AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SEE PAGES 2 HEREIN FOR DETAILS

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M67861-16-T-0060

X 9B. DATED (SEE ITEM 11)

01-Sep-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Sep-2016

CODE

MARFORRES REGIONAL CONTRACTING OFFICE

MARCORSPTFAC

2000 OPELOUSAS AVE

NEW ORLEANS LA 70114

M67861 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

M67861-16-T-0060

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 22-Sep-2016 12:00 PM to 23-Sep-2016 12:00 PM.

The following have been added by full text:

AMENDMENT NO. 0001

The purpose of this amendment is as follows -

1. PWS is revised to incorporate the following:

a) Contractor shall add Conference Line and Jack, approximately 75 feet.

b) Contractor shall remove old system out of the Janitors closet, install New System in joint Navy and Marine Corps Computer Closet in Rm 122, extend cabling to run from the Navy / Marine Corps Telecomm Closet to Janitors closet.

c) Contractor shall extend the Loop Start lines from the Demarc to the New location to the New Telephone switch. ( Approximately 100 Feet total); contractor shall use a 10 pr indoor cable.

d) Contractor shall add a line and jack in RM 152.

e) Contractor shall add a line and jack for the Chiefs Room for a refrigerator alarm line (located next to the gym across Rm 170; see notes on map attachment).

f) Site photos and diagrams are hereby incorporated; see attachments (1) through (9).

2. Extend solicitation response date to September 23, 2016 at 12:00PM.

3. All other terms and conditions remain unchanged.

The following have been modified:

PERFORMANCE WORK STATEMENT

Marine Forces Reserve Communication Standards Based on Building Industry & National Electric Codes

Revised 8/19/15

Reference to BICSI Telecommunications Distribution Methods Manual Ninth Edition Year 2000 All material will be installed according to manufacture recommendations unless otherwise instructed by G6.

PERFORMANCE WORK STATEMENT (PWS)

PROJECT: (PLAINVILLE CT )

PWS is revised to incorporate the following:

a) Contractor shall add Conference Line and Jack, approximately 75 feet.

b) Contractor shall remove old system out of the Janitors closet, install New System in joint Navy and Marine Corps Computer Closet in Rm 122, extend cabling to run from the Navy / Marine Corps Telecomm Closet to Janitors closet.

c) Contractor shall extend the Loop Start lines from the Demarc to the New location to the New Telephone switch.

(Approximately 100 Feet total); contractor shall use a 10 pr indoor cable.

d) Contractor shall add a line and jack in RM 152.

e) Contractor shall add a line and jack for the Chiefs Room for a refrigerator alarm line (located next to the gym across Rm 170; see notes on map attachment).

f) Site photos and diagrams are hereby incorporated; see attachments (1) through (9).

1. Scope:

a. This Performance Work Statement (PWS) establishes and defines the requirements for the contractor to engineer, furnish, install, secure, test (EFIST), and the installation of an IP based voice solution. Contractor is to provide IP/digital voice capabilities for Engineer Service Company that is compatible with current infrastructure and fulfills the present and future telephony requirements.

INSPECTOR-INSTRUCTOR

2BN 25TH MAR REGIMENT FOX CO

1 LINSLEY DR

PLAINVILLE, CT 060602

SSGT HAYNES JOHN V 860-747-1644)

b. Company will install an Avaya IP Office telephone system or similar. The Telephone system MUST include the following attributes:

1) Auto Attendant

2) Expandability for future increase of users

3) Capability of multiple voicemail boxes

4) Storage capacity for voice mails

5) Support digital phones

6) Capability of remote access

7) Capability of internal and external paging

8) Support a PRI, T1, or analog lines

2. Project Manager: All required actions will come through the Government Project Manager. The Government Project Manager will be Gunnery Sergeant Brandon Widener 504-697-9797 brandon.widener@usmc.mil.

3. Contractor Project Manager: Company will provide a Project Manager (PM) within 5 days of award. PM duties shall include:

Project plan and Milestone schedule 5 days after contract is awarded.

Coordination for installation, hardware delivery, and inventory control with Government Project Manager.

Project status meeting within 5 days of award and then every 5 days until completion.

Project closure meeting once project is complete will be coordinated with Government Project Manager.

Manage change request.

Performance of work is executed within normal business practices.

Contractor Project Manager will coordinate all changes with Government Project Manager.

Contractor Project Manager will provide training on site.

Pictures will be taken of scope once all work has been completed and emailed to Government Project

Manager.

Once scope of work has been completed, Contractor Project Manager is required to contact Government

Project Manager to inform scope of work status is complete.

4. Schedule:

a. Installation date and scope of work should be completed no later than 30 days after the contract has been awarded. Cutover will be decided with the Government Project Manager and local site Government Representative’s input and will not impede mission accomplishment. However on a case by case basis, if an adjustment to the installation schedule needs to be arranged; coordination with the Government Project Manager is required and can only be approved by the Government Project Manager.

A. Solicitation Date – 01 September 2016 B. Site Visit Date : 13 September 2016 @ 1600

(Call Site POC for access and or GySgt Widener at 858-349-0220) C. Installation – Completed No Later Than 30 Days from Contract Award Date.

5. Meetings:

A. The contractor shall participate in scheduled on-site meetings, conference calls, present briefings, and provide progress overviews as indicated below. The contractor shall provide project documents and weekly project photos electronically to the Government.

6. Hardware installation requirements in accordance to normal business practices:

A. For ALL locations, the hardware (provided by vendor) installation includes:

1) Placement and testing of parts and connectivity.

2) Installation of all required wiring.

3) If telephone switch programming is being programmed or engineered offsite, during the test and tone requirement, the vendor will work directly with site POC in order to complete the required database workbook entries within four days of awarded.

4) The contractor shall test and Tone all voice terminal lines prior to installing the Telephone system, if terminals fail repair and/or replace any nonfunctional voice terminal jacks and or wiring.

5) All voice terminals must be in working order for the contract to be complete

6) Installation of the Telephone Switch (new equipment, not refurbished) from an Authorized Dealer with latest software and voicemail

7) Capability of remote access

8) Must include a Laptop computer; awardee shall install software prior to installation.

9) Remove old Telephone Switch and ALL obsolete wiring/blocks pack up for shipment with a listed inventory and give to the site point of contact

B. For Site Location:

1) 23 mail boxes with 15 minutes of voicemail storage per user

2) UPS with 4 hours of backup power

3) 23 1416 Avaya Digital Telephones or equal (must be compatible with new telephone system provided by awardee). This quantity is for future expansion.

4) Support 10 or less POTS

5) Support 4 LOOP start Lines

6) Provide the gear and the capability for 1 Conference room with or similar to the AVAYA B159 and

B100 Expansion Micro phones.

7) Contractor, COR and Local customer will work with local exchange carrier (LEC) and ensure that the

LOOP start lines are operational with the Telephone system as an out route for local and long distance telephone system capabilities, contract awardee will ensure that the hunt group is operational with the new Telephone System prior to telephone system changeover.

7. Site Specific requirements: The contractor shall test and tone prior to installation, Contractor will test and tone each and all extensions and Central office wiring with the results provided to the Government in a final engineering report due upon completion of the installation. All jacks in the field will be labeled to their corresponding port with in the room and on the patch panel within the communication closet. Pictures of every jack labeled in the field will be submitted as part of the closing documents and is a requirement of this performance work statement. The contractor will be responsible for using existing wiring. The New system will tie into a patch panel from the switch module and everything will be extended to the 66 OR 110 blocks ensuring that everything is labeled, Reroute wiring to patch panels so that the wiring and connections can be easily identified and better organized. ALL obsolete wiring/blocks shall be packed up by the awardee for shipment with a listed inventory and given to the site point of contact During the Solicitation Site Survey (SSS), the contractor shall evaluate the AC and DC power systems at all locations where work is being performed ensuring system will have ample power to operate the new telephone system.

A. THE CONTRACTOR SHALL REPAIR AND/OR REPLACE ANY

NONFUNCTIONAL VOICE TERMINAL JACKS AND OR WIRING. ALL

VOICE TERMINALS MUST BE IN WORKING ORDER FOR THE CONTRACT

TO BE COMPLETE.

B. The contractor shall use the existing main AC power service panel or sub-panels to the maximum extent possible. All new main telecommunication service panels shall be 120/208 VAC, three-phase system, dedicated feeder line, 5-wire, protective “green” wire ground from the main disconnect with a capacity to support all requirements with 25% spare breaker positions. Sub-panels shall be approved by the Government and shall be 120/240 VAC, single phase panels or 120/208 VAC, three-phase panels. A surge protection device shall be provided at the main telecommunications power panel to suppress lightning-induced voltage and current surges within the AC electrical distribution system. The surge suppressor shall be mounted directly beside its serving breaker.

C. The contractor shall provide formal training for all new systems provided under this PWS. The contractor shall prepare and provide a final Training Plan to include course descriptions, syllabuses, and training schedules NLT fifteen (15) calendar days prior to the planned commencement of training. The contractor shall provide manufacturer certified courses for all operation and maintenance. On-site training is preferred.

The contractor shall provide all necessary materials, documentation, manuals, and training aids. Training material shall be provided in hard and soft copies at the commencement of the training. At least one person shall be fully trained prior to cutover, and all training shall complete prior to project close out.

D. The contractor shall provide a detailed list of materials (including type and amount) of inside cable plant

MATERIALS USED (E.G., RACKS, CABLE LADDERS, JHOOKS, JACKS,

FACEPLATES, AND FEET OF CABLE) INSURING THAT IT IS WITHIN THE

PROVIDED REPORT. The final Engineering Report shall include a complete building floor plan with all station locations, to include red line drawing of cable pathways.

E. The contractor shall provide a full, unlimited Three year warranty for all contractor provided hardware/software, materials, and workmanship, which shall not begin until final Government acceptance of all items delivered under this PWS. The warranty period shall begin after all discrepancies have been cleared and the continuous thirty (30) day Break-in of all systems delivered under this PWS. All discrepancies shall be corrected before the break-in period can begin or be restarted. The warranty shall include emergency off-site technical assistance for remote diagnostics and troubleshooting for the first full year. The contractor shall track and resolve the problem(s) in accordance with standard commercial practices. The contractor shall provide a Warranty Procedure Guide that includes phone numbers and addresses for repair and return, phone numbers for requesting remote diagnostics, and specific procedures for obtaining these services. The contractor shall also provide phone numbers, addresses and procedures for obtaining emergency replacement parts and an address for returning the defective items. It is expected that this information will be valid during the warranty and for life cycle support after the warranty has expired the contractor shall provide the Warranty Procedure Guide on each system delivered under this PWS before commencement of the thirty (30) day break-in.

F. (FOR CISCO PRODUCTS) Contractor shall complete Option CLINs 0002 through 0005 with any annual (recurring) costs associated with the software, switch and Telephone licensing. In order to minimize the risk of the Government purchasing counterfeit products or unauthorized secondary market equipment, which would not be supported by the Original Equipment Manufacturer (OEM), and to ensure that the Government purchases only equipment that is genuine (i.e., not counterfeit or gray market), authorized (e.g., including appropriate licenses), and supported (e.g., warranty and support services) by the OEM, Offeror shall certify that it is a Manufacturer Authorized Partner as of the date of the submission of their offer, and that it has the certification/specialization level required by the Manufacturer to support both the product sale and product pricing, in accordance with the applicable Manufacturer certification/specialization requirements. Unless otherwise specified, Offeror shall warrant that the products are new, in their original box. By submitting a response to an Request for Quote (RFQ), Request for Proposal (RFP), the Offeror confirms to have sourced all Manufacturer products submitted in this offer from Manufacturer or through Manufacturer Authorized Partners only, in accordance with Manufacturer's applicable policies in effect at the time of purchase. Offeror shall provide Buyer with a copy of the End User license agreement, and shall warrant that all Manufacturer software is licensed originally to Buyer as the original licensee authorized to use the Manufacturer Software.

G. (FOR AVAYA PRODUCTS) Company must be authorized by Avaya to market and sell to the Federal Government.

8. Final Systems Acceptance:

A. The contractor shall notify the Government upon completion of all tasks under this PWS. Final inspection and acceptance is the responsibility of the Contracting Officer’s Representative (COR). Acceptable performance is achieved when all hardware, software, components, and equipment have been provided;

installation, integration, testing, demonstration, and preventative maintenance is completed; the system has run successfully and consecutively for thirty (30) calendar days without interruption, faults or downtime;

and all training is completed. Inspection or testing of services rendered which are conducted by the COR and the local site coordinator prior to final delivery and that does not uncover defects or other failures, this does not relieve the contractor from the responsibility for correcting those defects or other failures to meet contract requirements. The Government will provide formal acknowledgement that all terms of the task order have been accepted.

9. Discrepancies:

A. The Government reserves the right to refuse final acceptance until all discrepancies have been satisfactorily resolved. The contractor shall prepare a project discrepancy list, report detected issues during meetings, and track all discrepancies until resolved. The Government shall review and monitor all discrepancies and deliverables. The discrepancy list shall include any problem(s) detected or identified during system testing or inspections that were conducted by either the contractor or Government, or both. The contractor shall retain a history of discrepancies. Problems identified at any time during the course of this project shall be documented, provided to the Government, and corrected prior to final acceptance.

10. Software Engineering:

A. Provide basic system translations for trunking, network routing and video endpoint translation.

B. Software or switch access shall be provided on-site, only; no outside access will be permitted.

C. Ensure unit has passwords to change settings, and annotate the password on the outside of the telephone switch.

D. Ensure Government Project Managers have unit passwords to change settings.

E. Ensure attendant greetings do not contain spoken names, only billets.

11. Quality Assurance:

A. This section identifies the method of the Government’s Quality Assurance Personnel (QAP) will use to verify the quality of the contractor’s performance.

B. Re-performance of unacceptable services at no additional cost is the preferred course of action when appropriate.

C. If adverse conditions or other factors beyond the Contractor’s control are the cause for failure to meet contract specifications, no remedy will be assessed against the Contractor for failure to perform provided each incidence is documented by the Contractor and submitted to the Contracting Officer Representative (COR) for approval by the Contracting Officer. If the parties do not agree that the cause is due to factors beyond the Contractor’s control, the Contractor may proceed with a dispute under the contract’s FAR Clause 52.212-4.

D. Government COR shall be notified on progress of installation/repairs in order to allow COR to schedule to witness work at the site.

E. FAILURE TO INSPECT. If the Contractor fails to notify the COR that the work is ready for inspection, or the Contractor fails to attend an inspection after notification, then the COR may conduct an inspection at his/her own convenience, and his/her findings shall be considered as if they had been mutually agreed upon in a joint inspection, and the Contractor will be considered to have chosen not to correct any deficiencies.

See the paragraph entitled “Government Remedies” below for the consequences of this situation.

F. GOVERNMENT REMEDIES. The Contracting Officer will follow the Service Delivery Summary below, FAR 52.212-4, Contract Terms and Conditions-Commercial Items and 52.246-4 Inspection of Services, for Contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

G. Service Delivery Summary. The Contractor service requirements are summarized into performance objectives that relate directly to required performance items in the table below. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement.

12. Payment:

Payment shall be made via WAWF (Wide Area Work Flow) electronic invoicing system.

13. Site Survey & Questioning:

Contact number for the day of the site survey is 504-697-9797 or 858-349-0220. AFTER THE SITE SURVEY, ALL QUESTIONS ARE TO BE DIRECTED TO THE REGIONAL CONTRACTING OFFICE AT THE

FOLLOWING EMAIL ADDRESS: tammy.crump@usmc.mil .

14. SAFETY GUIDANCE

Contractors shall adhere to all relevant safety guidance, including (but not limited to):

(a) EM 385-1-1 – U.S. Army Corps of Engineers Safety and Health Requirements Manual

(b) OPNAVINST 5100.23 (series), Navy Occupational Health and Safety Program Manual

(c) MCO 5100.29 (series), Marine Corps Safety Program

(d) MCO 5100.8, Marine Corps Occupational Safety and Health (OSH) Policy Order

(e) NAVMC DIR 5100.8, MARCOR OSH Program Manual

Contracting Officer’s Representatives shall immediately report accidents/injuries sustained during contract performance to the Contracting Officer so that the Contracting Officer may report said accidents/injuries to responsible agency safety officials.

Performance Objective PBWS Reference

Performance Threshold

Remedy for Failure to Achieve Performance Threshold

All installations are performed in accordance with the Performance Work Statement.

6 Zero tolerance threshold for failure perform.

Re-performance of service at no additional cost to the Government.

15. CONTRACTOR REPORTING OF LABOR HOURS

Pursuant to NMCARS 5237.102(90), the contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Technology Services Organization via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) S, Utilities ONLY;

(5) V, Freight and Shipping ONLY.

The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.

(End of Summary of Changes)