (IDIQ)

(1) FFP TOs: The total firm fixed price is $[TBD].

* Applicable only to Baseline A & B, paragraphs a and b: The estimated cost, fixed fee, and total values of the exercised option period(s) will be incorporated into this clause and a total estimated cost and fixed fee values will be established that include the base and the awarded option period(s). For the estimated cost and fixed fee values of option period(s) see Clause F.4, Options to Extend Period of Performance [Applicable Only to Baselines A and B].

**Applicable only to IDIQ, paragraph c of this clause shall be unilaterally updated periodically to reflect the total value of task orders issued.

B.5 NFS 1852.232-81 CONTRACT FUNDING (JUN 1990) [Applicable Only to

Baselines A and B]

(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $[TBD]. This allotment is for Mission Enabling Services Contract (MESC) and covers the following estimated period of performance:

October 1, 2022, through [TBD].

(b) An additional amount of $[TBD] is obligated under this contract for payment of fee.

B-3

B.6 JSC 52.216-90 IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (NOV

2018) [Applicable Only to IDIQ]

In accordance with FAR 52.216-22, Indefinite Quantity, the guaranteed minimum to be ordered under this contract is $20,000 and the contract Not to Exceed (NTE) amount which may be ordered under this contract is $35,000,000*. The Government is not obligated to order more than the minimum specified but may order up to the NTE amount. The Contractor is obligated to fulfill orders issued, up to the NTE amount within the limits specified in FAR 52.216-19 Order Limitations.

*$35M is the sum total to be divided up by all contracts awarded under IDIQ

B.7 FFP IDIQ RATES [Applicable Only To IDIQ]

(a) Fully Burdened Rates exclusive of profit – The purpose of this clause is to set forth the rates to be utilized in the subsequent negotiation of FFP IDIQ orders in accordance with clause I.21, Task Ordering Procedure.

The bottom of the table allows indirect rates to be applied to any non-labor resources, except for travel, as required by task order, if applicable. Pricing of all FFP IDIQ orders shall be in accordance with the negotiated rates set forth below. Under no circumstances shall the rates used to price out task orders exceed the agreed-upon rates (including labor, indirect, and profit rates) in the Fully Burdened Rate Table shown below. The labor rates are fully-burdened composite team rates (prime and all subcontractors); these composite labor rates include wages, overhead, and G&A, but exclude prime profit. The rates in this table are maximum rates which may be proposed or negotiated for individual task orders during contract performance, for any place of performance, and will be used for evaluating task orders/revisions and determining price reasonableness. The Contractor may propose lower rates on individual orders. The parties agree that the fully burdened labor rates established below shall not be subject to any equitable adjustment (upwards or downwards), regardless of actual rates incurred during contract performance with exception of those required by statute.

Table B-1: On-site Labor Rates

Category Unit CY1 CY2 CY3 CY4 CY5

Administrative Assistant hr. OFI OFI OFI OFI OFI

Business Process Specialist I hr. OFI OFI OFI OFI OFI

B-4

Business Process Specialist II hr. OFI OFI OFI OFI OFI

Business Process Specialist III hr. OFI OFI OFI OFI OFI

Business Specialist I hr. OFI OFI OFI OFI OFI

Business Specialist II hr. OFI OFI OFI OFI OFI

Computer Security Systems Specialist hr. OFI OFI OFI OFI OFI

Computer Engineer I hr. OFI OFI OFI OFI OFI

Computer Engineer II hr. OFI OFI OFI OFI OFI

Computer Engineer III hr. OFI OFI OFI OFI OFI

Computer Engineer IV hr. OFI OFI OFI OFI OFI

Database Analyst I hr. OFI OFI OFI OFI OFI

Database Analyst II hr. OFI OFI OFI OFI OFI

Database Analyst III hr. OFI OFI OFI OFI OFI

Deputy Program Manager hr. OFI OFI OFI OFI OFI

Engineer I hr. OFI OFI OFI OFI OFI

Engineer II hr. OFI OFI OFI OFI OFI

Engineer III hr. OFI OFI OFI OFI OFI

Engineer IV hr. OFI OFI OFI OFI OFI

Graphic Specialist I hr. OFI OFI OFI OFI OFI

Graphic Specialist II hr. OFI OFI OFI OFI OFI

Graphic Specialist III hr. OFI OFI OFI OFI OFI

B-5

Intern hr. OFI OFI OFI OFI OFI

IT Professional I hr. OFI OFI OFI OFI OFI

IT Professional II hr. OFI OFI OFI OFI OFI

IT Professional III hr. OFI OFI OFI OFI OFI

Lead Software Quality Assurance Engineer hr. OFI OFI OFI OFI OFI

Program Manager hr. OFI OFI OFI OFI OFI

Project Control Specialist I hr. OFI OFI OFI OFI OFI

Project Control Specialist II hr. OFI OFI OFI OFI OFI

Project Control Specialist III hr. OFI OFI OFI OFI OFI

Project Control Specialist IV hr. OFI OFI OFI OFI OFI

Project Manager hr. OFI OFI OFI OFI OFI

Quality Assurance Specialist hr. OFI OFI OFI OFI OFI

Senior Training Specialist hr. OFI OFI OFI OFI OFI

Software Engineer I hr. OFI OFI OFI OFI OFI

Software Engineer II hr. OFI OFI OFI OFI OFI

Software Engineer III hr. OFI OFI OFI OFI OFI

Software Engineer IV hr. OFI OFI OFI OFI OFI

Software Engineer V hr. OFI OFI OFI OFI OFI

Software Manager hr. OFI OFI OFI OFI OFI

Software Quality Assurance Engineer hr. OFI OFI OFI OFI OFI

B-6

Systems Administrator I hr. OFI OFI OFI OFI OFI

Systems Administrator II hr. OFI OFI OFI OFI OFI

Systems Administrator III hr. OFI OFI OFI OFI OFI

Technical Editor hr. OFI OFI OFI OFI OFI

Technical Writer hr. OFI OFI OFI OFI OFI

Training Specialist hr. OFI OFI OFI OFI OFI

Web Software Developer hr. OFI OFI OFI OFI OFI

Other: (Specify) hr. OFI OFI OFI OFI OFI

Indirect Cost Rate to be applied to non-labor resources (Identify separately each rate(s))

% OFI OFI OFI OFI OFI

Not-To-Exceed (NTE) Profit % OFI OFI OFI OFI OFI

Table B-2: Off-site Labor Rate

Category Unit CY1 CY2 CY3 CY4 CY5

Administrative Assistant hr. OFI OFI OFI OFI OFI

Business Process Specialist I hr. OFI OFI OFI OFI OFI

Business Process Specialist II hr. OFI OFI OFI OFI OFI

Business Process Specialist III hr. OFI OFI OFI OFI OFI

Business Specialist I hr. OFI OFI OFI OFI OFI

B-7

Business Specialist II hr. OFI OFI OFI OFI OFI

Computer Security Systems Specialist hr. OFI OFI OFI OFI OFI

Computer Engineer I hr. OFI OFI OFI OFI OFI

Computer Engineer II hr. OFI OFI OFI OFI OFI

Computer Engineer III hr. OFI OFI OFI OFI OFI

Computer Engineer IV hr. OFI OFI OFI OFI OFI

Database Analyst I hr. OFI OFI OFI OFI OFI

Database Analyst II hr. OFI OFI OFI OFI OFI

Database Analyst III hr. OFI OFI OFI OFI OFI

Deputy Program Manager hr. OFI OFI OFI OFI OFI

Engineer I hr. OFI OFI OFI OFI OFI

Engineer II hr. OFI OFI OFI OFI OFI

Engineer III hr. OFI OFI OFI OFI OFI

Engineer IV hr. OFI OFI OFI OFI OFI

Graphic Specialist I hr. OFI OFI OFI OFI OFI

Graphic Specialist II hr. OFI OFI OFI OFI OFI

Graphic Specialist III hr. OFI OFI OFI OFI OFI

Intern hr. OFI OFI OFI OFI OFI

IT Professional I hr. OFI OFI OFI OFI OFI

IT Professional II hr. OFI OFI OFI OFI OFI

B-8

IT Professional III hr. OFI OFI OFI OFI OFI

Lead Software Quality Assurance Engineer hr. OFI OFI OFI OFI OFI

Program Manager hr. OFI OFI OFI OFI OFI

Project Control Specialist I hr. OFI OFI OFI OFI OFI

Project Control Specialist II hr. OFI OFI OFI OFI OFI

Project Control Specialist III hr. OFI OFI OFI OFI OFI

Project Control Specialist IV hr. OFI OFI OFI OFI OFI

Project Manager hr. OFI OFI OFI OFI OFI

Quality Assurance Specialist hr. OFI OFI OFI OFI OFI

Senior Training Specialist hr. OFI OFI OFI OFI OFI

Software Engineer I hr. OFI OFI OFI OFI OFI

Software Engineer II hr. OFI OFI OFI OFI OFI

Software Engineer III hr. OFI OFI OFI OFI OFI

Software Engineer IV hr. OFI OFI OFI OFI OFI

Software Engineer V hr. OFI OFI OFI OFI OFI

Software Manager hr. OFI OFI OFI OFI OFI

Software Quality Assurance Engineer hr. OFI OFI OFI OFI OFI

Systems Administrator I hr. OFI OFI OFI OFI OFI

Systems Administrator II hr. OFI OFI OFI OFI OFI

Systems Administrator III hr. OFI OFI OFI OFI OFI

B-9

Technical Editor hr. OFI OFI OFI OFI OFI

Technical Writer hr. OFI OFI OFI OFI OFI

Training Specialist hr. OFI OFI OFI OFI OFI

Web Software Developer hr. OFI OFI OFI OFI OFI

Other: (Specify) Composite hr. OFI OFI OFI OFI OFI

Indirect Cost Rate to be applied to non-labor resources (Identify separately each rate(s))

% OFI OFI OFI OFI OFI

NTE Profit % OFI OFI OFI OFI OFI

* Offeror may propose additional labor categories but must fill- in the proposed rates in this table and provide the proposed labor category’s description and qualifications in Attachment J-03, Standard Labor Categories.

** Maximum profit rate to be applied to firm-fixed price task orders

(b) Travel

All travel shall be in accordance with the Federal Travel Regulation, approved by the Government prior to travel, and allocated to the contract based on actual airfare and per diem rates per the most current official contiguous United Stated (CONUS) or Outside (OCONUS) Per Diem Rates, located at www.gsa.gov/travelpolicy. All requests for travel shall include the purpose and the rationale for the travel, such as why the purpose cannot be accomplished through a means other than travel (i.e., teleconferencing). Price relating to approved travel will be charged directly to individual task orders under this contract.

(c) Materials and other Non-Labor Resources Non-labor Resources, including but not limited to, materials, equipment, and facilities will be negotiated on a task order basis in accordance with Clause I.21, Task Ordering Procedures [Applicable Only to IDIQ]. As applicable, include separate price estimates for materials and other miscellaneous non-labor resources that are required for performance of the task order. All non-labor resources that are proposed must be allowable and allocable in accordance with the FAR, NASA FAR Supplement, and any other applicable NASA procurement policy

B-10 documents. The Contractor shall include back-up information with their estimate that provides rationale for their proposed price estimates for materials and other non-labor resources.

(d) Profit Rates The Offeror shall propose profit rates that are commensurate with the type of work authorized under the resultant contract. Task orders issued under the resultant contract shall not exceed the originally-proposed fee or profit rates.

[END OF SECTION]

Section C: Statement of Work Solicitation# 80JSC021R0009

C-1

Statement of Work

Section C

C-2

Table of Contents Introduction

1 Baseline A: NAMIS Services

1.1 Scope

1.2 General Requirements

1.2.1 Contract Management

1.2.2 Financial Management

1.2.3 Task Management

1.2.4 Task and Project Control

1.2.5 Planning and Execution

1.2.6 Change Management

1.2.7 Acceptance of Software

1.2.8 Briefings, Schedules, and Budgets

1.2.9 Requirements Analysis & Development Services

1.2.10 Process Analysis Services

1.2.11 Quality Assurance and Process Certifications

1.2.12 Technology Evaluations

1.2.13 Government Property

1.2.14 Non-Disclosure Agreements (NDAs)

1.2.15 Information Technology Security

1.2.16 Emergency Preparedness

1.2.17 Regulatory Impacts

1.2.18 Safety and Health

1.3 Infrastructure Services Requirements

1.3.1 Configuration Management and Control

1.3.2 System Testing and Quality Control

1.3.3 Implementation Services

1.3.4 System Integration Services

1.3.5 Infrastructure Support and Operations

1.3.6 Server and System Administration

1.3.7 Disaster Recovery and Continuity of Operations Plan (DRCOP)

1.4 End-User Support Services Requirements

1.4.1 User Support and Help Desk

1.4.2 User Training

C-3

1.5 Software Development, Maintenance, and Sustaining Engineering

1.5.1 Software Maintenance and Sustaining Engineering

1.5.2 Software Development and Modification Services

1.6 Technical Publications and Document Management

2 Baseline B: Spaceflight Enabling Services

2.1 Scope

2.2 General Requirements

2.2.1 Contract Management

2.2.2 Change Management

2.2.3 Technical Meeting Support

2.2.4 Technology Evaluations

2.2.5 Logistics

2.2.6 Government Property

2.2.7 Non-Disclosure Agreements (NDAs)

2.2.8 Information Technology Security

2.2.9 Emergency Preparedness

2.2.10 Safety and Health

2.3 Infrastructure Service Requirements

2.3.1 Configuration Management and Control

2.3.2 FOD IT (FIT) System Sustaining Engineering Support

2.3.3 FOD IT (FIT) System Operations Support

2.3.4 Collaboration and Web Services Support

2.4 End-User Support Requirements

2.4.1 Enhanced User Support Services

2.4.2 Standard User Support Services

2.5 Software Development, Maintenance, and Sustaining Engineering

2.5.1 Software Maintenance and Sustaining Engineering

2.5.2 Software Development and Modification Services

2.6 IT Resource Management (ITRM) Support

2.7 FOD Project Information System CM and Support

2.8 FOD Business Office Configuration Management Document Management (CMDM)Support

2.9 Facility Utilization and Optimization Support

2.10 Schedule Support

C-4

3 IDIQ

3.2 General Requirements

3.2.1 Contract Management

3.2.2 Financial Management

3.2.3 Change Management

3.2.4 Technology Evaluations

3.2.5 Government Property

3.2.6 Non-Disclosure Agreements (NDAs)

3.2.7 Information Technology Security

3.2.8 Emergency Preparedness

3.2.9 Safety and Health

3.3 High-Level Requirements and Work Characterization

3.3.1 Management and Mission Support Services

3.3.2 Advanced Research and Development Technology Support

Appendix A: Acronyms

C-5

Introduction

The purpose of the Mission Enabling Services Contract (MESC) is to provide development, sustainment, and maintenance of specialized and highly specialized mission-enabling applications and services to the JSC Flight Operations Directorate (FOD) and its affiliate organizations. The MESC requirements span the flight support requirements of NASA/JSC for the benefit of its external customers and partners, including, but not limited to, other NASA centers, International Partners, other Government organizations, and affiliated commercial enterprise partners.

The MESC contracting vehicle consists of three parts: two single-award baselines and a multiple-award Indefinite Delivery/Indefinite Quantity (IDIQ) component. Under the terms of this solicitation, a "baseline" comprises activities that satisfy known, continuous US government requirements that exist independent of another baseline or any task order under the IDIQ vehicle.

The two single-award baselines are the following:

• Baseline A: NASA Aircraft Management Information System (NAMIS) Services

• Baseline B: Spaceflight Enabling Services (SES)

The multiple-award IDIQ component covers new content within the general scope of the types of work covered by Baseline B where the specific IDIQ tasks are not identified as part of the Baseline B contract scope.. Additionally, IDIQ covers advanced research and development technology support.

Contractors for Baseline A, B, and IDIQ shall ensure completion of badging requirements to comply with NASA/JSC IT requirements and systems.

C-6

1 Baseline A: NAMIS Services

Baseline A provides the requirements for the comprehensive support for the NASA Aircraft Management Information System (NAMIS), an integrated, module-based, custom software suite that supports aircraft flight operations across NASA and other Government Agencies. NAMIS is an Agency-wide system in use by Ames Research Center (ARC), Armstrong Flight Research Center (AFRC), Glenn Research Center (GRC), NASA Headquarters, Johnson Space Center (JSC), Kennedy Space Center (KSC), Langley Research Center (LaRC), Marshall Space Flight Center (MSCF), Stennis Space Center (SSC), and Wallops Flight Facility (WFF). NAMIS is also used by other Government agencies and external organizations.

NAMIS operates under the authority of the Office of the NASA Chief Information Officer. NAMIS is hosted by the Aircraft Operations Division of FOD at JSC. For other agencies and organizations, NAMIS may be hosted at JSC or hosted locally by the user on user resources. NAMIS is managed by the NASA NAMIS Project Manager and the NASA NAMIS Technical Manager reporting to the NAMIS Steering Committee.

NASA operates an extensive variety of types, series, and models of aircraft. Many are special purpose or heavily-modified aircraft. Operations and maintenance of such a diverse fleet requires extensive technical documentation and publications support, much of which is incorporated into NAMIS and all of which is included in the scope of Baseline A. The documentation consists of technical publications, including maintenance manuals, operating manuals, Service Bulletins (SB), Airworthiness Directives (AD), and Time Compliance Technical Orders (TCTO). The technical documentation is generated by multiple sources, including the military, the Original Equipment Manufacturer (OEM) and the Federal Aviation Administration (FAA). NASA must receive, review, and integrate all of the documentation from all of the sources and generate appropriate NASA technical documentation.

Frequently, NASA aircraft missions require that NASA design, fabricate, test, and implement aircraft modifications and configuration changes. Most of these changes require NASA, or the operating organization, to generate technical documentation to support and provide instructions for continued airworthiness. Most of these modifications are unique to the Agency’s aircraft and require expertise in multiple aeronautical engineering disciplines. The exact nature of the aircraft modifications requiring generation of documentation cannot be determined in advance.

NAMIS users depend on multiple computer-based systems and tools for safety and mission-critical decision support; consequently, this effort is heavily focused on quality assurance and quality control of all the aircraft operations support system components.

C-7

1.1 Scope

The scope shall include all the life-cycle support elements for an enterprise-level, agency-wide project, including project management, requirements analysis, software development, testing, and verification. This includes the upgrading and integration of NAMIS and a range of data management systems to support all aspects of aviation and aircraft activities including maintenance, quality assurance, technical publications and documentation, engineering, and operations. This includes IT security management, Disaster Recovery and Continuity of Operations Plan (DRCOP) development and support, remote access support, sustaining support of deployed components, and execution of administration processes. Responsibilities also include supporting strategic and enterprise planning for the migration of data management systems into a cost-effective open systems architecture that provides users with accurate and timely information.

The scope shall include sustaining and modification of the NAMIS modules as necessary to adapt the system to provide support for other Agency activities, as required. NAMIS consists of seven modules:

a. Flight Scheduling Application

b. Flight Data Capture

c. Flight Records & Currency

d. Aircraft Logistics System

e. Work Card System

f. Aircraft Maintenance System

g. NASA Web Reporting Site

The scope shall include sustaining and modification of the following supplemental applications as well as those listed in Attachment J-04, List of Government-Furnished Computer Software:

a. Engineering Work Order Application

b. ViPER (Virtual Publications Electronic Repository)

c. QMT (Quality Management Tool)

d. NAARS (NASA Aviation Anomaly Reporting System)

e. Application Deployment Utility

f. Attachments Web Service

g. Nametags

h. Purchase Order (1307)

i. AOD Web Reporting Site

j. Aircraft Operations Web Site

k. Qualification Requirements

l. Pack and Go

m. Document Integration Tool

n. Help Desk Application

o. Infrastructure Application

p. Engineering Work Order Application

C-8

The scope shall include all services relating to implementing the NAMIS system at or on behalf of other agencies, including data cleansing, data loading, agency-specific capabilities, system configuration, development of training programs and materials, training, and user support.

The scope shall include providing IT services related to implementing Center-based and Agency-wide systems, and includes all the usual and customary efforts implied by and associated with migrating legacy systems to automated processes, upgrading existing computer-based systems, and sustaining such systems.

The scope shall include adapting the NAMIS modules for tracking and management of newly identified air and ground vehicles and other assets approved by the Government.

The scope shall extend to the associated systems that share data, hardware, software, or human resources with the NAMIS system. Examples include: security systems, system service interfaces, system data exchange interfaces, etc.

The scope shall include providing subject matter expertise at the request of the Government in all phases and aspects of aircraft operations, aircraft engineering, aircraft and ground safety, and NASA, Occupational Safety and Health Administration (OSHA) and FAA regulatory requirements relating to safety and or flight operations.

The scope shall include system engineering, operations support and sustaining engineering, application development, system maintenance and operations, data management services, system integration services, infrastructure upgrades, security management, and prototyping.

The scope shall include development and maintenance of the full spectrum of services associated with aircraft documentation.

The scope shall include the full range of integration and implementation services for any Federal agency or external organization that enters into an agreement with NASA.

1.2 General Requirements

This section of the Statement of Work (SOW) specifies the general requirements applicable to Baseline A.

1.2.1 Contract Management

The Contractor shall provide leadership, management oversight, direction, and problem resolution for all functions performed under Baseline A. The Contractor shall provide contract management to act as the primary interface to the Contracting Officer (CO), Contracting Officer Representative (COR), NASA NAMIS Project Manager, and the NASA NAMIS Technical Manager. The Contractor shall:

a. Provide a management interface who is authorized to direct day-to-day work, coordinate with NASA on contractual matters, respond to questions and action items from NASA, and resolve problems.

b. Prepare program performance metrics and report program performance.

c. Accept and utilize existing hardware, software, and documentation unless otherwise agreed with NASA.

C-9

d. For activities performed under this contract, adhere to the JSC Quality Management System (QMS) and appropriate FOD quality management documentation.

e. Comply with Attachment J-07, List of Applicable Documents.

f. Integrate with and utilize, to the maximum extent practicable, the NASA-established contract management system that includes but is not limited to order processing, contract correspondence, and Data Requirements Document (DRD) delivery.

1.2.1.1 Project Management and Staffing

The Contractor shall organize and institute integrated processes and tools for managing the products and services specified in Baseline A, in accordance with the approved Contract Management and Staffing Plan (Attachment J-10).

The Contractor shall perform activities at the request of the Government that support research, development, acquisition, and sustainment efforts across a broad spectrum of functional disciplines in order to effectively assist in the implementation of Government programs.

1.2.2 Financial Management

The Contractor shall provide project support in the area of financial management and includes, but is not limited to:

a. Conducting financial studies and research

b. Evaluating project funding plans and changes

c. Providing comments and recommendations for program guidance

d. Providing project budgeting and cost estimating

1.2.3 Task Management

For each task, the Contractor shall prepare a Task Management Plan describing the technical approach, organizational resources, management controls, and schedule to be employed to meet the cost, performance, and schedule requirements for authorized tasks. The Contractor shall provide a Work Breakdown Structure (WBS) that will allow project management and control to the subproject and task level. The Contractor shall provide monthly progress status which includes financial reports showing the cost-to-date and projected cost to completion by month for each project or major task under the SOW. Supporting or associated other direct charges (ODCs) shall be allocated to the appropriate task by the contractor. Status reports shall be provided to monitor progress to the CO, COR, NASA NAMIS Project Manager, and NASA NAMIS Technical Manager by the contractor.

1.2.4 Task and Project Control

Due to shifting budgets and mission priorities and because the Government desires the ability to capitalize on opportunities discovered during development and operations, project schedules and priorities can shift. Based upon the Government’s evaluation of priorities and available resources, the Government will make a determination of when to proceed on a major project and will issue written instructions that will include an Authority to Proceed (ATP) for the task or project. Upon receipt of an ATP, the contractor shall provide implementation plans and schedules using standard project planning tools to the Government. Each major project will be independently tracked for technical and financial performance. The Task Management Plan shall be updated as appropriate to reflect each project or task as it is added to the on-going effort.

C-10

1.2.5 Planning and Execution

The Contractor shall assist in strategic planning and execution of projects. The Contractor shall support the development of technology roadmaps, risk management plans, and strategies to support acquisition and programmatic decisions relative to project and mission objectives.

1.2.6 Change Management

The Contractor shall implement changes to hardware and software components managed under Baseline A. These changes include corrections of issues, sustaining engineering change requests, and any other change authorized by the Government. The Contractor shall update all related documentation when changes are released.

The Contractor shall integrate with and utilize the NASA-established discrepancy reporting program and systems for the submittal, status, review, ranking, and reporting of discrepancies, including, but not limited to Incident Reports (IR), Anomaly Reports (AR), Issues, etc.

The Contractor shall track discrepancies against the released code base and the NASA requirements specifications, and track change requests against the user requirements.

The Contractor shall perform scheduled and emergency releases. Scheduled releases shall occur no less frequently than once per quarter and shall consist of corrections of discrepancies/issues as well as changes and enhancements to the existing code base. Emergency releases shall be made on an as-required basis upon approval of the NASA Technical Manager.

Routine changes to aircrew flight currency requirements shall be released by the contractor immediately upon completion of successful user acceptance testing.

The Contractor shall provide changes to the NAMIS components based on requirements as specified and approved by the NASA NAMIS Technical Manager and the NASA NAMIS Configuration Control Board (CCB). Corrections of issues shall be implemented as approved by the NAMIS CCB. Change Requests (CRs) shall be executed as approved by the NAMIS CCB.

The Contractor shall update all related documentation when changes are released.

1.2.7 Acceptance of Software

The task…