IDLMS Basic Ordering Agreement RFP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| M6700419R0007_Questions_and_Answers.docx | DOCX document | |
| Wage_Determination_15-4539.txt | TXT text file | |
| M6700419R0007_Questions_and_Answers.docx | DOCX document | |
| M6700419R0007_Questions_and_Answers.docx | DOCX document | |
| M6700419R0007_Site_Vist_12-17-18_MFR.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
M6700419R0007 15-Dec-2018
b. TELEPHONE NUMBER
904-696-4812
8. OFFER DUE DATE/LOCAL TIME
04:00 PM 28 Dec 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
M670049. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
STANLEY G. SANDERS JR
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USMC BLOUNT ISLAND COMMAND
ATTN: STANLEY SANDERS
5880 CHANNEL VIEW BLVD
JACKSONVILLE FL 32226
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
904-696-4802FAX:
TEL: 904-696-4812
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,250
NAICS:
336611
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF44
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
M6700419R0007
Section SF 1449 - CONTINUATION SHEET
BASIC ORDERING AGREEMENT ARTIC
PREAMBLE
This Basic Ordering Agreement (BOA) is entered into this [DATE], by the United States of America (the
“Government”) represented by Calvin Caldwell, the Contracting Officer, and [COMPANY NAME], a corporation organized and existing under the laws of the State of Florida (the “Contractor”).
BASIC ORDERING AGREEMENT
BETWEEN
[COMPANY NAME]
AND
Blount Island Command, Jacksonville, Florida 32226
BASIC ORDERING AGREEMENT NUMBER M6700419G1000
This Basic Ordering Agreement (BOA) between [COMPANY NAME] hereinafter referred to by its company name or as “Contractor” and Blount Island Command hereinafter referred to as “BIC” is entered into to provide various Intermediate and Depot Navy craft and Equipment repairs.
This Agreement includes Navy craft repair work within the scope of NAICS 336611.
1. This BOA is for the Blount Island Command, Jacksonville, Florida 32226 and the USMC
Prepositioning Program.
2. This Agreement may not be used by other federal organizations.
3. The pricing of all orders shall be in accordance with prevailing competitive market prices and/or as set forth in Article V, whichever provides the better value to the Government.
4. Federal and Defense Federal Acquisition Regulations (FAR/DFARS) for commercial services are included and made a part herein.
Now, THEREFORE, the Parties do mutually agree as follows:
ARTICLE I – TYPE OF AGREEMENT AND OPERATION
This is a Basic Ordering Agreement between Blount Island Command and [COMPANY NAME] to obtain future repairs and maintenance of Navy Craft and associated technical writing. Orders arising from this BOA will be sequentially numbered and will contain, at a minimum the following:
. Identification of the work project/requirement.
. Specifications/part numbers of commercial equipment.
. Statement of Work for all applicable service work.
. Delivery or performance period, inclusive of options.
. Total Price.
. Identification of the type of labor category required to perform a service, as applicable.
Any order may be modified to include terms and conditions that are only applicable to that particular order. These are not to be considered as modifications or amendments to this BOA. Separate BOA modifications will be issued to modify the terms and conditions set forth herein.
Issuance of orders to the Contractor for various repairs and maintenance of Navy Craft is wholly within the discretion of Blount Island Command and nothing herein shall be construed to require Blount Island
Command to use, i.e. place orders under, this Basic Ordering Agreement.
Blount Island Command does not guarantee any minimum usage of purchases or services provided under this BOA. Blount Island Command reserves the right to terminate the delivery or performance period of any order at any time when it is deemed to be in the best interests of the Government.
ARTICLE II - PERIOD OF PERFORMANCE
This BOA is effective from the date of award and will continue for a total period of five (5) years, unless sooner terminated or extended by written agreement of the parties. The parties agree that each has the right to terminate the BOA, at no cost to the other party, with thirty days advance written notice. The parties further agree that the Contracting Officer of Blount Island Command has the unilateral right, with thirty days advance written notice, to extend the period of performance for up to one additional six month period. Orders may include periods of delivery or performance that extend beyond the expiration date of the BOA. The BOA terms and conditions shall remain in effect for those orders until they have been completed and closed.
ARTICLE III - SCOPE OF WORK
The Contractor agrees to comply with the resultant established statements of work to provide the commercial services under this BOA. All Orders placed hereunder shall reference the number of this
BOA (Agreement No. M6700418G1000) and specific Order number as required. The term of this BOA is five years from the effective date of this BOA or until the maximum purchasing limitation of
$5,000,000.00 has been reached, whichever occurs first. The effective date of the BOA shall be the date of award.
As applicable, all resultant service orders shall be based upon the statement of work and in accordance with commercial industry standards.
The Contractor agrees to furnish such quantities of services and items as Blount Island Command may order during the term of this Agreement. The Contractors’ obligation to Blount Island Command shall become effective upon acceptance of a particular order issued under the Agreement.
An order becomes a binding contract upon issuance of the order by the Government and the contractor’s failure to reject the order in writing within five (5) calendar days. All rejections of orders by the
Contractor are to be made in writing to the Contracting Officer.
ARTICLE IV - DELIVERY/PAYMENT
The work specified in Article III shall be completed and delivered as follows:
F.O.B. Point (point of delivery): Destination unless stated otherwise in the Order.
As applicable, delivery location and schedule shall be negotiated and specified for each Order under this
BOA. The Government shall pay the Contactor the negotiated price for each order upon delivery and/or completion of the service per the terms and conditions of this BOA and each subsequent Order.
ARTICLE V - FIXED PRICES – LABOR AND INDIRECT RATES
Blount Island Command shall be entitled to commercial industry standard Navy craft repairs services based upon the non-burdened hourly rates contained in Attachment One.
The Contractor shall include a detailed list of all other rates in the table contained in Attachment One.
The Government will incorporate the offerors attachment one rates into the Master BOA and issue orders based upon negotiated firm fixed priced orders.
The Government intends to use a job order process for each order issued under this BOA. Each Job order will be issued with a SOW. The contractor shall provide a quote for the SOW and upon review by the
Government, approval will be provided in writing for the contractor to proceed. All job orders will be negotiated as required. Multiple job orders may issue under a single order and will be within the scope of that order.
In addition, it is anticipated that additional repair work will be identified once the watercraft repairs are started. The contractor shall identify all damage requiring repair to the Government via Condition Found
Report (CFR). The Government shall issue a job order with a separate SOW and request an estimate for the repair work. Once the contractor estimate is received and evaluated, a firm fixed price effort will be negotiated and job order approval will be provided by the Contracting Officer for the repair.
ARTICLE VI- PRICING METHODOLOGY TO DETERMINE FAIR AND REASONABLENESS
The contractor’s established hourly rates of this BOA shall be verified for its continued fair and reasonableness against the prevailing market prices for similar work and under similar conditions before the issuance of all resultant orders.
ARTICLE VII – TECHNICAL, PROCUREMENT, AND ADMINISTRATIVE
REPRESENTATIVES
Blount Island Command’s BOA Procurement Representatives are:
Patricia Solberg, Contracting Officer, patricia.solberg@usmc.mil (904) 696-5170.
Calvin Caldwell, Contracting Officer, calvin.caldwell@usmc.mil (904) 696-
Stanley Sanders, Contract Specialist, stanley.sanders@usmc.mil (904) 696-4812.
Blount Island Command’s Technical Representatives are:
William Fish, Navy Branch Head, william.fish@usmc.mil, (904) 696-5229
Terry Cunningham, Quality Assurance Specialist, merrill.Cunningham@usmc.mil
Jared Gross, Contractor, Planner/Estimator, victor.Gross.Ctr@usmc.mil
[CONTRACTOR] BOA Administrative Representative is:
(Name):
(Office):
(Fax):
(Email):
ARTICLE VIII –WARRANTIES
Original Equipment Manufacturers (OEM) warranty applies for any products procured under this contract. The contractor does not give or imply warranty on any products it distributes.
Notwithstanding inspection and acceptance by the Government or any provision concerning the conclusiveness thereof, the Contractor warrants that all services performed under this contract will, at the time of acceptance, be free from defects in workmanship and conform to the requirements of this contract.
A Government Official shall give written notice of any defect or nonconformance to the Contractor within 30 days from the date of acceptance by the Government," or other specified event whose occurrence will terminate the period of notice, or combination of any applicable events or period of time.
This notice shall state either (1) that the Contractor shall correct or re-perform any defective or nonconforming services, or (2) that the Government does not require correction or re-performance.
mailto:patricia.solberg@usmc.mil mailto:calvin.caldwell@usmc.mil mailto:stanley.sanders@usmc.mil mailto:william.fish@usmc.mil mailto:merrill.Cunningham@usmc.mil mailto:victor.Gross.Ctr@usmc.mil
If the Contractor is required to correct or re-perform, it shall be at no cost to the Government and any services corrected or re-performed by the Contractor shall be subject to this clause to the same extent as work initially performed.
ARTICLE IX – INVOICES AND PAYMENTS
Contractor shall submit separate invoices for each job order. Each invoice shall include:
BOA Number: M6700419G1000
BOA Order Number
Period covered by the invoice
Item Description and Quantity
Total Cost for the Item or Service
For all services under orders, the invoice description shall include the specific Labor Category and the total number of hours worked as well as any additional actual costs allowable under the order. Receipts for all materials shall be provided with the invoice as proof of prices paid.
ARTICLE X – SAFETY
As applicable, [CONTRACTOR] employees working on site at Blount Island Command shall be required to complete all Blount Island Command specific safety training and all other training as specified by the
Contracting Officer.
ARTICLE XI – WORK PERFORMED ON MARINE CORPS INSTALLATIONS
Work Performed on Marine Corps Installations. The contractor, as a resident of the facility, shall adhere to all rules, orders, regulations, and procedures applicable to residents of the Marine Corps installations where work is to be performed. The following are (although not an all-inclusive list) a listing of the relevant safety guidance that must be adhered to, as applicable, during the performance of the work:
EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual OPNAVINST
5100.23 (series) Navy Occupational Safety and Health Program Manual MCO 5100.29 (series) Marine
Corps Safety Program MCO 5100.8, Marine Corps Occupational Safety and Health (OSH) Policy
NAVMC DIR 5100.8, MARCOR OSH Program Manual.
Additional safety guidance that must be adhered to during the performance of the contract will be provided to the contractor by modification to the contract, and/or by inclusion in individual orders, as appropriate.
ARTICLE XII – ACCIDENT REPORTING
Accident/Injury Reporting. Accidents or injuries related to the contractor’s work place or a contract work activity where a person requires treatment from a medical practitioner are reportable to the Contracting
Officer. The contractor shall report all accidents and/or injuries that occur during the performance of this contract within eight (8) hours of the occurrence. The contractor shall submit written notification via electronic mail, coupled with telephonic notification, to the Contracting Officer and all authorized representatives of the contract, e.g. Contracting Officer Representative, Contracting Officer Technical
Representative, or Quality Assurance Representative. The Contracting Officer or designated representative under the contract shall notify the Installation Safety Official within four (4) hours of the accident/injury notification. The Installation Safety Official for Blount Island Command is Mr. Jeff
Churchill and he may be contacted by email at jeff.churchill@bic.usmc.mil or by telephone at (904) 696-
5623.
ARTICLE XIII – CONTRACTOR MANPOWER REPORTING
As applicable for service orders only, the contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.
mailto:jeff.churchill@bic.usmc.mil https://doncmra.nmci.navy.mil/
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.
Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.
ARTICLE XIV – SERVICE CONTRACT LABOR STANDARDS APPLICABILITY
This Basic Ordering Agreement is subject to the Service Contract Labor Standards. Service Contract
Labor Standards apply to all service work to be performed by persons other than any person employed in a bona fide executive, administrative, or professional capacity as defined in Part 541 of title 29, Code of
Federal Regulations. This Basic Ordering Agreement is specifically for service workers performing under the Service Contract Labor Standards Occupational Code 23000 – Mechanics and Maintenance and
Repair Occupations.
U.S. Department of Labor’s Service Contract Act Wage Determination No. 2015-4539, Revision No.
7, Date of Revision: 07/3/2018, (attached and incorporated herein) is applicable as of the effective date of this agreement. Successor Department of Labor Service Contract Labor Standards Wage
Determinations will be made by modification on a yearly basis and after the required annual review of this agreement.
SERVICE CONTRACT ACT’S OCCUPATIONAL CODE
Occupational Code 23000 – Mechanics and Maintenance and Repair Occupations.
ARTICLE XV – ANNUAL REVIEW OF BASIC ORDERING AGREEMENT
This Basic Ordering Agreement shall be reviewed annually before the anniversary of its effective date and revised as necessary to conform to the requirements of the Federal Acquisition Regulations. The
Government reserves the right to revise the terms and conditions of this Agreement before the annual review due to mandatory statutory requirements. This Basic Ordering Agreement shall be changed only by modifying the Agreement itself and not by individual orders issued under it. Modifying this basic ordering agreement shall not retroactively affect orders previously issued under it.
ATTACHMENT ONE LABOR/INDIRECT
ATTACHMENT ONE: LABOR AND INDIRECT RATES
The Contractor shall include a detailed list of all labor rates in the table below:
NOTE: (Contractor shall add any additional items as necessary to ensure a complete list of all rates are provided)
LABOR POSITION YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
Project Manager
Project Supervisor
Shipyard Painter
Shipyard abrasive blaster
Shipfitter / fabricator
Structural Welder
Pipe Fitter
Pipe Welder https://doncmra.nmci.navy.mil/
Outside Machinist
Inside Machinist
Rigger
Crane operator
Marine Electrician
Carpenter
Insulator
Sheet Metal Mechanic
Firewatch
Shipyard Competent Person
General Laborer
Purchaser/Buyer
The Contractor shall include a detailed list of all other rates in the table below:
NOTE: (Contractor shall add any additional items as necessary to ensure a complete list of all rates are provided).
Indirect Rates YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
Fringe
G&A
Material Handling
Overhead
ATTACHMENT TWO RRDF COST
Attachment Two RRDF Cost Estimate
Provide cost proposal for labor, materials, and equipment to perform the overhaul of One (1) Roll-on / Roll-off
Discharge Facility (RRDF) In accordance with the Statement of Work provided. The RRDF consists of seven (7)
Combination Modules, One (1) Ramp Module, one (1) Docking Module, three (3) Bumper assemblies, and associated equipment.
Contractor’s proposal shall be submitted with their cost broken down for each individual craft by Lot number, craft serial number, and task description in the following format:
Lot # 1 Craft Serial Number – 80CM0835
Item Cost
Docking
High Pressure Wash
Undocking
Prep and Paint Exterior
Prep and Paint Interior spaces (touch-up)
Interior space cleaning
SAR IN1400002 Sacrificial Anode Installation
SAR IN1500011 Flexor Receiver Mod, clearing drain hole
Structural repairs
Total Craft Cost
Craft Serial Number – 80CM0838
High Pressure Wash
Undocking
Prep and Paint Exterior
Prep and Paint Interior spaces (touch-up)
Interior space cleaning
SAR IN1400002 Sacrificial Anode Installation
SAR IN1500011 Flexor Receiver Mod, clearing drain hole
Craft Serial Number – 80CM0839
High Pressure Wash
Undocking
Prep and Paint Exterior
Prep and Paint Interior spaces (touch-up)
Interior space cleaning
SAR IN1400002 Sacrificial Anode Installation
SAR IN1500011 Flexor Receiver Mod, clearing drain hole
Lot Number 1 Total Cost Cost
80CM0835
80CM0838
80CM0839
Lot 1 Total
Lot # 2 Craft Serial Number – 80CM0833
High Pressure Wash
Undocking
Prep and Paint Exterior
Prep and Paint Interior spaces (touch-up)
Interior space cleaning
Craft Serial Number – 80CM0834
High Pressure Wash
Undocking
Prep and Paint Exterior
Prep and Paint Interior spaces (touch-up)
Interior space cleaning
Craft Serial Number – 80CM0836
High Pressure Wash
Undocking
Prep and Paint Exterior
Prep and Paint Interior spaces (touch-up)
Interior space cleaning
Craft Serial Number – 80RM0807
High Pressure Wash
Undocking
Prep and Paint Exterior
Prep and Paint Interior spaces (touch-up)
Interior space cleaning
Lot Number 2 Total Cost Cost
80CM0833
80CM0834
80CM836
80RM0807
Lot 2 Total
Lot # 3 Craft Serial Number – 80CM0837
High Pressure Wash
Undocking
Prep and Paint Exterior
Prep and Paint Interior spaces (touch-up)
Interior space cleaning
Lot # 3 Craft Serial Number – 80DM0805
High Pressure Wash
Undocking
Prep and Paint Exterior
Prep and Paint Interior spaces (touch-up)
Interior space cleaning
Lot Number 3 Total Cost Cost
80CM0837
80DM0805
Lot 3 Total
Lot # 4 Miscellaneous Item Cost
Side Connector Pocket Covers (24 ea.)
RRDF Bumper Assemblies (3 ea.)
Drop-in Lifeline Stanchion Fittings (156 ea.)
RRDF Corner Cover Plates (8 ea.)
Lot 4 Total
Total Cost Item Cost
Lot 1
Lot 2
Lot 3
Lot 4
Total RRDF Overhaul Cost
ATTACHMENT THREE RRDF SOW
Attachment Three RRDF Overhaul SOW
Statement of Work RRDF Overhaul
BOA ORDER ONE
Provide labor, materials, and equipment to perform the overhaul of One (1) Roll-on / Roll-off Discharge Facility
(RRDF). The RRDF consists of seven (7) Combination Modules, One (1) Ramp Module, one (1) Docking Module, three (3) Bumper assemblies, and associated equipment.
1. General This Statement of Work (SOW) lists the requirements for the overhaul and modification of one (1) RRDF platform.
The overhaul will be accomplished in lots of three (3), four (4), and two (2) modules with each lot having a separate
Period of Performance (POP). The POP dates for each lot will be as follows:
Lot 1 January 15, 2019 – April 8, 2019 (Combination Modules 835, 838, and 839)
Lot 2 April 15, 2019 – August 9, 2019 (Combination Modules 833, 834, 836 and Ramp Module 807) (Early delivery of Lot 2 craft to Contractor’s facility will be determined on a case-by-case basis subject to the availability of craft)
Lot 3 August 19, 2019 – October 11, 2019 (Combination Module 837 and Docking Module 805) (Early delivery of Lot 3 craft to Contractor’s facility will be determined on a case-by-case basis subject to the availability of craft)
Lot 4 January 15, 2019 – October 31, 2019 (Miscellaneous - RRDF Bumper Assemblies 3-ea., Side Connector
Pocket Covers 24-ea., Drop-in lifeline stanchion fittings 156-ea., and RRDF corner cover plates 8-ea.) (All miscellaneous equipment, with the exception of the side connector pocket covers, will be loaded on the deck of a
Lot 1 craft for delivery to the Contractor’s facility following award of contract. The side connector pocket covers are currently installed on their respective craft and will have to be removed after the craft are dry docked at the
Contractors’ facility.
Performance Incentive
This contract will provide a performance incentive for early completion of Lots 1-3 with no discrepancies. The performance incentive will be awarded for each individual lot as follows:
Lot 1 Complete NLT April 1, 2019 - $10,000.00
Lot 2 Complete NLT August 5, 2019 - $10,000.00
Lot 3 Complete NLT October 4, 2019 - $10,000.00
Contractor Failure to Deliver According to Schedule
The established Periods of Performance are based on the Government’s ability to extract the INLS modules from the water utilizing the Maritime Prepositioning Ships (MPS) at Blount Island Command. Without the MPS, the government does not currently have launch and recovery capabilities.
Failure to meet the established delivery dates will require the Contractor to schedule and provide all personnel and equipment required to extract the INLS modules and transition to dry docking at Blount Island Command at no cost to the Government. The Contractor shall bear all costs for providing this service in the event of failure to meet the delivery schedule and shall not seek any reimbursement from the Government.
Safety and Security The Contractor shall safeguard all lighterage/watercraft at all times to include the following basic measures:
Protect the vessel from fire, flooding, wind and rain damage.
Protect the vessel from the activities of maintenance personnel or maintenance actions leading to collateral damage or progressive rework in surrounding areas.
Protect the vessel from dirt, debris, clutter, water and salt accumulation.
Protect the vessel from physical security violations and provide safeguards against unauthorized entry, malicious mischief, theft or sabotage.
Protect the vessel from waterborne damage, while berthed or towed.
Additionally, the Contractor shall provide, with their estimate, a written security plan. The security plan shall be maintained and enforced. Deviations from the approved plan requires government approval.
Resource and Work Schedule The Contractor shall ensure on-schedule completion and delivery. The Contractor shall identify and maintain visibility of all problems and potential problems arising during contract performance that could impact the on-schedule completion of the requirements of this contract. Potential problems shall be electronically provided to the Contracting Officer’s representative (COR)
Progress Review Meetings The Contractor shall host and participate in a post award project kick-off meeting at the Contractor’s facility. The Contractor will schedule the kick-off meeting and all Contractor key personnel and the Government shall attend. The Contractor shall host a weekly progress meeting. The Contractor shall prepare an agenda for all meetings that, at a minimum, includes an overview of the project tasks and other logistics issues. After completing each meeting, the Contractor shall develop and distribute meeting minutes and action items to the Government. The Government reserves the right to request a progress review meeting at any time during the duration of this project. The Contractor shall provide an updated detailed project schedule, with percentages of completion, at each progress meeting.
Project Schedule The Contractor shall provide NSMB with a detailed project schedule within 5 working days following the Job Order award. Contractor shall provide the project schedule by printed hard copy with PDF backup to NSMB Branch Head/COR, Mr. William Fish at william.fish@usmc.mil. Any changes to the approved schedule must be brought to the Government’s attention.
mailto:william.fish@usmc.mil
2. References
2.1. NAVSEA Standard Items 009-32 FY19 CH 2
2.2. NAVSEA Standard Items 009-12 FY19 CH 3
2.3. NAVFAC Dwg. # 1600471 Rev H Painting and Deck Covering
2.4. NAVFAC Dwg. # 1600133 Rev C (WAS) Flexible Connector System, Flexor receiver box Assy.
2.5. NAVFAC Dwg. # 1600133 Rev D (IS) Flexible Connector System, Flexor receiver box Assy.
2.6. SAR IN1500011 Flexor Receiver Modification, clearing drain hole
2.7. NAVFAC Dwg. # 1600485 Docking Plan Rev E
2.8. NAVFAC Dwg. # 1600472 Rev E Cathodic Protection
2.9. SAR IN1400002 Sacrificial Anode Installation
2.10. NAVFAC Dwg. # 1600447 Rev J Deck Drains diagram
2.11. NAVFAC Dwg. # 1600493 Rev M Deck Drains A&D
2.12. SAR IN0800022 Male Shear Connector Pipe, Replace with Solid Bar
2.13. NAVFAC Dwg. # 1600401 Rev C Standard Detail Booklet
2.14. NAVFAC Dwg. # 1600402 Rev C Weld Detail Book
2.15. NAVFAC Dwg. # 1600130 Rev F Flexible Connector System, Male Shear Connector
2.16. NSMB Quick Reference Guide dated September 2018
2.17. INLS ABS Deck Drain Repair Plan
2.18. NAVFAC Dwg. # 1600410 Rev C Side, Mid-ship, Scantlings, Non-powered craft
2.19. QA Appendix Forms 1-8, FY18 CH 1
3. Requirements (Lot 1 – CM835, CM838, and CM839)
3.1. 80CM0835
3.1.1. Dock craft and place on storage stands
3.1.2. Perform a high pressure wash to the entire crafts exterior to remove all debris and sea growth from the hull
3.1.3. Undock craft upon completion of all requirements
3.1.4. Grind Smooth all damaged shelf plates on the aft end of craft
3.1.5. Replace the damaged aft male shear connector pipe with a solid bar IAW Reference 2.12
(solid bar will be provided as GFM)
3.1.6. Prep and Paint craft IAW reference 2.1, 2.3, and 2.16
3.1.6.1. Perform protective preparation work to the craft to ready it for prep and painting as follows
3.1.6.1.1. Disassemble and remove 2-ea. flexors
3.1.6.1.2. Disassemble and remove all components from the interiors of 2-ea.
flexor housings
3.1.6.1.3. Disassemble and remove all components from 2-ea. flexor receiver enclosures
3.1.6.1.4. Disassemble and remove the 6-ea. T-bitts w/ covers and all components in the enclosures
3.1.6.1.5. Disassemble and remove the 4-ea. chain plate covers
3.1.6.1.6. Disassemble and remove all removable items from the air station
3.1.6.1.7. Remove all deck gratings at the 2-ea. flexor housings and 2-ea. flexor receiver housings
3.1.6.1.8. Disassemble and remove 4-ea. corner fenders and fender retaining bars
3.1.6.1.9. Install bolts in all open threaded receptacles to facilitate protection during abrasive blasting operations
3.1.6.1.10. Protect fender mounting studs, air station piping, plug off all top deck drain openings, protect the hatch dogs and channel, cap off all open pneumatic lines, and plug all t-bitt housing and side shell drains/vent openings
3.1.6.1.11. Upon completion of painting, reinstall all removed components (with the exception of items listed in section 7) and unplug all plugged receptacles.
3.1.6.1.12. Contact NSMB when craft is ready for removals and cover-up review prior to blasting.
3.1.6.1.13. Provide transportation and rigging to relocate the craft to the fleeted position and prep/paint IWO docking blocks.
3.1.6.1.14. Prep and paint all exterior surfaces of the craft IAW reference 2.1, 2.3, and 2.16, to include all craft hull markings (i.e. craft serial numbers, draft marks and divisional bulkhead hash marks, etc.) and all painted items removed in
3.1.6.1. Use reference 2.19 for inspection and documentation requirements. All checkpoint documentation shall be provided to NSMB upon completion of the checkpoint, regardless of pass or fail
3.1.6.1.15. Remove and disassemble the 24” hatch, Mechanical clean, prime, and paint the hatch and gasket channel, reassemble and reinstall the hatch with a new gasket and hardware
3.1.6.1.16. Prep the inside surfaces of all overboard drain pipes to an SSPC-SP11 cleanliness with a hone or flapper sanding attachment or other rust removal tool and paint IAW paint manufacturer specifications. Each drain shall be cleaned out to the first elbow or hose connection.
3.1.6.1.17. Perform a free flow water test on all overboard deck drains prior to blast and upon completion of all painting to ensure proper flow. Provide documentation for satisfactory test. Submit CFR for any plugged drains prior to blast.
3.1.6.1.18. Perform System Alteration IN1400002 Sacrificial Anode Installation IAW reference 2.8 and 2.9 to include touch-up painting on the interior disturbed areas
3.1.6.1.19. Perform System Alteration IN1500011 Flexor receiver modification, clearing the drain hole, IAW references 2.4 thru 2.6.
3.1.6.1.20. Dry space, wipe clean, and remove blast grit from Void #1
3.1.6.1.21. Dry space, wipe clean Void # 2
3.1.6.1.22. Dry space, wipe clean Void # 3
3.1.6.1.23. Remove blast grit from Void # 4
3.2. 80CM0838
3.2.1. Dock craft and place on storage stands
3.2.2. Perform a high pressure wash to the entire crafts exterior to remove all debris and sea growth from the hull
3.2.3. Undock craft upon completion of all requirements
3.2.4. Grind Smooth the FWD STBD damaged shelf plate above male shear connector pipe, grind smooth FWD port flexor shelf (remove broken lifeline stanchion bolt), Remove damaged area and install 2 ea 12”x12” inserts in the FWD STBD flexor receiver shelf
3.2.5. Grind smooth the FWD female shear connector housing at the STBD vertical side
3.2.6. Prep and Paint craft IAW reference 2.1, 2.3, and 2.16
3.2.6.1. Perform protective preparation work to the craft to ready it for prep and painting as follows
3.2.6.1.1. Disassemble and remove 2-ea. flexors
3.2.6.1.2. Disassemble and remove all components from the interiors of 2-ea.
flexor housings
3.2.6.1.3. Disassemble and remove all components from 2-ea. flexor receiver enclosures
3.2.6.1.4. Disassemble and remove the 6-ea. T-bitts w/ covers and all components in the enclosures
3.2.6.1.5. Disassemble and remove the 4-ea. chain plate covers
3.2.6.1.6. Disassemble and remove all removable items from the air station
3.2.6.1.7. Remove all deck gratings at the 2-ea. flexor housings and 2-ea. flexor receiver housings
3.2.6.1.8. Disassemble and remove 4-ea. corner fenders and fender retaining bars
3.2.6.1.9. Install bolts in all open threaded receptacles to facilitate protection during abrasive blasting operations
3.2.6.1.10. Protect fender mounting studs, air station piping, plug off all top deck drain openings, protect the hatch dogs and channel, cap off all open pneumatic lines, and plug all t-bitt housing and side shell drains/vent openings
3.2.6.1.11. Upon completion of painting, reinstall all removed components (with the exception of items listed in section 7) and unplug all plugged receptacles.
3.2.6.1.12. Contact NSMB when craft is ready for removals and cover-up review prior to blasting.
3.2.6.1.13. Provide transportation and rigging to relocate the craft to the fleeted position and prep/paint IWO docking blocks.
3.2.6.1.14. Prep and paint all exterior surfaces of the craft IAW reference 2.1, 2.3, and 2.16, to include all craft hull markings (i.e. craft serial numbers, draft marks and divisional bulkhead hash marks, etc.) and all painted items removed in
3.2.6.1. Use reference 2.19 for inspection and documentation requirements. All checkpoint documentation shall be provided to NSMB upon completion of the checkpoint, regardless of pass or fail
3.2.6.1.15. Remove and disassemble the 24” hatch, Mechanical clean, prime, and paint the hatch and gasket channel, reassemble and reinstall the hatch with a new gasket and hardware
3.2.6.1.16. Prep the inside surfaces of all overboard drain pipes to an SSPC-SP11 cleanliness with a hone or flapper sanding attachment or other rust removal tool and paint IAW paint manufacturer specifications. Each drain shall be cleaned out to the first elbow or hose connection.
3.2.6.1.17. Perform a free flow water test on all overboard deck drains prior to blast and upon completion of all painting to ensure proper flow. Provide documentation for satisfactory test. Submit CFR for any plugged drains prior to blast.
3.2.6.1.18. Perform System Alteration IN1400002 Sacrificial Anode Installation IAW reference 2.8 and 2.9 to include touch-up painting on the interior disturbed areas
3.2.6.1.19. Perform System Alteration IN1500011 Flexor receiver modification, clearing the drain hole, IAW references 2.4 thru 2.6.
3.2.6.1.20. Remove dirt and wipe clean the Store room
3.2.6.1.21. Pressure wash, pump, and wipe dry Void #1
3.2.6.1.22. Pressure wash, pump, and wipe dry Void # 2
3.2.6.1.23. Remove dirt and wipe clean Void # 3
3.2.6.1.24. Remove dirt and wipe clean Void # 4
3.3. 80CM0839
3.3.1. Dock craft and place on storage stands
3.3.2. Perform a high pressure wash to the entire crafts exterior to remove all debris and sea growth from the hull
3.3.3. Undock craft upon completion of all requirements
3.3.4. Repair the PORT and STBD FWD upper corners of the craft IWO damages. (Insert the side shell, deck, headlog, and chine bars). Remove doubler on STBD side shell IWO puncture hole and install a 12” x 12” insert IAW NAVSEA STD Item 009-12.
3.3.4.1. Checkpoints (Gov’t)
3.3.4.1.1. Layout, prior to cutting
3.3.4.1.2. Fit-up inspection, prior to production welding
3.3.4.1.3. Final weld inspection
3.3.4.1.4. Watertight integrity testing
3.3.5. Prep and Paint craft IAW reference 2.1, 2.3, and 2.16
3.3.5.1. Perform protective preparation work to the craft to ready it for prep and painting as follows
3.3.5.1.1. Disassemble and remove 2-ea. flexors
3.3.5.1.2. Disassemble and remove all components from the interiors of 2-ea.
flexor housings
3.3.5.1.3. Disassemble and remove all components from 2-ea. flexor receiver enclosures
3.3.5.1.4. Disassemble and remove the 6-ea. T-bitts w/ covers and all components in the enclosures
3.3.5.1.5. Disassemble and remove the 4-ea. chain plate covers
3.3.5.1.6. Disassemble and remove all removable items from the air station
3.3.5.1.7. Remove all deck gratings at the 2-ea. flexor housings and 2-ea. flexor receiver housings
3.3.5.1.8. Disassemble and remove 4-ea. corner fenders and fender retaining bars
3.3.5.1.9. Remove 4-ea. Side Connector pocket covers
3.3.5.1.10. Install bolts in all open threaded receptacles to facilitate protection during abrasive blasting operations
3.3.5.1.11. Protect fender mounting studs, air station piping, plug off all top deck drain openings, protect the hatch dogs and channel, cap off all open pneumatic lines, and plug all t-bitt housing and side shell drains/vent openings
3.3.5.1.12. Upon completion of painting, reinstall all removed components (with the exception of items listed in section 7) and unplug all plugged receptacles.
3.3.5.1.13. Contact NSMB when craft is ready for removals and cover-up review prior to blasting.
3.3.5.1.14. Provide transportation and rigging to relocate the craft to the fleeted position and prep/paint IWO docking blocks.
3.3.5.1.15. Prep and paint all exterior surfaces of the craft IAW reference 2.1, 2.3, and 2.16, to include all craft hull markings (i.e. craft serial numbers, draft marks and divisional bulkhead hash marks, etc.) and all painted items removed in 3.3.5.1. Use reference 2.19 for inspection and documentation requirements. All checkpoint documentation shall be provided to NSMB upon completion of the checkpoint, regardless of pass or fail
3.3.5.1.16. Apply 80 SQ FT of steel seam to areas of heavy pitting on the main deck
3.3.5.1.17. Remove and disassemble the 24” hatch, Mechanical clean, prime, and paint the hatch and gasket channel, reassemble and reinstall the hatch with a new gasket and hardware
3.3.5.1.18. Prep the inside surfaces of all overboard drain pipes to an SSPC-SP11 cleanliness with a hone or flapper sanding attachment or other rust removal tool and paint IAW paint manufacturer specifications. Each drain shall be cleaned out to the first elbow or hose connection.
3.3.5.1.19. Perform a free flow water test on all overboard deck drains prior to blast and upon completion of all painting to ensure proper flow. Provide documentation for satisfactory test. Submit CFR for any plugged drains prior to blast.
3.3.5.1.20. Perform System Alteration IN1400002 Sacrificial Anode Installation IAW reference 2.8 and 2.9 to include touch-up painting on the interior disturbed areas
3.3.5.1.21. Perform System Alteration IN1500011 Flexor receiver modification, clearing the drain hole, IAW references 2.4 thru 2.6.
3.3.5.1.22. Pressure wash, pump, and wipe dry Store room
3.3.5.1.23. Pressure wash, pump, and wipe dry Void #1
3.3.5.1.24. Dry space, wipe clean Void # 2
3.3.5.1.25. Remove dirt, wipe clean Void # 3
3.3.5.1.26. Pressure wash, pump, wipe dry, and perform 144 SQFT of touch-up painting on the deck and 3” up on BHD in Void #4 (Surface prep to be SSPC-SP11 IWO paint repairs)
4. Requirements (Lot 2 – CM833, CM834, CM836 and RM807)
4.1. 80CM0833
4.1.1. Dock craft and place on storage stands
4.1.2. Perform a high pressure wash to the entire crafts exterior to remove all debris and sea growth from the hull
4.1.3. Undock craft upon completion of all requirements
4.1.4. Grind Smooth all damaged shelf plates on the AFT PORT, FWD PORT, and FWD STBD end of craft
4.1.5. Grind and contour the FWD male shear connector and the FWD female shear connector housing
4.1.6. Perform clad weld repair (36”) on the FWD PORT corner vertical seam IAW reference 2.18
4.1.7. Prep and Paint craft IAW reference 2.1, 2.3, and 2.16
4.1.7.1. Perform protective preparation work to the craft to ready it for prep and painting as follows
4.1.7.1.1. Disassemble and remove 2-ea. flexors
4.1.7.1.2. Disassemble and remove all components from the interiors of 2-ea.
flexor housings
4.1.7.1.3. Disassemble and remove all components from 2-ea. flexor receiver enclosures
4.1.7.1.4. Disassemble and remove the 6-ea. T-bitts w/ covers and all components in the enclosures
4.1.7.1.5. Disassemble and remove the 4-ea. chain plate covers
4.1.7.1.6. Disassemble and remove all removable items from the air station
4.1.7.1.7. Remove all deck gratings at the 2-ea. flexor housings and 2-ea. flexor receiver housings
4.1.7.1.8. Disassemble and remove 4-ea. corner fenders and fender retaining bars
4.1.7.1.9. Remove 5-ea. Side Connector pocket covers
4.1.7.1.10. Install bolts in all open threaded receptacles to facilitate protection during abrasive blasting operations
4.1.7.1.11. Protect fender mounting studs, air station piping, plug off all top deck drain openings, protect the hatch dogs and channel, cap off all open pneumatic lines, and plug all t-bitt housing and side shell drains/vent openings
4.1.7.1.12. Upon completion of painting, reinstall all removed components (with the exception of items listed in section 7) and unplug all plugged receptacles.
4.1.7.1.13. Contact NSMB when craft is ready for removals and cover-up review prior to blasting.
4.1.7.1.14. Provide transportation and rigging to relocate the craft to the fleeted position and prep/paint IWO docking blocks.
4.1.7.1.15. Prep and paint all exterior surfaces of the craft IAW reference 2.1, 2.3, and 2.16, to include all craft hull markings (i.e. craft serial numbers, draft marks and divisional bulkhead hash marks, etc.) and all painted items removed in 4.1.7.1. Use reference 2.19 for inspection and documentation requirements. All checkpoint documentation shall be provided to NSMB upon completion of the checkpoint, regardless of pass or fail
4.1.7.1.16. Apply 30 SQ FT of steel seam to areas of heavy pitting on the main deck
4.1.7.1.17. Remove and disassemble the 24” hatch, Mechanical clean, prime, and paint the hatch and gasket channel, reassemble and reinstall the hatch with a new gasket and hardware
4.1.7.1.18. Prep the inside surfaces of all overboard drain pipes to an SSPC-SP11 cleanliness with a hone or flapper sanding attachment or other rust removal tool and paint IAW paint manufacturer specifications. Each drain shall be cleaned out to the first elbow or hose connection.
4.1.7.1.19. Perform a free flow water test on all overboard deck drains prior to blast and upon completion of all painting to ensure proper flow. Provide documentation for satisfactory test. Submit CFR for any plugged drains prior to blast.
4.1.7.1.20. Pressure wash, pump, and wipe dry Store room
4.1.7.1.21. Remove blast grit, wipe clean, and perform 60 SQFT of touch-up painting in Void #1 (Surface prep to be SSPC-SP11 IWO paint repairs)
4.1.7.1.22. Remove dirt, wipe clean Void # 2
4.1.7.1.23. Remove dirt, wipe clean Void # 3
4.1.7.1.24. Pressure wash, pump, and wipe dry void # 4
4.2. 80CM0834
4.2.1. Dock craft and place on storage stands
4.2.2. Perform a high pressure wash to the entire crafts exterior to remove all debris and sea growth from the hull
4.2.3. Undock craft upon completion of all requirements
4.2.4. Grind Smooth damaged shelf plates FWD PORT and AFT PORT end of craft
4.2.5. Prep and Paint craft IAW reference 2.1, 2.3, and 2.16
4.2.5.1. Perform protective preparation work to the craft to ready it for prep and painting as follows
4.2.5.1.1. Disassemble and remove 2-ea. flexors
4.2.5.1.2. Disassemble and remove all components from the interiors of 2-ea.
flexor housings
4.2.5.1.3. Disassemble and remove all components from 2-ea. flexor receiver enclosures
4.2.5.1.4. Disassemble and remove the 6-ea. T-bitts w/ covers and all components in the enclosures
4.2.5.1.5. Disassemble and remove the 4-ea. chain plate covers
4.2.5.1.6. Disassemble and remove all removable items from the air station
4.2.5.1.7. Remove all deck gratings at the 2-ea. flexor housings and 2-ea. flexor receiver housings
4.2.5.1.8. Disassemble and remove 4-ea. corner fenders and fender retaining bars
4.2.5.1.9. Remove 4-ea. Side Connector pocket covers
4.2.5.1.10. Install bolts in all open threaded receptacles to facilitate protection during abrasive blasting operations
4.2.5.1.11. Protect fender mounting studs, air station piping, plug off all top deck drain openings, protect the hatch dogs and channel, cap off all open pneumatic lines, and plug all t-bitt housing and side shell drains/vent openings
4.2.5.1.12. Upon completion of painting, reinstall all removed components (with the exception of items listed in section 7) and unplug all plugged receptacles.
4.2.5.1.13. Contact NSMB when craft is ready for removals and cover-up review prior to blasting.
4.2.5.1.14. Provide transportation and rigging to relocate the craft to the fleeted position and prep/paint IWO docking blocks.
4.2.5.1.15. Prep and paint all exterior surfaces of the craft IAW reference 2.1, 2.3, and 2.16, to include all craft hull markings (i.e. craft serial numbers, draft marks and divisional bulkhead hash marks, etc.) and all painted items removed in 4.2.5.1. Use reference 2.19 for inspection and documentation requirements. All checkpoint documentation shall be provided to NSMB upon completion of the checkpoint, regardless of pass or fail
4.2.5.1.16. Remove and disassemble the 24” hatch, Mechanical clean, prime, and paint the hatch and gasket channel, reassemble and reinstall the hatch with a new gasket and hardware
4.2.5.1.17. Prep the inside surfaces of all overboard drain pipes to an SSPC-SP11 cleanliness with a hone or flapper sanding attachment or other rust removal tool and paint IAW paint manufacturer specifications. Each drain shall be cleaned out to the first elbow or hose connection.
4.2.5.1.18. Perform a free flow water test on all overboard deck drains prior to blast and upon completion of all painting to ensure proper flow. Provide documentation for satisfactory test. Submit CFR for any plugged drains prior to blast.
4.2.5.1.19. Pressure wash, pump, and wipe dry Store room
4.2.5.1.20. Remove dirt and blast grit, wipe clean Void # 1
4.2.5.1.21. Remove dirt and wipe clean Void # 2
4.2.5.1.22. Remove dirt and wipe clean Void # 3
4.2.5.1.23. Pressure wash, pump, wipe dry, and perform 15 SQFT of touch-up painting in void # 4 (Surface prep to be SSPC-SP11 IWO paint repairs)
4.3. 80CM0836
4.3.1. Dock craft and place on storage stands
4.3.2. Perform a high pressure wash to the entire crafts exterior to remove all debris and sea growth from the hull
4.3.3. Undock craft upon completion of all requirements
4.3.4. Grind Smooth damaged shelf plates on the FWD STBD, AFT STBD, and FWD PORT end of craft. Renew broken bolt for lifeline system at FWD PORT end
4.3.5. Prep and Paint craft IAW reference 2.1, 2.3, and 2.16
4.3.5.1. Perform protective preparation work to the craft to ready it for prep and painting as follows
4.3.5.1.1. Disassemble and remove 2-ea. flexors
4.3.5.1.2. Disassemble and remove all components from the interiors of 2-ea.
flexor housings
4.3.5.1.3. Disassemble and remove all components from 2-ea. flexor receiver enclosures
4.3.5.1.4. Disassemble and remove the 6-ea. T-bitts w/ covers and all components in the enclosures
4.3.5.1.5. Disassemble and remove the 4-ea. chain plate covers
4.3.5.1.6. Disassemble and remove all removable items from the air station
4.3.5.1.7. Remove all deck gratings at the 2-ea. flexor housings and 2-ea. flexor receiver housings
4.3.5.1.8. Disassemble and remove 4-ea. corner fenders and fender retaining bars
4.3.5.1.9. Remove 4-ea. Side Connector pocket covers
4.3.5.1.10. Install bolts in all open threaded receptacles to facilitate protection during abrasive blasting operations
4.3.5.1.11. Protect fender mounting studs, air station piping, plug off all top deck drain openings, protect the hatch dogs and channel, cap off all open pneumatic lines, and plug all t-bitt housing and side shell drains/vent openings
4.3.5.1.12. Upon completion of painting, reinstall all removed components (with the exception of items listed in section 7) and unplug all plugged receptacles.
4.3.5.1.13. Contact NSMB when craft is ready for removals and cover-up review prior to blasting.
4.3.5.1.14. Provide transportation and rigging to relocate the craft to the fleeted position and prep/paint IWO docking blocks.
4.3.5.1.15. Prep and paint all exterior surfaces of the craft IAW reference 2.1, 2.3, and 2.16, to include all craft hull markings (i.e. craft serial numbers, draft marks and divisional bulkhead hash marks, etc.) and all painted items removed in 4.3.5.1. Use reference 2.19 for inspection and documentation requirements. All checkpoint documentation shall be provided to NSMB upon completion of the checkpoint, regardless of pass or fail
4.3.5.1.16. Remove and disassemble the 24” hatch, Mechanical clean, prime, and paint the hatch and gasket channel, reassemble and reinstall the hatch with a new gasket and hardware
4.3.5.1.17. Prep the inside surfaces of all overboard drain pipes to an SSPC-SP11 cleanliness with a hone or flapper sanding attachment or other rust removal tool and paint IAW paint manufacturer specifications.