MBS4E-INVITATION_TO_BID__PH2_Round_III.pdf
PDF 122 KB Posted
- Attached to
- EXT CII | MB4E PH1 and PH2 Bid Package III
- Solicitation number
- SFGOV-0000011925
- Issued by
- San Francisco County, San Francisco City, California
About this file
This is an Invitation to Bid (ITB) document issued by Swinerton|Rubecon Joint Venture on behalf of Mission Bay 4 East Associates, L.P., for Phase II construction of the Mission Bay 4 East residential development in San Francisco. The project encompasses two phases totaling approximately 398 affordable residential family apartments with above-ground parking garages, amenity spaces, and commercial community services. Phase I consists of one 16-story residential tower with 233 dwelling units. The ITB solicits bids for nine specific trades including survey, demo and excavation, concrete, structural steel and miscellaneous iron, below and above-grade waterproofing, metal wall panels, framing and drywall, shoring, and site utilities and joint trench work. Certain aspects of these trades will be design-build requiring bidders to submit all drawings, specifications, and calculations for permit preparation and response to permit comments. A pre-bid conference is scheduled for Wednesday, July 15th, 2026 at 10:00 a.m. via Zoom, with an RFI deadline of Thursday, July 23rd, 2026 at 5:00 p.m., and bids due Friday, August 7th, 2026 by 2:00 p.m. Construction is scheduled to begin February 2028 with a 22-month duration.
The project is subject to compliance requirements including State Prevailing Wage and Davis Bacon Prevailing Wage standards, a 50% local hiring goal for San Francisco residents as established by the OCII Construction Workforce Agreement, and 50% Small Business Enterprise (SBE) participation goals with recognition for joint ventures between SBE and non-SBE firms meeting specified performance thresholds. Bidders must base pricing on the latest project schedule and logistics plans provided through the Building Connected platform. All bid and contract documents are accessible through Building Connected, and bidders must submit proposals through their company profiles. Questions and document requests should be directed to Swinerton estimator Mirna Dardon at mirna.dardon@swinerton.com. The project is 100% affordable housing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EXT_CII___MB4E_PH1_and_PH2_Bid_Package_III.xml | XML file | |
| MBS4E-INVITATION_TO_BID__PH1_Round_III_.pdf | ||
| EXT_CII___MB4E_PH1_and_PH2_Bid_Package_III.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
MB4E Phase II Bid Package
Owner/Developer: Mission Bay 4 East Associates, L.P.
Architect: Y.A. Studio & Perry Architects
BID DUE DATE: Friday, August 7th, 2026 @ 2:00 p.m.
PROJECT DISCRIPTION:
The total project is comprised of two phases totaling approximately 398 residential family apartments, each building with an above-ground parking garage, associated amenity spaces and a commercial community service. This Bid is for Phase I Trades listed below ONLY based on the schedule included in this RFP with a Feb 2028 NTP. These trades are being bid to get subcontractors on board now to provide constructability, logistical and scheduling input and prepare documents for permit addenda submittals and with other trades being bid off later CD documents
• Survey
• Demo & Excavation
• Concrete
• Structural Steel & Misc. Iron
• Below & Above Grade Waterproofing (inc. VIMS)
• Metal Wall Panels
• Framing & Drywall
• Shoring
• Site Utilities & Joint Trench
The project phase I consists of one residential 16-story building tower:
• North tower, phase II – 233 DU.
Please see below important notes to keep in mind as you prepare your proposal:
• This project has been awarded to Swinerton|Rubecon Joint Venture.
• Swinerton|Rubecon is requesting bids for this project.
• Project is 100% affordable housing.
• COMPLIANCE REQUIREMENTS - The Project is subject to OCII/CMD hiring goals and Federal and
State prevailing wage requirements. The parties acknowledge and agree to comply with the hiring goals of OCII which are:
1. Project has State Prevailing wage and Davis Bacon Prevailing Wage requirements. Refer to “MBS_Block_4E_Att. K - Prevailing Wage - Labor Standards” included with this RFP.
2. A good faith effort to meet a 50% local hiring goal whereby San Francisco Residents complete at least 50% of the total workforce hours according to OCII Construction Workforce Agreement Version 5/15. Refer to “MBS_Block_4E_Att. G - OCII Workforce Agreement” included with this
RFP.
3. SBE participation goals are 50% which means that the Contractor shall use its best efforts to award at least 50% of all Contracts to SBE according to OCII SBE Policy adopted 11/16/2004 up to its 3rd amendment dated 3/15/2022. OCII will recognize Joint Ventures (JVs) and Associations between non-SBE firms and SBE firms where the SBE partner performs at least 35% of the work defined in the JV or Association agreement and receives at least 35% of the dollars to be earned by the JV or Association, which will count as total 100% SBE participation. Refer to “MBS_Block_4E_Att. F - OCII SBE Policy” included with this RFP.
• Pricing per the latest schedule version “Mission Bay Block 4E Phase 2 which will be included with the RFP.
• Pricing per the Logistics Plan and Temporary Power Logistic included with this RFP.
• Certain aspects of the above listed trades will be Design-Build – Bids to include all drawings, specification, calculations and as appropriate to prepare drawings for permit and respond to permit comments.
PLEASE BEAKDOWN YOUR PROPOSALS AS FOLLOW:
Pre-Bid Conference: Wednesday, July 15th, 2026, at 10:00 am.
Location: Virtual Zoom Meeting Meeting Link: https://us06web.zoom.us/meeting/register/me7KoTyEQzi0LNQCOnY__g
TRADES BEING BOUGHT OUT FOR AWARD:
- As noted above
SCHEDULE: Construction starts February 2028, with a 22-month construction duration
DEADLINE FOR RFI’S: Thursday, July 23rd, 2026, at 5:00 p.m. Please send RFI’s (Word, PDF, Excel, etc.)
through messaging portal on Building Connected.
BID / CONTRACT DOCUMENTS: All documents can be accessed through Building Connected. Please submit your bid through your company profile for respective bid packages being pursued.
For any questions regarding this project or Building Connected access, please contact Swinerton estimator, Mirna Dardon at mirna.dardon@swinerton.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fus06web.zoom.us%2Fmeeting%2Fregister%2Fme7KoTyEQzi0LNQCOnY__g&data=05%7C02%7CAMoore%40swinerton.com%7Cf03e39062d254730ccc308ded5efc6ae%7C5d793645a4cb4dc990f2c691a6fb6f16%7C0%7C0%7C639183422970339878%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=h6SKOhXVZ08lHLtrSDjX%2FZcjatNvJpxSOaMNMiLZBYM%3D&reserved=0
File details come from the government source that posted it. Updated .