MACC 4.0 Industry Day PRESENTATION - 15AUG25.pdf

PDF 3 MB Posted

Attached to
MACDILL AFB - MACC 4. 0 Industry Day information - 15AUG25
Solicitation number
FA481425FMACC
Issued by

About this file

This document is a presentation for the Multiple Award Construction Contract (MACC) 4.0 Industry Day for MacDill Air Force Base (AFB), scheduled for 15 August 2025. The 6th Contracting Squadron is hosting the event, which provides an overview of their upcoming contract opportunity. Key details include:

The MACC 4.0 is a Firm Fixed Price contract with a duration of 7-10 years and a ceiling of approximately $500 million. It will use a Best Value Trade-Off selection criteria, focusing on demonstrable capabilities in mechanical, electrical, design, and other construction-related areas. The contract is a Total Small Business Set-Aside targeting Commercial and Institutional Building Construction (NAICS 236220). The draft Request for Proposal (RFP) is expected in the first quarter of 2026, with an approximate target award date of March 2027. The contract will support MacDill AFB's infrastructure needs, including maintenance and repair of over 671 facilities, with a focus on mission-critical utility and infrastructure systems, energy consumption reduction, and environmental compliance.

View the file

Other files

File Type Posted
CMMC Scoping Guide L2.pdf PDF
Pre-Industry Day Q and A.pdf PDF
CMMC General Info (Q.16 from Q&A).pdf PDF
Industry Day - Attendance Sheet.pdf PDF
CMMC Scoping Guide L3.pdf PDF
CMMC Scoping Guide L1.pdf PDF
MacDill MACC 4.0 - Q&A - 15AUG25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1Deliberate Excellence!

6th Contracting Squadron Mission: Deliver Unmatched Mission Support

Vision: Deliberate Excellence!

Air Mobility Command’s (AMC) largest and busiest contracting squadron

Provides more than $1 billion in contracting support to

USSOCOM, USCENTCOM, JCSE, 6 AMW, 927 ARW,

and 33 other mission partners

Includes Air Combat Command’s (ACC) Avon Park Air Force Range (AFR)

Awards multi-million-dollar complex contracts to maintain combat readiness and sustainability worldwide.

2Deliberate Excellence!

Industry Day for

Multiple Award Construction Contract (MACC) 4.0

15 August 2025

MacDill Air Force Base (AFB)

3Deliberate Excellence!

MacDill AFB at a Glance

4Deliberate Excellence!

“A Day in the Life”

A Day in the Life at MacDill AFB

The Future of MacDill AFB

MacDill AFB & Community Partners Military / DAF Civilians / Contractors

Light, Lean, Lethal!

5Deliberate Excellence!

Tenant Units Support

U.S. Special Operations Command (USSOCOM)

U.S. Central Command (USCENTCOM)

Marine Corps Forces Central Command (MARCENT)

Special Operations Command Central (SOCCENT)

Joint Communications Support Element (JCSE)

6Deliberate Excellence!

PROHIBITED ITEMS and CONDUCT Access to MacDill AFB requires your vehicle be inspected for contraband. The following items are prohibited to be brought onto the Installation. If found, you are subject to denial, apprehension and seizure of your property, and the possibility of getting a Federal criminal charge.

Things to be aware of:

Seatbelts are required to be worn at ALL times The base is hands-free driving only No ear buds are allowed while driving Security Forces can issue a citation that has a monetary fee associated with it

7Deliberate Excellence!

PROHIBITED ITEMS and CONDUCT Drugs

Only prescription and over the counter medication is allowed.

*MEDICAL MARIJUANA and THC VAPE PENS/GUMMIES ARE NOT ALLOWED*

Weapons No firearms of any type No knives or blades (swords/machete) over 3 inches without a valid work reason No pepper spray, tasers or brass knuckles No bullets or magazines

No Alcohol No Drones

Inappropriate conduct or failure to comply with Security Forces is also not tolerated and can result in a base denial or criminal charges filed depending on the situation.

Refusal to allow your vehicle to be searched for any reason will result in a base denial.

8Deliberate Excellence!

Visitor Pass Requirements United States Citizens Must be a current REAL ID Drivers License, State ID Card or Passport Vehicle Information – Registration, Insurance (If operating a vehicle) Able to pass a background check We do not accept a picture or email of any required credentials

Foreign Nationals Must be a current REAL ID Drivers License, State ID Card, Passport &

Work Visa Vehicle Information – Registration, Insurance (If operating a vehicle) Able to pass a background AND immigration check We do not accept a picture or email of any required credentials

9Deliberate Excellence!

Tanker Way Information Hours of Operation:

Monday – Friday: 0600 – 1630 (6 a.m. – 4:30 p.m.)

Closed on all Federal Holidays and *select* base down days Any vehicles coming in outside of Tanker Way hours must go to the

Dale Mabry Gate ONLY

Contact Information:

Tanker Way DSN: 813-828-7790 Bldg. 895 Tanker Way Gate (Intersection of Interbay and Tanker Way)

Emergency Contact Law Enforcement Desk: 813-828-3322

Office of Special Investigations

5ÚÍ ËÑÉÖ"# Ï Í ÕÝ"6ŸÜÉä

& ’ 6 "���Л"/ ÉË&ÑÖÖ"#ÑÜ"( ŠÜËÍ "$ ÉÙÍ Л"( .

* Í ÖÚÑÕÏ "; ŠŸ"2ÜÍ ŽÍ ÕÝ"( ÜÉŸÈ

Helping to Prevent Fraud

• Jurisdiction for Office of Special Investigation is very broad and is primarily based on location, personnel, mission sets, property and resources.

• Office of Special Investigations is a federal law enforcement agency responsible for conducting independent criminal investigations involving the Department of Defense (DoD) or Department of the Air Force personnel, property or resources.

• Office of Special Investigation (OSI) derives its federal law enforcement authority, and the ability conduct independent criminal investigations from Public Law directing the Secretary of the Air Force to vest authority in OSI.

12Deliberate Excellence!

Meet Our Team Greeting Mr. Jason Wilkin (6 CONS Construction Flight Chief)

6 CONS MACC 3.0 Review Mr. Terrell Phillips (Contracting Officer)

6 CONS MACC 4.0 Brief Mr. Matthew Johnson (Contracting Officer) SrA Joseph Delamater (Contracting Specialist)

6th Civil Engineer Squadron (CES) Brief Mr. Brian Boyle Mr. Orlando Romero Ms. Kristen Hlad-Wilkerson, CTR Mr. Tony Rodriguez, CTR Mr. Chris Sutton, CTR

13Deliberate Excellence!

MACC 3.0

MACC (Multiple Award Construction Contract)

IDIQ (Indefinite Delivery, Indefinite Quantity) – Contract Type

Establishes an internal market focused on MacDill AFB

Competition among MACC Contractors results in an awarded Task Order

Task Orders are “Cradle to Grave”

Options (Multiple Years)

14Deliberate Excellence!

Total Small Business Set-Aside – FFP (Firm Fixed Price) Includes (Design (rare), Design / Construction (Design-Build), or Construction

(after receipt of 100% Design)

Base and 6 Option Years (2020 – 2027)

Began with 19 Contractors, currently have 5 remaining Performance metrics for quality and participation

Limit was set at $500M total (roughly $71M+ a year), minimum of $500 orientation

No saturation limit

15Deliberate Excellence!

North American Industry Classification System (NAICS)

(236220) – Commercial and Institutional Building Construction

(Past 24 months)

FY23

Awarded Projects: 16 Total ($) Value: $12M

FY24

Awarded Projects: 31 Total ($) Value: $41M

- KC - 46 Expansion

- Tenant Support

- Hurricane Repair/Storm Damage

16Deliberate Excellence!

MACC 3.0 – Flow (Solicitation to Task Order)

Fair Opportunity

Proposal Request

(FOPR) Release

Site Visit Request for Information

(RFI)

Revisions (Amendments /Addendums)

Task Order Award

17Deliberate Excellence!

MACC 3.0 - Unique Elements Close-Out Phase: 10% value of total Task Order amount Reserved as final invoice once all close out submittals are complete

Use of specific equipment or suppliers (ex. HVAC – Government’s Best Interest and preventative maintenance) MACC does not include Preventative Maintenance (PM) – Government currently handles PM separately

Expediency of Flow: Timelines for RFI, Site Visits, & Task Order Awards Condensed Periods of Performance (PoPs), Review for Submittals and Design

Review, Waiting for Funds

Contingency Support – Patrick SFB and the MACC Pool of 20

18Deliberate Excellence!

While on break… Submit your questions

(Questions will be answered after lunch)

BREAK

19Deliberate Excellence!

Whole Team Approach

The New Team Dynamics

Cross Discipline Partnerships

Contracting Officer & Contract Administrator Roles MACC source selection Future IDIQ contract

20Deliberate Excellence!

Tentative Details of MACC 4.0

Contract Type: Firm Fixed Price Duration: 7-10 years Ceiling: ~$500M Selection Criteria: Best Value Trade-Off Demonstratable Capabilities: (Mechanical, Electrical, Design, etc.)

21Deliberate Excellence!

What’s Next?

Draft Request For Proposal (RFP) (solicitation and attachments)

Contains details for the finalized solicitation.

Drafting / finalizing the solicitation package

Involves a lengthy process of reviews Approximate RFP target due date

1st Quarter 2026 Pay close attention to sections “L&M”

They outline how you will be evaluated Reviewing received proposals

Another lengthy process Approximate target award date

March 2027

22Deliberate Excellence!

Acquisition Regs You Should Know!

Commonly used and applied FAR / DFARS / AFFARS clauses incorporated and enforced in the MACC:

Site Superintendence

Liquidated Damages

Option Years

Bonding & Insurance

Progress Payments

Unforeseen Conditions

23Deliberate Excellence!

Successful Document Submission Improper submission of required documents may lead your proposal to be omitted.

Perception can be impactful; a poorly written proposal may give the impression, accurate or not, your company has substandard workmanship.

The Government retains the right to enter into exchanges but does not anticipate doing so, as such you should submit your proposal with the best terms from a cost or price standpoint.

24Deliberate Excellence!

SBA Considerations You must be registered in SAM under NAICS 236220

If you are not currently registered, please reach out to the SAM Helpdesk If you are Teaming or a Joint Venture (JV), ensure your team or JV has the appropriate

NAICS

NAICS review time depends on the SBA matching your original document submission or needing additional documentation

Less complex cases with documents matching the requirements provided may be resolved in as few as five days, where other cases may take several weeks

For more information about small business questions, SBA pamphlets are available at the check-in table

The Small Business representative, Mr. Michael Terranova is walking around, also

25Deliberate Excellence!

While on break… Submit your questions

(Questions will be answered after lunch)

BREAK

26Deliberate Excellence!

CES Contract Overview

Major Elements of Contracts Engineering and Construction Services for Base

Facilities and Infrastructure

Private & DOD Installations Major Differences

Environmental and Regulatory Compliance

Desired Outcomes

27Deliberate Excellence!

What We Take Care Of

AIRFIELD

11,000 FT Runway 900,000+ SY Apron

PAVEMENTS

40+ Miles Roadway

ELECTRICAL

59 Miles of High Voltage Primary

Distribution

NATURAL

5,000+ acres

1,000+ Acres Wetlands

FACILITIES

600+

STORM WATER

400,000+ LF Pipe

WATERWAYS

2 Channels, 47 Docks

28Deliberate Excellence!

6 CES

We are the 6 CES The squadron is made up of six (6) flights Fire Department Explosive Ordinance Emergency Management Installation Management Operations Engineering

Provides maintenance / repair projects on over 671 facilities and infrastructure at MacDill AFB

29Deliberate Excellence!

What We Do

Programs and Engineering Services

In-House Design 35%, 100% (Explanation) Documentation Review (Process / Timelines) Inspection Engineering Support Computer Automated Drafting and Design (CADD) Environmental Management

30Deliberate Excellence!

Project Categories

(Pie chart)

HVAC, 19%

Electrical, 10%

Roofing, 19%

Civil - Pavement, 10%

Civil - Utilities/Non- Pavement, 18%

Partial/Full Renovation, 14%

Mechanical, 6%

Paint, 4%

31Deliberate Excellence!

Typical Systems

HVAC ROOFING PAVEMENT

CIVIL – NON-

PAVEMENT /

UTILITY /

STRUCTURAL

MECHANICAL

- Air Cooled Chillers

- Water Cooled Chillers

- CHW AHUs

- DX AHUs

- DX Split Systems

- DOAS Units

- Package Units

- Standing Seam Metal

- Modified Bitumen

- Asphalt Shingles

- Fabric/Metal

Canopies

- Cold Fluid

Applied Rubberized Emulsion

- Asphalt sp9.5/sp12.5

- Concrete 3K/4K psi

- Seal Coating

- Striping/Thermo-plastic

- Airfield

- Retention Ponds

- Boat Docks

- Bridges

- Piers

- Elevators

- Fire Suppression

Systems

32Deliberate Excellence!

Private vs. DOD Installations Military Focus: Mission Drives Projects

Government Regulations:

Unified Facilities Criteria (UFC) International Building Code (IBC) MacDill Design Guide Permitting

Location: Singular location for work / project effort

CES: One-stop shop offering a wide range of support

33Deliberate Excellence!

Unique Florida Considerations

Contractor Responsibility

Hurricanes (Tie downs and site security prior to / clean-up after)

Florida weather environment (Mold, moisture, humidity, air quality)

High Water Table (6 CES - could be unforeseen site condition)

Heat (Roofing projects / outside work - weather delay for heat)

Rain (Roofing projects)

Lightning rules on base (Stop work)

34Deliberate Excellence!

Base Environmental Compliance Conservation Pollution Prevention Hazardous Material Management Program Air Program Management Solid Waste Management Permits, Reports, and Applications Environmental Assessments Protected Species Installation Restoration Program (IRP) – not in contract

Coordination with IRP representatives / contractors required

35Deliberate Excellence!

Contractor Desired Outcomes

Projects delivered on time and on budget with quality results

Meet mission requirements by ensuring

Base utility and infrastructure systems are fully operational

Facilities fully operational

Energy consumption reduced annually

Flight line is available for operational mission

No environmental violations or regulatory actions against the base

Long-term, cohesive and dependable partnerships

36Deliberate Excellence!

Lunch Options & Networking TPA Main Lunch Options

P.F. Chang's

Wendy's

Starbucks Evenings

Starbucks

NewsLink

Tampa Life

The Runway/PGA Tour

Hard Rock Cafe

Tampa Bay Sports / Mindworks

Chick-fil-A

Ybor City News

It’s time to mingle!

Are there other attendees you would like to meet?

Stay and chat over lunch

Remember to send your questions to the QR Code below:

37Deliberate Excellence!

Contact Information

6CONS.PKC.MACC4@us.af.mil (for future inquiries)

38Deliberate Excellence!

Feedback QR Code

Slide Number 1
Slide Number 2
MacDill AFB at a Glance
“A Day in the Life”
Tenant Units Support
PROHIBITED ITEMS and CONDUCT
PROHIBITED ITEMS and CONDUCT
Visitor Pass Requirements
Tanker Way Information
Slide Number 10
Helping to Prevent Fraud
Meet Our Team
MACC 3.0
MACC 3.0
MACC 3.0
MACC 3.0 – Flow �(Solicitation to Task Order)
MACC 3.0 - Unique Elements
BREAK
Whole Team Approach
Tentative Details of MACC 4.0
What’s Next?
Acquisition Regs You Should Know!
Successful Document Submission
SBA Considerations
BREAK
CES Contract Overview
What We Take Care Of
6 CES
What We Do
Project Categories
Typical Systems
Private vs. DOD Installations
Unique Florida Considerations
Base Environmental Compliance
Contractor Desired Outcomes
Lunch Options & Networking
Contact Information
Feedback QR Code

File details come from the government source that posted it. Updated .