This service report and related federal contract opportunity document outline maintenance and repair services performed on two Liebert 750KVA uninterruptible power supply (UPS) systems located at a Marine Corps facility in Okinawa, Japan. Key details include: ESM Engineers was contracted to conduct emergency repairs, replacing faulty parts like fans, capacitors, and power supplies. Batteries also need installation. The federal contract opportunity M6740020Q0087 seeks offers for UPS removal and replacement services at the same Marine Corps facility, with attachments available via the DoD SAFE file transfer system upon request. The summary provides an overview of both maintenance work completed and upcoming contract work sought.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| M6740020Q0087 Amendment 3.pdf | ||
| Solicitation M6740020Q0087 Amendment questions and answers.pdf | ||
| M6740020Q0087 Amendment 1.docx | DOCX document | |
| Attachment_3_Electrical_floor_plan_CROP.pdf | ||
| Attachment_1_480_UPS_Removal_and_replacement.xlsx | XLSX spreadsheet | |
| Attachment_6_Feeder_Schedule.pdf | ||
| M6740020Q0087.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POC: Jeff Stinson Facility Operations Specialist/Data Center Facility Manager MCIPAC G-6 Camp S.D. Butler Okinawa, Japan JPN Cellular: 080-8592-9517GFE Mobile: (724) 496-2301 Report Reviewed By: Bryant Colino, P.E.
ESM Engineers
Preventive Maintenance & Service Report
Liebert 750 KVA UPS:
(2) UDA63750A36AD50
ESM SERVICE REPORT
EXECUTIVE SUMMARY
ESM Engineers was selected as the service contractor to perform emergency repairs of two discontinued Liebert AP600 750KVA UPS systems. Initial inspection found UPS A online with a fan/failure alarm and UPS B offline, in bypass, due to a Hardware Shutdown fault and associated alarms. Prior to service, ESM reviewed the history files of both UPS systems’ logs which date back to August 2017.
UPS B – ESM identified a bad power supply with +24 VDC signal out of tolerance, control signals which were out of calibration, and the output filter amperage readings were unbalanced with a delta of 90 amps. 60% of the AC capacitors were replaced and all critical control power voltages we calibrated to manufacturer’s specifications. Upon completion of service, ESM identified a noisy failing blower fan on UPS B due to bearings; to avoid loud rubbing, and inevitable equipment failure, ESM bypassed the blower fan. This was possible due to the minimal load on UPS B and proper cooling in the space.
UPS A – ESM identified a blown inverter fan and blown fuse on the fuse monitor board, out of calibration control signals. The output filter amperage readings were unbalanced with a delta of 60 amps due to open AC capacitors. Several DC capacitors were leaking and contributed to unbalanced amperage readings. A full DC cap changeout was performed to improve equipment reliability and avoid future fault transfers to bypass.
60% of the AC Capacitors in the output filter assembly were replaced, and the DC control power voltages were calibrated to manufacturer’s specifications. Upon completion of service, UPS A was left online with no active alarms.
Both systems have (2) cabinets of (40) Deka Unigy 31HR5000 batteries. The system was designed with (5) battery cabinets per UPS. ESM has been notified the batteries have been ordered and will need to be installed. It is imperative that the new batteries be installed per manufacturer recommendations for equipment to perform at optimum levels; ESM would be happy to assist you with the installation.
ESM organized and itemized the existing parts found onsite (Attachment 1) and provided a recommended parts list as requested (Attachment 2). It is our mission to maintain 100% equipment reliability with proactive refurbishments and proper preventative maintenance.
As a professional courtesy we have included instruction to transfer the UPS off internal bypass in the unlikely event of a transfer to bypass. If you do not feel comfortable operating the equipment, please feel free to give us a call. Our goal is to be the firm you come to for all UPS needs.
Preventative Maintenance Values
Date: 10/24/2019
Camp Foster Kitamae, Building 480, Data Center
Chatan Cho Okinawa, JP 904-0117
UPS A
INPUT
Phase L-L Volts L-N Volts Amps
A 477 275 133 B 477 275 121 C 479 277 130
BYPASS
Phase L-L Volts L-N Volts Amps
A 477 275 0 B 476 275 0 C 479 277 0
OUTPUT
Phase L-L Volts L-N Volts Amps
A 483 279 79 B 482 278 81 C 482 278 85
LOAD
Phase KW KVA %
A 18 22 8.81% B 18 23 9.02% C 19 24 9.46%
BATTERY
Voltage Charge Runtime
540 98% N/A
NOTES:
UPS A was left online – All parts were replaced, no active alarms present.
12.9
13.1
13.2
13.3
13.4
13.5
13.6
13.7
13.8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
UPS A Battery Cabinet # 1
Camp Foster Kitamae, Building 480, Data Center
Chatan Cho Okinawa, JP 904-0117
Battery Model Number: DEKA 31HR5000 Date Code: 09/2017 DC BUS Voltage: 540 VDC
13.1
13.2
13.3
13.4
13.5
13.6
13.7
13.8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
UPS A Battery Cabinet # 2
Camp Foster Kitamae, Building 480, Data Center
Battery Model Number: DEKA 31HR5000 Date Code: 09/2017 DC BUS Voltage: 540 VDC
Preventative Maintenance Values Date: 10/24/2019
Camp Foster Kitamae, Building 480, Data Center
Chatan Cho Okinawa, JP 904-0117
UPS B
INPUT
Phase L-L Volts L-N Volts Amps
A 478 276 116 B 475 274 111 C 478 276 112
BYPASS
Phase L-L Volts L-N Volts Amps
A 478 276 0 B 476 275 0 C 479 277 0
OUTPUT
Phase L-L Volts L-N Volts Amps
A 482 279 77 B 480 277 73 C 483 279 82
LOAD
Phase KW KVA %
A 17 21 8.57% B 16 20 8.09% C 18 23 9.15%
BATTERY
Voltage Charge Runtime
541 98% N/A
NOTES:
UPS B was left online with a blower fan bypassed. No further issues to report.
13.25
13.3
13.35
13.4
13.45
13.5
13.55
13.6
13.65
13.7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
UPS B Battery Cabinet # 1
Camp Foster Kitamae, Building 480, Data Center
Battery Model Number: DEKA 31HR5000 Date Code: 9/2017 DC BUS Voltage: 540 VDC
13.2
13.3
13.4
13.5
13.6
13.7
13.8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
UPS B Battery Cabinet # 2
Camp Foster Kitamae, Building 480, Data Center
Battery Model Number: DEKA 31HR5000 Date Code: 9/2017 DC BUS Voltage: 540 VDC
ATTACHMENT 1
ON-HAND PARTS LIST
DESCRIPTION PART NUMBER QNTY DETAILS
POWER SUPPLY 02-790843-00; P/L 6, REV 3 USED - +24VDC out of tolerance - found @20.66
02-790843-00 USED - 4/19 (original Power Supply)
DC REGULATOR BOARD 02-790879-00; P/L 8, REV 1 --
02-790821-10; P/L 11, REV 3 DATE 11/2001
INTERFACE ASSY 02-790831-69; P/L 2, REV 2 DATE 07/2002
03-790831-57; P/L 0, REV 0 DATE 12/2002
IGBT GATE DRIVER 02-791970-07; P/L 6, REV 10 DATE 09/2003
02-791970-07; P/L 1, REV 7 DATE 05/1999
FAN FUSE MONITOR ASSEMBLY 02-791946-02; P/L 4, REV 3 DATE 06/2001
02-791946-03; P/L 4, REV 3 DATE 09/2003
LOGIC BOARD 02-790811-69; P/L 4, REV 6 1 DATE 09/2003
GATE DRIVE STATIC SWITCH 02-790802-00; P/L 2, REV C 1 DATE 08/2003
V&I CONDITIONER 02-790889-03; P/L 1. REV 4 1 DATE 09/2003
FUSE MONITOR BOARD 02-790875-15; P/L 2, REV 1 1 DATE 09/2003
TRANSFER RELAY 02-790858-00; P/L 1, REV 2 1 DATE 10/2003
DC SENSOR ASSEMBLY 02-790886-00; P/L 5, REV 2 1 DATE 09/2003
DC FUSE MONITOR BOARD 02-790875-40; P/L 3, REV 2 1 DATE 10/2003
PWA RLI 02-790868-00; P/L 2, REV A 1 DATE 09/2003
IFM 12-749043-10 USED
12-749043-16 USED
SNUBBER BOARD 02-779857-23; P/L 2, REV 4 1 DATE 07/2003
SUBER RECTIFIER 02-790743-76; P/L 4, REV 3 1 DATE 10/2003
INVERTER FANS 12-796524-01L 3 NEW
FAN AXIAL 12-714150-00 8 NEW
AC CAPACITORS 12-817416-00 40 NEW
DC TRAP ASSEMBLIES 02-796340-50 3 NEW
630A-700V 170M4416 3 TESTED
500A-700V 170M3672 2 TESTED
315A-700V 170M1472 13 TESTED
60A-500V FWH-600A 5 TESTED
12-749351-05 1 NEW
12-79351-05 1 NEW
2A 12749437-00 1 NEW
ON-HAND FUSES
ON-HAND PARTS
ATTACHMENT 2
RECOMMENDED PARTS LIST
RECOMMENDED PARTS
DESCRIPTION PART NUMBER QNTY DETAILS
BLOWER FANS 12-776825-20 3 (1) WILL REPLACE BAD FAN FOUND IN UPS B
INVERTER FANS 12-796524-01L 8 RECOMMENDED TO HAVE ON-HAND
AIR-FILTER 11.8 X 26.3 X 1 6 BOX OF AIR FILTERS
Maintenance Bypass Load Transfers
Upon future transfers to bypass due to a fault in the system it is recommended to manually transfer the load between UPS internal bypass and Maintenance Bypass. Do not transfer the load between Maintenance Bypass and the UPS system (module inverters) output if no UPS has no active faults.
If the load is on internal UPS Bypass, transferring to maintenance bypass:
a) If the maintenance bypass cabinet or switchboard has an optional 2-key interlock system,
b) press the button on the maintenance bypass cabinet to remove the key from the solenoid.
c) If using a key interlock system, insert the key into the lock for the Maintenance Bypass
d) Breaker (MBB) to enable it to be closed.
e) Close the Maintenance Bypass Breaker (MBB).
f) Verify closure of the MBB.
a. Verify load has been reduced to ½.
g) Open the Maintenance Isolation Breaker (MIB). The UPS
h) system is now isolated from the critical load and the load is now on Maintenance
i) Bypass.
j) If using a key interlock system, remove the key from the lock for the Maintenance Isolation
k) Breaker (MIB) to lock it open.
l) If the maintenance bypass cabinet or switchboard has an optional 2-key interlock system,
m) replace the key into the solenoid.
n) If UPS bypass shutdown is required, open the Bypass Input Breaker (BIB).
If the load is on Maintenance Bypass, returning to UPS bypass:
a) Close the Bypass Input Breaker (BIB) or verify BIB is closed. Note that UPS System Bypass
b) circuit breaker (motorized) must also be closed. Refer to 3.4.1 - SCC Start-Up Procedure.
c) If the maintenance bypass cabinet or switchboard has an optional 2-key interlock system,
d) press the button on the maintenance bypass cabinet to remove the key from the solenoid.
e) If using a key interlock system, insert the key into the lock for the Maintenance Isolation
f) Breaker (MIB) to enable it to be closed.
g) Close the Maintenance Isolation Breaker (MIB).
h) Verify closure of the MIB.
a. Verify load is on the system prior to proceeding to next step.
i) Then open the Maintenance Bypass Breaker (MBB). Load is now
j) on UPS Internal Bypass.
a. Verify load has doubled by opening the MBB.
k) If using a key interlock system, remove the key from the lock for the Maintenance Bypass
l) Breaker (MBB) to lock it open.
m) If the maintenance bypass cabinet or switchboard has an optional 2-key interlock system,
n) replace the key into the solenoid.
! CAUTION
Make sure you understand the proper sequence before operating any circuit breaker.
Operating a Maintenance Bypass circuit breaker out of sequence could cut off power to the critical load.
! CAUTION
The UPS system (SCC) must be on internal bypass before performing the following procedures and operating MIB or MBB or damage to the UPS may occur and the critical load may be lost.
NOTE
If the maintenance bypass cabinet or switchboard has any other type of custom interlock, follow the specific instructions for that interlock system to remove the key.