Attachment_3_GRSP_QASP.doc
DOC document 44 KB Posted
- Attached to
- Ground Range Sustainment Program Federal contract opportunity
- Solicitation number
- M67854-15-R-7818
- Issued by
- United States Marine Corps
About this file
Attachment 3 GRSP QASP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 15-R-7818_combined_solicitation_and_synopsis_amend_01.doc | DOC document | |
| Attachment_6b_WD_05-2393_Rev-17_Onslow_NC_CLNC_7.8.2015.pdf | ||
| Attachment_1_GRSP_PWS.docx | DOCX document | |
| 15-R-7818_combined_solicitation_and_synopsis.doc | DOC document | |
| Attachment_4_GRSP_FY_15_CDRLs_.docx | DOCX document | |
| Attachment_5_Sole_Source_Justification_for_Simplified_Aquisition_redacted.doc | DOC document | |
| Attachment_6c_WD_05-2473_Rev-18_Beaufort_SC_7.8.2015.pdf | ||
| Attachment_6a_WD_05-2057_Rev-17_San_Diego_CA_CPCA_7.8.2015.pdf | ||
| Attachment_2_GRSP_SPEC_1.2.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3
QUALITY ASSURANCE SURVEILLANCE PLAN
1. Objective. This Quality Assurance Surveillance Plan (QASP) serves as the principal basis for assessing overall performance quality associated with this effort. This document will be used by the Government to assess the effectiveness of the Contractor’s management and technical services. This QASP provides the methodology by which the Contractor's performance will be monitored to determine compliance with established performance objectives and to establish performance benchmarks that ensure a quantifiable basis for measuring effectiveness. The plan is designed so that surveillance is limited to that which is necessary to verify the Contractor is performing management and technical services satisfactorily and relates directly to performance of the objectives delineated in the PWS.
2. Government Surveillance. The Government will identify an individual to function as the Contracting Officer’s Representative (COR) for this task, and the COR’s authority will be limited to administering specific technical aspects of the contract. The COR will not provide direction that is outside the scope of responsibilities delineated under this task order. The designated individual will:
· Maintain a detailed knowledge of the technical requirements of the contract
· Document Contractor performance in accordance with the QASP
· Identify and immediately forward notifications of deficient, or non-compliant performance to the Contracting Officer
· Approve priorities of support, resources, and associated schedules
3. Surveillance Methods. Surveillance of Contractor performance is the method used by the COR to determine whether the Contractor is effectively and efficiently complying with all terms and conditions of the task order. In addition to statistical analysis, the functional expertise of the COR plays a critical role in adequately evaluating Contractor performance. The below listed methods of surveillance shall be used in the administration of this QASP and the standards are delineated by the Performance Requirements Summary (PRS) Table 1 below.
| Performance Objective |
| Document |
| Performance Standards |
| Acceptable Quality Levels (AQLs) |
| Method of Surveillance |
| Moving Personnel Target |
| PWS/PSPEC 3.2 |
| -System is operational and stable |
-MPT turns 360 on its own radius.
| 100% |
| Test- GFI |
| Lightweight Non Live Fire Structure |
| PWS/PSPEC 3.3 |
| -System meets Specification requirements |
-Will be able to withstand SESAMS with no permanent damage to the panel.
| 95% |
| Test- GFI |
| Fighting hole cover |
| PWS/PSPEC 3.4 |
| -System meets Specification requirements and fits properly |
-No debris or water will enter the fighting hole with cover in place.
| 95% |
| Test- GFI |
| Target Turning System |
| PWS/PSPEC 3.5 |
| -System is operational |
-Target will turn 90 degrees on vertical axis.
98%
Test- GFI
| Bleachers |
| PWS/PSPEC 3.6 |
| -System meets Specification requirements |
- Bleachers are assembled per manufacturer’s instructions
-Bleachers are sturdy with no loose beams or screws.
| 100% |
| Observation |
| SESAMS kits |
| PWS/PSPEC 3.7 |
| - System meets Specification requirements and fit existing weapon |
-Parts are compatible and interoperable with existing weapons to fire SESAMS.
| 95% |
| Test- GFI |
| 12 lanes of the Pistol Range are fully operational |
| PWS/PSPEC 4 |
| - System is operational |
-Parts are compatible and interoperable with existing Meggitt ATO 3000 Pistol Range Target System.
98%
95% Test- GFI
| Integrated Master Schedule |
| PWS 5.2 |
| The IMS lists all critical path for all deliveries. |
| 100% |
| Observation |
| Requirements Traceability Matrix(RTM) |
| PWS 5.3 |
| The RTM captures all requirements listed from the PWS and SPEC |
| 100% |
| Observation |
| Safety Assessment Report |
| PWS 6.1.1.1 |
| SARs completed and passes the Safety Review Board |
| 100% |
| SRB Acceptance |
| Lithium Battery Safety Assessment |
| PWS 6.1.2.1 |
| All aspects Lithium Battery Safety Report documented and submitted. |
| 100% |
| Accepted by MARCOR SYSCOM safety |
| RF Spectrum Requirements |
| PWS 6.2 |
| All radio device compliant with FCCPart 15, and have a valid JF12 or file an EL-CID. |
| 100% |
| Documentation |
| Integrated Logistical Support |
| PWS 7 |
| - all COTS manuals and associated supplemental data provided |
- all training manuals provided
| 100% |
| Observation |
| New Equipment Training |
| PWS 7.2.3 |
| -NET Training completed and provided to designated operator and maintainers |
| 100% |
| Observation |
File details come from the government source that posted it. Updated .