MCSF Plantation Removal RFP~1.docx

DOCX document 2 MB Posted

Attached to
FAC 120 - Tree Removal within Manuel F. Correllus State Forest FY27
Solicitation number
BD-27-1020-DCRFC-DC366-132695
Issued by
Massachusetts

About this file

This is a Request for Proposals (RFP) issued by the Massachusetts Department of Conservation and Recreation (DCR) for tree removal services within Manuel F. Correllus State Forest on Martha's Vineyard. The project involves felling and removing designated white pine and Scots pine trees across approximately 104 acres divided into three parts: Part A (12 acres with 28 MBF chips totaling 897 tons), Part B (40 acres with 173 MBF chips totaling 1,716 tons), and Part C (52 acres combining Parts A and B with 201 MBF chips totaling 2,613 tons). All contractors must attend a mandatory site showing on Tuesday, September 8, 2026, at 11:00 a.m. at Manuel Correllus State Forest parking lot adjacent to gate #2, with confirmation of attendance required by Friday, September 4, 2026, at 4:00 p.m. Questions are due by Monday, September 14, 2026, at 5:00 p.m., with answers provided by September 16, 2026. Bid responses must be submitted electronically through the Commbuys system by Friday, September 18, 2026, at 5:00 p.m. The estimated contract award date is Monday, September 28, 2026, with a contract start date of Tuesday, October 13, 2026. All work must be completed by April 30, 2027, representing a four-month project duration.

The estimated value of the procurement is $150,000, and bidders must submit lump sum bids for each project part along with labor costs. Contractors must commit to distributing at least 25 percent of total board feet to local users identified in Appendices A and B, including bandsaw mill operators and a disposal operator on Martha's Vineyard. All machine operators must hold current Massachusetts Timber Harvester Licenses, and equipment must meet DCR approval requirements. Contractors are responsible for all labor, materials, equipment, permits, and compliance with prevailing wage rates as defined under Massachusetts General Laws Chapter 149, Sections 26 and 27D. Work hours are limited to Monday through Friday, 8:00 a.m. to 5:00 p.m., unless written permission is obtained. Evaluation criteria include total project cost, qualifications and demonstrated capability, experience with similar public-sector infrastructure projects, and ability to meet scope of work requirements. DCR reserves the right to accept or reject any or all quotes and to contract with one or more vendors. The contract falls under FAC120 for Landscaping Services, Snow Removal, Tree Care and Related Services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work – Request for Quote

RFP Title: (FAC120) Tree Removal within Manuel F. Correllus State ForestFY27

Commbuys Bid #: BD-27-1020-DCRFC-DC366-132695 Contract #: FAC120 Contract Category: Category 3: Tree Services Description of need Summary: This Request for Proposals (RFP) is posted by the Department of Conservation and Recreation (DCR) for the procurement of a vendor to:

Conduct removal of trees on DCR Lands within Manuel F. Correllus State Forestin accordance with FAC120 – Landscaping Services, Snow Removal, Tree Care and Related Services and the provisions of the contract as listed in the Scope of Work.

Commonwealth Eligible Entity Engaging a Vendor:

Eligible Entity NameDepartment of Conservation and Recreation
Type of Eligible Entity:State Agency
Eligible Entity Mailing Address:P.O. Box 66, South Carver, MA 02366
Contact Name:Paul Gregory
E-Mail Address:paul.gregory@mass.gov
Telephone:508-468-8215

This Request for Proposal (RFP) does not commit DCR to approve a Statement of Work (SOW), pay any costs incurred in the preparation of a bidder’s response to this RFP, or to engage for products or services. DCR reserves the right to accept or reject any and all quotes received as a result of this RFP and to contract for some, all, or none of the responding vendors as a result of this RFP. DCR further reserves the right to negotiate with any or all responding vendors or to cancel this RFP, in part or in its entirety, if it is in the best interest of the agency to do so.

Estimated Duration of Project: 4 months

Estimated Value of Procurement: $150,000

Anticipated Completion of Project: April 30, 2027

The selected vendor will be responsible for the following tasks/specifications sought:

Scope of Services:

Felling and Whole Tree Removal Specifications:

· All white pine trees and Scots pine trees shall be felled and removed from the site.

· All felled trees shall be cut to within 1” of the ground surface.

· All oak trees and pitch pine trees shall be retained.

· All standing dead trees regardless of size within a tree length of any road, bike path, or trail will be removed.

· Boundary trees will be cut. The project boundary is marked with triple blue paint stripes.

· All tree stumps shall protrude no more than 2” from the ground surface at the conclusion of the project.

· All chips are to be removed from the site.

As this project involves restoring disturbance dependent natural communities there will be no set skid roads, but rather a directive to broadcast travelled routes throughout the project area. There is a 50-ft no cut buffer along all trails and a 30-ft buffer along the paved bike path.

Approximate volumes in treatment areas (see map for location):

Part A. 12-acres total (four 3-acre areas) 28 MBF chips: 897 tons

Part B. 40-acre area 173 MBF chips: 1,716 tons

Part C. 52-acres (Part A + Part B) 201 MBF chips: 2,613 tons MBF=thousand board feet

Equipment Specifications:

Machinery is subject to approval by DCR and must be capable of felling and whole tree removal, transporting, and removing from the project area all designated trees. Approved machinery must be kept at specified equipment staging areas identified by DCR staff when not in use, unless otherwise permitted. All machinery must carry working fire extinguishers and spill kit. A steel plate, wooden timber mat, or other material approved by DCR shall be provided by the Contractor for machinery crossing of the paved bike path.

Local Use:

To facilitate local use of forest products, the Martha’s Vineyard Commission has assembled a list (Appendices A and B) of potential local sawmill owners and a disposal operator willing to discuss terms on which to disseminate material on the island. It is our hope they will be available in-person at the Showing as well. The Contractor will be required to distribute to local users at least 25% of the total board feet and will provide such percentage with their bid.

Other Requirements:

· All forest roads will be continually maintained in order to preserve them in their current condition. Forest roads will need to be passable for emergency vehicles. At the conclusion of mechanical operations, forest roads shall be graded. Impacts associated with grading the road must remain within the existing road.

· No new gravel will be used to maintain forest roads.

· Access to project areas shall be limited to existing forest roads and/or paved roads at marked locations. Care shall be used when traveling on existing forest roads or paved roads - all tires shall remain on the existing forest roads except for direct access to the project areas.

· No parking or skidding will be allowed on existing mowed fuel breaks and landings will be placed in the interior of the plantations.

· Equipment shall be staged within existing paved surfaces or the existing forest roads. Any vehicle not in use during operations shall be parked entirely on existing paved surfaces or the existing forest roads.

· No felling of trees towards the trails or paved bike path.

· The narrow strip of vegetation between the paved bike path and Edgartown-West Tisbury Road will not be treated, therefore no equipment is allowed between Edgartown West Tisbury Road and the paved bike path.

· All roads, fuel breaks, paved bike paths, hiking trails, and landings (within the project area) shall be cleared of all woody material upon completion of tree removal activities.

· All machine operators shall have a current Massachusetts Timber Harvester License.

· Gates must be kept closed when not in use and locked at the end of each day.

· Contractor shall only cross each trail at one location.

· Contractor shall work with DCR’s Indigenous Peoples Partnership Coordinator to deliver (on island) a predetermined amount of sawlogs (not to exceed 5,000 board feet) to the Wampanoag Tribe of Gay Head (Aquinnah). This may include specific sizes.

· Research plot

· Remove merchantable sawlogs from a designated 1-acre research plot within the northwestern 3-acre area of Part A. Transport sawlogs to 74 Cook Rd, Vineyard Haven, Massachusetts.

· Cut all remaining trees from the eastern half of the 1-acre plot and leave in place. Do not pile the remaining trees in this half of the 1-acre plot.

· Cut all remaining trees from the western half of the 1-acre plot and chip trees into an empty truck(s).

· Allow Maggie Craig from the Martha’s Vineyard Commission, or her designee, to remove representative samples of the green chips within 15 minutes of being chipped.

· Haul the woodchips from the western half of the 1-acre plot to a truck scale at Goodale Construction Company, 164 Edgartown Vineyard Haven Road in Oak Bluffs Massachusetts. Once weighed, chips may be disposed of by the contractor.

Fire Road 11 (see map) may not be able to support the weight of heavy equipment. The Contractor must have a contingency plan to stabilize forest roads (e.g. timber mats) to protect vehicles and equipment from potentially rutting and sinking in Forest Road 11 due to its sandy condition. Permanent site stabilization (lacing of gravel or similar) is prohibited. Temporary stabilization is permitted, provided all temporary stabilization is removed at the completion of harvesting operations.

Additional Specifications

1. Cutting of trees beyond what is specifically described is not permitted.

2. Tracked machinery, machinery with tire chains, or log loaders with downriggers may not use or cross any road with an asphalt surface without:

a. Written permission from the Forester which documents location and circumstance; and

b. Providing suitable protection provided to the asphalt surface.

3. Signage must be provided on all State Forest roads, trails, and paved bike paths and other public roads warning the traveling public of operations. The bike path will be closed during operations with proper signage from the contractor.

4. The Contractor shall provide DCR with at least 72-hour notice of when they plan to begin work and of when they plan to end work.

5. The Contractor shall perform routine closing maintenance on permanent roads but not limited to smoothing road surfaces, remove ruts, maintain existing water diversion features to ensure they function properly and construct additional water diversion features if needed.

6. Oil-absorbent mats will be on hand in case of a fuel or hydraulic fluid spill or leak.

7. At the conclusion of the operation, the Contractor will accompany the DCR designee on a final walkthrough and evaluation of the site to ensure that all required work is completed satisfactorily.

8. The Operator shall be required to thoroughly clean all equipment before entering DCR property. Equipment will be allowed on DCR property when DCR determines that it has been cleaned and a reasonable effort has been made to remove dirt and other debris. Equipment that fails the inspection may not be unloaded onto DCR property until adequately cleaned. The Operator shall allow DCR to inspect all equipment during the regular working hours before it may be unloaded from the trailer onto DCR property. If an inspection cannot be scheduled in a timely manner, DCR may designate a location where the equipment can be left, either unloaded or still on the trailer, until the inspection can take place. If the equipment does not pass inspection, it must be removed from DCR property along with any dirt and debris that may have fallen from it. This shall be done at the contractor’s expense.

9. The contractor shall protect all known survey monuments, witness corners, reference monuments, and bearing trees against avoidable destruction, obliteration, or damage during contractor’s operations. If any known monuments, corners, or accessories are destroyed, obliterated, or damaged by contractor’s operations, contractor is required to reestablish or restore at the same location the monuments, corners, or accessories to their original status.

GENERAL SPECIFICATIONS

1) Scope of Work

a) The Contractor shall provide all labor, materials, equipment, supervision, and other services and permits required to complete the work.

b) The Contractor shall meet all provisions as outlined in OSD’s Statewide Contract FAC 120.

c) Prior to performing any work, the Contractor shall provide DCR a work schedule for all crews and personnel performing mowing/mulching and associated contract services.

d) Prior to the completion of all work, the Contractor and a DCR representative shall perform a site visit to ensure compliance with specifications.

2) Superintendent, Skilled Labor, and Employees

a) The Contractor shall assign a suitable superintendent to this contract for its duration; and shall provide DCR with the name and contact information of the superintendent so designated by the Contractor. The Contractor hereby warrants and represents that:

i) The superintendent is duly authorized to manage the day-to-day operations identified in this scope of service and bind the Contractor to all work associated with the timely and proper implementation of these specifications and performance standards identified in this Scope of Service.

ii) The operators and all others employed by the Contractor shall be licensed, skilled, experienced, and trained in the particular scope assigned to them.

iii) The Contractor shall comply with all applicable local, state and federal laws, including, without limitation, OSHA and any other regulations concerning the performance of this contract.

iv) Each employee assigned to perform work under this Scope of Services shall perform such work and otherwise engage with the public and state officials in a professional and competent manner.

v) All bidders must thoroughly acquaint themselves with these limitations and include in their pricing all necessary and specified materials, labor, equipment, and safety apparatus to complete the work as specified.

b) The superintendent shall be thoroughly knowledgeable and informed concerning every aspect of this work.

c) Upon request, the Contractor shall furnish DCR a copy of all resumes, licenses and credentials of all employees retained by Contractor to perform services under this Contract.

d) The Contractor shall keep accurate and complete records of all work performed under this Contract and shall make such records available to DCR for inspection.

e) The Contractor agrees to transfer any employee that DCR, by and through its DCR Monitor, has determined to engage in unprofessional conduct in contravention in subparagraph 2(a)(iv) above.

3) Night, Saturday, Sunday, or Holiday Work

a) The Contractor shall prosecute its work under the Notice to Proceed or any subsequently issued Work Order from Monday through Friday and for this contract during the hours of 8:00 am to 5:00 pm. The Contractor shall not perform any work on any weekend, duly recognized Holiday or non-standard hours unless the Contractor receives express written permission from DCR.

Weather Conditions

b) The Contractor shall be responsible to employ all means and measures to perform this work as assigned at all times during a calendar year. No work will be done when, in the opinion of DCR, the weather or conditions are unsuitable.

4) Change Orders Generally

a) No changes in the work shall be made in absence of a Notice to Proceed, directing the Contractor to perform such changes.

b) A request for a change in the provisions of this Contract may be submitted to DCR. The request must be made in writing and in accordance with the provisions of this Contract.

c) A Change Order may only be issued by DCR for changes in the Work within the scope of this Contract, including but not limited to changes in: (1) the Plans and Specifications; (2) the method or manner of performance of the Work; (3) amount of furnished services; or (4) the schedule for performance of the Work.

d) The Contractor shall immediately perform any Change Order work ordered by DCR.

5) Protection of Persons and Property

a) The Contractor shall perform all work in a safe and orderly manner.

b) The Contractor shall ensure that it performs its work in such a manner to ensure no damage to property contiguous to tree cutting activities, including those public and private.

c) The Contractor is, at no additional cost to the Agency, responsible for addressing and solving any such problems it encounters during operations.

d) The Contractor shall erect and otherwise post warning signage, and/ or other approved and mandated devices to warn persons and vehicles passing and/ or moving by all work sites.

e) DCR reserves the right to require the Contractor to provide security fence and enclosures as required by job conditions to insure protection of persons, materials, and work on the site.

f) The Contractor shall safely protect the property of all public and private concerns and all adjacent property from loss or damage because of the work and shall repair or replace any damage, injury, or loss resulting from this Contract at no additional cost to DCR or property owners.

6) Safety Regulations

a) The Contractor shall perform all work under this Scope of Services in strict accordance with all applicable OSHA and State safety regulations.

b) The Contractor shall assume the entire responsibility for the safety of employees and shall be responsible for all injury resulting from the failure thereof. All equipment and vehicles must have an up-to-date safety inspection.

7) Traffic

a) The Contractor shall perform all work covered under this Scope of Services in such a manner that maintains the safety of pedestrian, bicycle, or horse traffic on forest roads and trails.

8) Payments

a) The Contractor shall submit a final invoice, preferably electronic file, emailed to DCR for the payment of duly completed work under a duly issued Notice to Proceed.

b) DCR reserves the right to withhold payment for one or more of the following matters:

i) The Contractor fails to perform its work in a professional manner.

ii) Any claim by any third party for any work arising out of Contractor’s performance of work under this Contract.

iii) The Contractor failed to comply, in all respects with the Wetlands Protection Regulations set forth at 310 CMR 10.06(6)(a)4.

iv) The Contractor failed to make payments in a timely manner to subcontractors or for labor, material, or equipment, and/ or unsatisfactory prosecution of the work by the Contractor.

v) The Contractor has failed to comply with the cleanup standards set forth in Paragraph 13 below.

vi) Proper back up documentation not supplied.

c) Before DCR withholds any payment to the Contractor under this Contract, DCR shall provide the Contractor written notice of its intent to withhold specifying the reasons for its actions. The Contractor shall be afforded ten (10) business days from date of issuance to cure DCR’s reasons for withholding payment.

9) Guarantees and Warrantees

a) The Contractor shall guarantee their workmanship for one year after completion and acceptance by DCR, and shall cure, without any cost to DCR, any defect that may occur during this period.

10) Permits, Fees, and Notices

a) The Contractor shall secure and pay all permits and governmental fees, licenses, and inspections necessary for the proper execution and completion of the work which are customarily secured after the execution of a contract, and which are legally required based on the scope of work.

11) Prevailing Wage Rates

a) Wage Rates must be in accordance with G. L. c. 149, §§26 and 27D the Prevailing Wage Rates as instructed in FAC120.

b) The awarding authority has a legal obligation to request a prevailing wage schedule from the Department of Labor Standards (DLS) at www.mass.gov/dols. In addition, bidders and proposers must agree to comply with the Prevailing Wage Law, as administered by the DLS. Questions regarding the Prevailing Wage Law may be answered by accessing the DLS website at www.mass.gov/dols or by calling the DLS Prevailing Wage Program at (617) 626-6953.

12) Project Clean Up

a) The Contractor shall leave the premises in an orderly condition approved by a DCR representative and will be responsible for any additional costs associated with unfinished cleanup work.

13) Reassignment of the Contract

a) The Contractor will not be permitted to either assign the contract, or assign either legally or equitably, any moneys hereunder or its claim thereto, without DCR’s previously written consent.

14) Price/Time Increases

a) Notwithstanding any provision of this Contract to the contrary, except as otherwise provided by law, the Contractor shall not be entitled to increase the Contract Price or to receive damages because of any hindrances or delays, avoidable or unavoidable; but if any delay is caused in DCR’s opinion, the Contractor shall be entitled to an extension of time. The length of the extension shall be sufficient in DCR’s opinion for the Contractor to complete the Work. Although no delay shall increase the Contract Price, DCR may require that any change in the date by which the Contractor must complete all or any part of the Work be processed on a standard Change Order form.

Responsive bids must include the following to be considered:

· Identify all labor, equipment, and materials necessary to perform and complete all work required under the Specifications and Scope of Work

· List of equipment including make, model and age

· List of employees that may be deployed for this contract to include all qualifications, licenses, industry certifications and years of experience

· Completion of the included bid sheet

· Certified copies of each subcontractor’s insurance policies, which must meet the same insurance coverage levels as required under FAC 120.

· Three references (names, telephone number, and addresses) related in scope to projects similar to this contract.

Tree Removal within Manuel Correllus State Forest Bid Sheet FAC120: Landscaping Services, Snow Removal, Tree Care and Related Services Work to be completed: By April 30, 2027

Part A. 12-acres (divided into four 3-acre areas) Labor cost: ________________ Lump Sum Bid (includes labor): ___________________ Percentage of the total board feet to be distributed to local users: _____%

Part B. 40-acre area Labor cost: _______________ Lump Sum Bid (includes labor): ___________________ Percentage of the total board feet to be distributed to local users: _____%

Part C. 52-acre (Part A + Part B) Labor cost: _______________ Lump Sum Bid (includes labor): ___________________ Percentage of the total board feet to be distributed to local users: _____%

Company Name

____________________________________________________
SignatureDate
_____________________________________________________
NameTitle
____________________________________________________
Phone NumberEmail

Address

I understand and agree to the terms and conditions of the Tree Removal in Manuel Correllus State Forest prospectus and my bids reflect full execution and compliance: DCR reserves the right to evaluate all bid submissions on past similar experiences, available resources, reference checks, and costs and the award of contracts to one or more contractors.

Timeframe for work to be completed: By April 30, 2027

· Individual sections may not be completed due to operational needs and/or fiscal constraints.

Showing:

· Tuesday, September 8, 2026, at 11 am at the Manuel Correllus State Forest parking lot adjacent to gate #2, located at the intersection of Edgartown-West Tisbury Road and Fire Road 12 in Edgartown.

· It is mandatory for all vendors to attend Showing prior to submitting a bid. Bids will not be accepted from vendors who do not attend Showing.

· It is mandatory for all vendors to confirm their attendance for the Showing by emailing their name and contact information to Paul Gregory at paul.gregory@mass.gov prior to Friday September 4th at 4pm. DCR will verify receipt of email.

Evaluation Criteria: Responses will be evaluated according to the following criteria:

· Total Project Cost

· Qualifications and demonstrated capability

· Experience with similar public-sector infrastructure projects

· Ability to meet requirements outlined in the Scope of Work

Responses: Responses (bids/quotes) are to be submitted to DCR electronically via the “Create Quote” function contained in Commbuys system. If you are a vendor on FAC120 and have not registered on Commbuys, you are required to do so. Vendors should consult the vendor user guide at http://www.mass.gov/anf/docs/osd/commbuys/commbuys-vendor-registration.

Help is available from the Commbuys Help Desk at (888) 627-8283 Questions are Due by: Monday, September 14, 2026, at 5 pm Answers to Questions will be submitted by: September 16, 2026 RFQ Responses are due by: Friday, September 18, 2026, at 5 pm Estimated Award Date: Monday, September 28, 2026 Contract Start Date (EST): Tuesday, October 13, 2026 Project Number: SE-01-27-T Appendix A - Bandsaw mill operators and interested parties list

Contact
Email
Phone
Matt Chronister
mchronister8@icloud.com
774-563-0114
Zoli Clarke
clarkezrc@gmail.com
508-627-0342
Jon Fragosa
jon@ttlimited.com
508-693-0574
Olin Gannon
olingannon@gmail.com
774-563-9265
Bryan Keats
bskeats@gmail.com
508-488-8917
Carter Payne
carter.payne@gmail.com
617-286-2446
Zach Pinerio
zachpinerio@gmail.com
Carlton Sprague
hmscable@aol.com
508-560-2038
Nate Sprague
nwsprague@gmail.com

Appendix B - Disposal operator

Contact
Email
Phone
John Keene / John Keene Excavation, Inc.
office@johnkeene.com
(508) 693-5975

Individuals wishing to be added to the above list, please contact Paul Gregory - paul.gregory@mass.gov image1.jpeg image2.jpg image3.jpg